Public Works Department-PWD has published Construction Of Cement Concrete Drain At Galizoo Geerhati Ward No . 11. Submission Date for this Tender is 21-07-2020. Drainage Tenders in Galizoo Geerhati Ward 11 Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: - Construction of cement concrete drain at Galizoo Geerhati Ward No. 11 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10Sqm on plan, depth up to 1.5mtr including disposal of excavated earth upto1mtr from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soil. | 46.89 | Cum | |
2 | 2 | Providing & laying of Dry stone soling tightly hand packed on horizontal level incld. Hand ramming and all carriages upo site of work complete | 4.88 | Cum | |
3 | 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level a. 1:4:8 (1Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) Crushed all carriages upo site of work complete | 4.88 | Cum | |
4 | 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level a. 1:3:6 (1Cement: 3 coarse sand: 6 grade stone aggregate 20mm nominal size) Crushed all carriages upo site of work complete | 13.725 | Cum | |
5 | 5 | Centering and shuttering including strutting propping etc removal of form work Foundation footings basis of columns etc for mass concrete incld all carriages upo site of work complete | 109.8 | sqm | |
6 | 6 | 12mm thick cement plaster in mix 1:4 incl. all carriages of material upto site of work all complete job. | 85.4 | sqm | |
7 | 7 | 50mm thick cement conc.flooring1:2:4(1cement: 2 course sand: 4 graded stone agg) finished within a floating coat of neat cement including cement slurry but excl.the cost of nosing of steps etc compelte with 20mm nominal size stoneagg(crushed)incoluding all carriages | 18.3 | sqm | |
8 | 8 | Providing and laying of RCC spun pipes incl. earth work , labour charges carriage of pipe etc to the site of work all complete job. (12” dia) | 12.2 | No | |
9 | 9 | Providing and fixing of Sign Board and taking of Photographs before, during and after execution of work complete job and writing of letters | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail