West Bengal Power Development Corporation Limited has published Annual Contract For Regular Cleaning Of Power House Area Including Optional Job Of U-1 To U-5 Of Bktpp. Submission Date for this Tender is 30-07-2020. Forming Tools Tenders in Bakreswar Thermal Power Project West Bengal. Bidders can get complete Tender details and download the document.
Name of Work: ANNUAL CONTRACT FOR REGULAR CLEANING OF POWER HOUSE AREA (BOILER, TURBINE & AUXILIARY EQUIPMENT), INCLUDING OPTIONAL JOB OF UNIT#1 – 5 OF | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Power House cleaning (Boiler, Turbine & Auxiliary Equipments) of U#1 to 5 | BI01010001010000000000000515BI0100001113 | 12 | MONTH |
2 | 2 | Cleaning of Boiler Pent House top with air & Cleaning of Buck-stays in each floor/tier of Boiler by Scrapper then with air | BI01010001010000000000000515BI0100001114 | 120 | MANDAY |
3 | 3 | Cleaning of Coal Dust from Column Pocket of Mill Bay by Scrapper then with air | BI01010001010000000000000515BI0100001115 | 120 | MANDAY |
4 | 4 | Cleaning of Coal Dust by Scrapper then with air from walkways of Coal Bunker surroundings adjacent to Power House situated at just below 22.5 Mtr. level | BI01010001010000000000000515BI0100001116 | 180 | MANDAY |
5 | 5 | Profuse Leakage Oil recovery to Oil Drum then Shifting of Oil Drum and pouring to a suitable place. Cleaning of Oily Area/ Place with Bunyon cut piece | BI01010001010000000000000515BI0100001117 | 120 | MANDAY |
6 | 6 | Cleaning of Debris from the Unit on Emergency Condition | BI01010001010000000000000515BI0100001118 | 160 | MANDAY |
7 | 7 | Cleaning of coal dust from cable tray thoroughly in Cable Spreader Room & shifting those material to designated place. | BI01010001010000000000000515BI0100001119 | 100 | MANDAY |
8 | 8 | Cleaning of Stg-II Mill rejection bunker and its accessories, walk ways and pipe rack from mill to\nrejection bunker with air / water. | BI01010001010000000000000515BI0100001120 | 80 | MANDAY |
9 | 9 | Waste Oil recovery from drain and shifting / storage to proper place | BI01010001010000000000000515BI0100001121 | 80 | MANDAY |
10 | 10 | Foreign Material (Ferrous & Non-ferrous) removing from any coal bunker in any unit | BI01010001010000000000000515BI0100001122 | 30 | NO |
11 | 11 | Coal Arch Breaking and Liner Plates condition checking in any Bunker of any unit. | BI01010001010000000000000515BI0100001123 | 20 | NO |
12 | 12 | Pocking & Hammering of any Coal Bunker in any Unit, when coal flow will be restricted due to jamming or formation of rat hole and this type of job is to be carried out during running condition of Mill. | BI01010001010000000000000515BI0100001124 | 40 | NO |
13 | 13 | Measurement of Oil level by Dip-Stick in HFO tank 1 & 2 and LDO tank 1&2 in the first week of every month and in case of additional requirement as and when required. | BI01010001010000000000000515BI0100001125 | 24 | NO |
14 | 14 | GST as applicable will be paid extra on production of proper documents | BI01010001010000000000000515BI0100001126 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail