}

Selection Of Implementation Agency ( Ia ) For Implementation Of Integrated Security And Traffic Management System ( Istms ) For Noida City Selection Of Implementation Agency ( Ia ) For Implementation OfIntegrated Security And Traffic Management Sy, Noida-Uttar Pradesh

New Okhla Industrial Development Authority-NOIDA has published Selection Of Implementation Agency ( Ia ) For Implementation Of Integrated Security And Traffic Management System ( Istms ) For Noida City Selection Of Implementation Agency ( Ia ) For Implementation OfIntegrated Security And Traffic Management Sy. Submission Date for this Tender is 09-07-2020. Integrated Security System Tenders in Noida Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24778406
Selection Of Implementation Agency ( Ia ) For Implementation Of Integrated Security And Traffic Management System ( Istms ) For Noida City Selection Of Implementation Agency ( Ia ) For Implementation OfIntegrated Security And Traffic Management Sy
Open Tender
Indian
Uttar Pradesh
Noida
09-07-2020

Tender Details

Selection Of Implementation Agency ( Ia ) For Implementation Of Integrated Security And Traffic Management System ( Istms ) For Noida City Selection Of Implementation Agency ( Ia ) For Implementation Of Integrated Security And Traffic Management System ( Istms ) For Noida City

Key Value

Document Fees
INR 10000 /-
EMD
INR 10000000.0 /-
Tender Value
INR 85.85 Crore /-

BOQ Items

Name of Work: Selection of Implementation Agency (IA) for Implementation of Integrated Security and Traffic Management System (ISTMS) for Noida city.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Hardware - Field Equipments
2 1.1 2MP IP Outdoor PTZ Camera (IP 66 housing, 24VAC, power supply and Pole mount bracket) 76 No.
3 2 2MP IP Fixed Box HD Camera with varifocal lens & IP 66 housing for outdoor use 278 No.
4 3 ANPR Camera 693 No.
5 4 Speed detection Cameras, LPU, Radar and Software 18 No.
6 5 LPU For ANPR/ Video analytics Camera 164 No.
7 6 ATCC Controller and Accessories 40 No.
8 7 Environment sensor 25 No.
9 8 Public announcement system \nfor outdoor use with all Accessories 82 No.
10 9 Variable Message Signboard (3.8 by 1.9 mtr) 10 No.
11 10 Variable Message Signboard (2.8 by 1.9 mtr) 10 No.
12 11 Junction Box IP 66 Outdoor for Power Supply, Network Switch 143 No.
13 12 small Junction Box IP 66 Outdoor for ANPR LPU 273 No.
14 13 Online UPS with 1 hours backup with stand at each junction Box( as per load requirement) 143 No.
15 14 16/24 Port Industrial Grade Managed network switch at each junction Box (PoE) 143 No.
16 15 Pole structure for Cameras (Cosidering 9m/6m poles + foundation bolts as per requirement) 76 No.
17 16 Pole with Arm/ cantilever 272 No.
18 17 Gantry for Camera /Variable Message Signboard 20 No.
19 17.1 Passive components (wired network)
20 18 CAT-6 24 port Jack Panel 143 No.
21 19 CAT-6 Patch cords 1 mtrs 1061 No.
22 20 CAT-6 Patch cords 3mtrs 1061 No.
23 21 6 Core Rack Mounted LIU with Splice tray 143 No.
24 22 RJ 45 connectors 2000 No.
25 23 Voltage Surge Suppresor for junction Box 143 No.
26 24 100m Power Cable till Junction Box 143 No.
27 25 CAT-6 Cable for Camera to Junction Box 84000 Mtr
28 25.1 Civil & Electrical Work
29 26 Civil work for Cameras junction 84 Job
30 27 Civil work for Variable Message Signboard junction 20 Job
31 27.1 Hardware - Command & Control Centre
32 28 Workstation Desktop surveillance systems with display 10 No.
33 29 Laser based video wall 1 No.
34 30 Keyboard Joystick to control PTZ Cameras 3 No.
35 31 Semi dome cameras for internal surveillance 10 No.
36 32 LED TV for war room, cafeteria, reception 3 No.
37 33 PSTN phones for each desk, meeting room, war room, cafeteria 5 No.
38 34 24 port Gigabit, Layer 3 Switch 2 No.
39 35 PA system Dialling Consol with license 2 No.
40 36 Diesel Generator (30 KVA) 2 No.
41 37 UPS 30 KVA with 1 Hr SMF battery backup (1+1 Redundancy) 2 No.
42 38 Printer for printing challans 5 No.
43 39 Site Preparation Cost (50x 50 ft)
44 39.1 Furnitures & fixtures (tables,chairs,cublicle separator) 1 No.
45 39.2 Carpeting including war room, meeting room etc. 1 No.
46 39.3 Electrical lighting & fittings 1 No.
47 39.4 Civil work (whitewash etc) 1 No.
48 39.5 Access control 1 No.
49 39.6 Fire detector & proofing 1 No.
50 39.7 Air conditioning (2 Ton each) 3 No.
51 39.8 Cloud and Infrastructure
52 40 Cloud requirement for complete solution including Servers, Firewall, Storage, Networking components and Infrastructure during implementation\n 1 Lot
53 40.1 1st Year O&M cost 1 Year
54 40.2 2nd Year O&M cost 1 Year
55 40.3 3rd Year O&M cost 1 Year
56 40.4 4th Year O&M cost 1 Year
57 40.5 5th Year O&M cost 1 Year
58 40.6 Surveillance Software
59 41 Video Management Software 1 Base License
60 42 Video Management Software 360 Per Camera Licence
61 43 Facial Recoginition Software 2 Per camera License
62 43.1 ITMS
63 44 TCCC Platform 1 License
64 45 Video Analytics Software 1 Base License
65 46 Video Analytics Software(with multiple analytics,as No helmet, Triple riding etc) 275 License
66 47 ANPR, RLVD, analytics Base license 1 Base License
67 48 ANPR per camera license 693 Per Camera Licence
68 49 Red light violation software 150 Per Camera Licence
69 50 eChallan software 1 License
70 51 Variable message signboard software 1 License
71 52 Public announcement system 82 License
72 53 ATCC Software 1 License
73 54 Environmnet Sensor Software 1 License
74 55 Integration With RTO DB and other interfaces 1 Lot
75 55.1 Other Software
76 56 Server Virtualization Software 1 License
77 57 Server OS 50 License
78 58 Anti-Virus & Theft protection 1 License
79 59 Enterprise Management System(EMS/NMS) 1 Licence
80 60 Data Base Software 1 License
81 60.1 Network
82 61 Connectivity Charges 84 Junction over MPLS for 1 year\n 5 Years
83 62 Connectivity Charges between DC (over Cloud) and TCCC (Primary and secondary) for 1 years 5 Years
84 62.1 Manpower Services (Implementation Phase)
85 63 Project Director 01 Nos 1 No.
86 64 Project Manager 01 No. for 06 Months 6 Months
87 65 Cloud Solution Architect (IT,DC & C&C Infrastructure) 01 No. for 03 Months 3 Months
88 66 Solution Architect (Network and CCTV surveillance system) 01 No. for 05 Months 5 Months
89 67 Technical Lead Cum Trainer (IT and Surveillance industry) 01 No. for 06 Months 6 Months
90 68 Site implementation/installation team consisting of 20 No. for 06 Months 120 Months
91 69 System and NW Administrator 01 No. for 04 Months 4 Months
92 70 Database Administrator 01 No. for 03 Months 3 Months
93 70.1 O&M Phase
94 71 Project Manager 60 Months
95 72 IT Administrator 60 Months
96 73 Site Maintenance team of 3 members for 5 years 60 Months
97 74 IT Helpdesk personal 60 Months
98 74.1 Annual Maintenance Contract (AMC) for Existing HTMS System
99 75 Annual Maintenance charges for Existing HTMS system with all equipments, Hardware and software with deployment of technical mobile maintenance team. 24x7 patrolling vehicle and security guards. 12 Months
100 75.1 Annual Maintenance Contract (AMC) for ITMS System including HTMS
101 76 AMC after completion of warrantty period of 1 year post Go-Live which includes comrehensive repair and maintenance of all equipment, hardware and software with deployment of technical mobile maintenance team, including insurance all all the hardware against thefy, accident, physical damage, force majure etc.
102 76.1 2nd Year 1 Year
103 76.2 3rd Year 1 Year
104 76.3 4th Year 1 Year
105 76.4 5th Year 1 Year
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail