New Okhla Industrial Development Authority-NOIDA has published Selection Of Implementation Agency ( Ia ) For Implementation Of Integrated Security And Traffic Management System ( Istms ) For Noida City Selection Of Implementation Agency ( Ia ) For Implementation OfIntegrated Security And Traffic Management Sy. Submission Date for this Tender is 09-07-2020. Integrated Security System Tenders in Noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Selection of Implementation Agency (IA) for Implementation of Integrated Security and Traffic Management System (ISTMS) for Noida city. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Hardware - Field Equipments | |||
2 | 1.1 | 2MP IP Outdoor PTZ Camera (IP 66 housing, 24VAC, power supply and Pole mount bracket) | 76 | No. | |
3 | 2 | 2MP IP Fixed Box HD Camera with varifocal lens & IP 66 housing for outdoor use | 278 | No. | |
4 | 3 | ANPR Camera | 693 | No. | |
5 | 4 | Speed detection Cameras, LPU, Radar and Software | 18 | No. | |
6 | 5 | LPU For ANPR/ Video analytics Camera | 164 | No. | |
7 | 6 | ATCC Controller and Accessories | 40 | No. | |
8 | 7 | Environment sensor | 25 | No. | |
9 | 8 | Public announcement system \nfor outdoor use with all Accessories | 82 | No. | |
10 | 9 | Variable Message Signboard (3.8 by 1.9 mtr) | 10 | No. | |
11 | 10 | Variable Message Signboard (2.8 by 1.9 mtr) | 10 | No. | |
12 | 11 | Junction Box IP 66 Outdoor for Power Supply, Network Switch | 143 | No. | |
13 | 12 | small Junction Box IP 66 Outdoor for ANPR LPU | 273 | No. | |
14 | 13 | Online UPS with 1 hours backup with stand at each junction Box( as per load requirement) | 143 | No. | |
15 | 14 | 16/24 Port Industrial Grade Managed network switch at each junction Box (PoE) | 143 | No. | |
16 | 15 | Pole structure for Cameras (Cosidering 9m/6m poles + foundation bolts as per requirement) | 76 | No. | |
17 | 16 | Pole with Arm/ cantilever | 272 | No. | |
18 | 17 | Gantry for Camera /Variable Message Signboard | 20 | No. | |
19 | 17.1 | Passive components (wired network) | |||
20 | 18 | CAT-6 24 port Jack Panel | 143 | No. | |
21 | 19 | CAT-6 Patch cords 1 mtrs | 1061 | No. | |
22 | 20 | CAT-6 Patch cords 3mtrs | 1061 | No. | |
23 | 21 | 6 Core Rack Mounted LIU with Splice tray | 143 | No. | |
24 | 22 | RJ 45 connectors | 2000 | No. | |
25 | 23 | Voltage Surge Suppresor for junction Box | 143 | No. | |
26 | 24 | 100m Power Cable till Junction Box | 143 | No. | |
27 | 25 | CAT-6 Cable for Camera to Junction Box | 84000 | Mtr | |
28 | 25.1 | Civil & Electrical Work | |||
29 | 26 | Civil work for Cameras junction | 84 | Job | |
30 | 27 | Civil work for Variable Message Signboard junction | 20 | Job | |
31 | 27.1 | Hardware - Command & Control Centre | |||
32 | 28 | Workstation Desktop surveillance systems with display | 10 | No. | |
33 | 29 | Laser based video wall | 1 | No. | |
34 | 30 | Keyboard Joystick to control PTZ Cameras | 3 | No. | |
35 | 31 | Semi dome cameras for internal surveillance | 10 | No. | |
36 | 32 | LED TV for war room, cafeteria, reception | 3 | No. | |
37 | 33 | PSTN phones for each desk, meeting room, war room, cafeteria | 5 | No. | |
38 | 34 | 24 port Gigabit, Layer 3 Switch | 2 | No. | |
39 | 35 | PA system Dialling Consol with license | 2 | No. | |
40 | 36 | Diesel Generator (30 KVA) | 2 | No. | |
41 | 37 | UPS 30 KVA with 1 Hr SMF battery backup (1+1 Redundancy) | 2 | No. | |
42 | 38 | Printer for printing challans | 5 | No. | |
43 | 39 | Site Preparation Cost (50x 50 ft) | |||
44 | 39.1 | Furnitures & fixtures (tables,chairs,cublicle separator) | 1 | No. | |
45 | 39.2 | Carpeting including war room, meeting room etc. | 1 | No. | |
46 | 39.3 | Electrical lighting & fittings | 1 | No. | |
47 | 39.4 | Civil work (whitewash etc) | 1 | No. | |
48 | 39.5 | Access control | 1 | No. | |
49 | 39.6 | Fire detector & proofing | 1 | No. | |
50 | 39.7 | Air conditioning (2 Ton each) | 3 | No. | |
51 | 39.8 | Cloud and Infrastructure | |||
52 | 40 | Cloud requirement for complete solution including Servers, Firewall, Storage, Networking components and Infrastructure during implementation\n | 1 | Lot | |
53 | 40.1 | 1st Year O&M cost | 1 | Year | |
54 | 40.2 | 2nd Year O&M cost | 1 | Year | |
55 | 40.3 | 3rd Year O&M cost | 1 | Year | |
56 | 40.4 | 4th Year O&M cost | 1 | Year | |
57 | 40.5 | 5th Year O&M cost | 1 | Year | |
58 | 40.6 | Surveillance Software | |||
59 | 41 | Video Management Software | 1 | Base License | |
60 | 42 | Video Management Software | 360 | Per Camera Licence | |
61 | 43 | Facial Recoginition Software | 2 | Per camera License | |
62 | 43.1 | ITMS | |||
63 | 44 | TCCC Platform | 1 | License | |
64 | 45 | Video Analytics Software | 1 | Base License | |
65 | 46 | Video Analytics Software(with multiple analytics,as No helmet, Triple riding etc) | 275 | License | |
66 | 47 | ANPR, RLVD, analytics Base license | 1 | Base License | |
67 | 48 | ANPR per camera license | 693 | Per Camera Licence | |
68 | 49 | Red light violation software | 150 | Per Camera Licence | |
69 | 50 | eChallan software | 1 | License | |
70 | 51 | Variable message signboard software | 1 | License | |
71 | 52 | Public announcement system | 82 | License | |
72 | 53 | ATCC Software | 1 | License | |
73 | 54 | Environmnet Sensor Software | 1 | License | |
74 | 55 | Integration With RTO DB and other interfaces | 1 | Lot | |
75 | 55.1 | Other Software | |||
76 | 56 | Server Virtualization Software | 1 | License | |
77 | 57 | Server OS | 50 | License | |
78 | 58 | Anti-Virus & Theft protection | 1 | License | |
79 | 59 | Enterprise Management System(EMS/NMS) | 1 | Licence | |
80 | 60 | Data Base Software | 1 | License | |
81 | 60.1 | Network | |||
82 | 61 | Connectivity Charges 84 Junction over MPLS for 1 year\n | 5 | Years | |
83 | 62 | Connectivity Charges between DC (over Cloud) and TCCC (Primary and secondary) for 1 years | 5 | Years | |
84 | 62.1 | Manpower Services (Implementation Phase) | |||
85 | 63 | Project Director 01 Nos | 1 | No. | |
86 | 64 | Project Manager 01 No. for 06 Months | 6 | Months | |
87 | 65 | Cloud Solution Architect (IT,DC & C&C Infrastructure) 01 No. for 03 Months | 3 | Months | |
88 | 66 | Solution Architect (Network and CCTV surveillance system) 01 No. for 05 Months | 5 | Months | |
89 | 67 | Technical Lead Cum Trainer (IT and Surveillance industry) 01 No. for 06 Months | 6 | Months | |
90 | 68 | Site implementation/installation team consisting of 20 No. for 06 Months | 120 | Months | |
91 | 69 | System and NW Administrator 01 No. for 04 Months | 4 | Months | |
92 | 70 | Database Administrator 01 No. for 03 Months | 3 | Months | |
93 | 70.1 | O&M Phase | |||
94 | 71 | Project Manager | 60 | Months | |
95 | 72 | IT Administrator | 60 | Months | |
96 | 73 | Site Maintenance team of 3 members for 5 years | 60 | Months | |
97 | 74 | IT Helpdesk personal | 60 | Months | |
98 | 74.1 | Annual Maintenance Contract (AMC) for Existing HTMS System | |||
99 | 75 | Annual Maintenance charges for Existing HTMS system with all equipments, Hardware and software with deployment of technical mobile maintenance team. 24x7 patrolling vehicle and security guards. | 12 | Months | |
100 | 75.1 | Annual Maintenance Contract (AMC) for ITMS System including HTMS | |||
101 | 76 | AMC after completion of warrantty period of 1 year post Go-Live which includes comrehensive repair and maintenance of all equipment, hardware and software with deployment of technical mobile maintenance team, including insurance all all the hardware against thefy, accident, physical damage, force majure etc. | |||
102 | 76.1 | 2nd Year | 1 | Year | |
103 | 76.2 | 3rd Year | 1 | Year | |
104 | 76.3 | 4th Year | 1 | Year | |
105 | 76.4 | 5th Year | 1 | Year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail