110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Power From Chathankottunada Stage Ii Shep Construction Of Foundation For Yard Equipments And Cable Trench 110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Po, 110kV Sub Station Kuttiadi-Kerala

Kerala State Electricity Board-KSEB has published 110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Power From Chathankottunada Stage Ii Shep Construction Of Foundation For Yard Equipments And Cable Trench 110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Po. Submission Date for this Tender is 21-07-2020. Substation Tenders in 110kV Sub Station Kuttiadi Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24777006
110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Power From Chathankottunada Stage Ii Shep Construction Of Foundation For Yard Equipments And Cable Trench 110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Po
Open Tender
Indian
Kerala
110kV Sub Station Kuttiadi
21-07-2020

Tender Details

110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Power From Chathankottunada Stage Ii Shep Construction Of Foundation For Yard Equipments And Cable Trench 110Kv Substation Kuttiadi Construction Of Additional Bays For Evacuating Power From Chathankottunada Stage Ii Shep Construction Of Foundation For Yard Equipments And Cable Trench .

Key Value

Document Fees
INR 5900 /-
EMD
INR 38500.0 /-
Tender Value
INR 13.04 Lakhs /-

BOQ Items

Name of Work:110KV Substation Kuttiadi- Construction of additional bays for evacuating power from Chathankottunada Stage II SHEP – Construction of foundation for yard equipments and cable trench.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. in All kinds of soil. BI01010001010000000000000515BI0100001112 105 M3
2 2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. BI01010001010000000000000515BI0100001113 56 M3
3 3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) BI01010001010000000000000515BI0100001114 20 M2
4 4 Centering and shuttering including strutting,propping etc. and removal of form for foundations,footing and base of columns BI01010001010000000000000515BI0100001115 220 M2
5 5 Centering and shuttering including strutting,propping etc. and removal of form for walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. for walls of cable trench BI01010001010000000000000515BI0100001116 235 M2
6 6 Centering and shuttering including strutting,propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platforms for cover slabs of cable trenches. BI01010001010000000000000515BI0100001117 20 kg
7 7 Steel reinforcement for RCC work including straightening,cutting, bending,placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars BI01010001010000000000000515BI0100001118 3400 m3
8 8 Providing and laying in position specified grade of Reinforced Cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work upto plinth level. 1:1.5:3(1cement:1.5coarse sand:3graded stone aggregate 20mm nominal size) BI01010001010000000000000515BI0100001119 64 kg
9 9 Structural steel work in single section,fixed with or without connecting plate,including cutting,hoisting,fixing in position all complete using departmentally supplied angles across cable trench for carrying cables. BI01010001010000000000000515BI0100001120 340 m3
10 10 Providing and laying in position specified grade of Reinforced Cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work upto plinth level. 1:2:4 (1cement:2coarse sand:4graded stone aggregate 20mm nominal size) BI01010001010000000000000515BI0100001121 4 set
11 11 Fixing foundation stub or bolts in lines and levels as required as per the direction of departmental officers at site BI01010001010000000000000515BI0100001122 60 m
12 12 Providing and fixing PVC pipes including jointing of pipes with one step PVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer-in-charge. 110mm dia 4kgf/cm2. BI01010001010000000000000515BI0100001123 100 m2
13 13 Plastering using 9mm cement of mix 1:3(1cement,3 fine cement) including all cost of materials, labour charges etc. complete BI01010001010000000000000515BI0100001124 250 m3
14 14 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.50m. BI01010001010000000000000515BI0100001125 62 m3
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail