Repair/Maintenance/Improvement Of Irrigation System Of Various Khuls Sundrai Thagi Khul , Dhanu Seri Khul , Wss Sundrani Khul , Bakal Hartyan Khul , Parva Salay Khul , Samble Sui Khul , Mathan Khul , Mananu Khul , Krimchi Khul , Mansar Khul , An, udhampur-Jammu And Kashmir

Irrigation And Flood Control Department-IFCD has published Repair/Maintenance/Improvement Of Irrigation System Of Various Khuls Sundrai Thagi Khul , Dhanu Seri Khul , Wss Sundrani Khul , Bakal Hartyan Khul , Parva Salay Khul , Samble Sui Khul , Mathan Khul , Mananu Khul , Krimchi Khul , Mansar Khul , An. Submission Date for this Tender is 15-07-2020. Irrigation System Tenders in udhampur Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

24776952
Repair/Maintenance/Improvement Of Irrigation System Of Various Khuls Sundrai Thagi Khul , Dhanu Seri Khul , Wss Sundrani Khul , Bakal Hartyan Khul , Parva Salay Khul , Samble Sui Khul , Mathan Khul , Mananu Khul , Krimchi Khul , Mansar Khul , An
Open Tender
Indian
Jammu And Kashmir
udhampur
15-07-2020

Tender Details

Repair / Maintenance / Improvement Of Irrigation System Of Various Khuls Sundrai Thagi Khul , Dhanu Seri Khul , Wss Sundrani Khul , Bakal Hartyan Khul , Parva Salay Khul , Samble Sui Khul , Mathan Khul , Mananu Khul , Krimchi Khul , Mansar Khul , And Jib Padanu Kh

Key Value

Document Fees
INR 1000 /-
EMD
INR 10000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Repair/ Maintenance / Restoration of Irrigation system of various khuls in Irrigation Sub Division Thathi : Sundrani Thagi Khul, Dhanu Seri Khul, WSS Sundrani Khul, Bakal Hartyan Khul, Parva "Salay Khul, Samble sui Khul, Mathan Khul, Mananu Khul, Krimchi Khul, Mansar Khul, and Jib Padanu Khul for the year 2020-21
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Construction of Muthuy Bund Compressing of 50% boulders & 50% wood bushes including working in wet conditions BI01010001010000000000000515BI0100001114 1 Cum
2 2 Dismantling old protection wor including cutting of crates and stacking of serviceable material for reuse BI01010001010000000000000515BI0100001115 1 Cum
3 3 Hand Packing of stones in Knitted crates, excluding cost of crates and stones BI01010001010000000000000515BI0100001116 1 Cum
4 4 Provision for supply & binding of BA wire required for restoration of damaged wire crates (Rate to be Quoted by the contractor) BI01010001010000000000000515BI0100001117 1 KG (Rate to be Quoted by the contractor)
5 5 Slip clearance in soils, mixed with moorum/ Kankar/ shingle/ Boulders, disposal bead upto 50m and lift 1.5 m BI01010001010000000000000515BI0100001118 1 Cum
6 6 Silt clearance from canals inclusive of initial lead 50 mtr and 1.5 mtr respectively BI01010001010000000000000515BI0100001119
7 6.1 Dry BI01010001010000000000000515BI0100001120 1 Cum
8 6.2 Wet BI01010001010000000000000515BI0100001121 1 Cum
9 7 Carriage of disposal of silt by HL BI01010001010000000000000515BI0100001122
10 7.1 AV 50 mtr by Hl BI01010001010000000000000515BI0100001123 1 Cum
11 7.2 AV100 mtr by HL BI01010001010000000000000515BI0100001124 1 Cum
12 7.3 AV 200 mtr by HL BI01010001010000000000000515BI0100001125 1 Cum
13 7.4 AV 300 mtr by HL BI01010001010000000000000515BI0100001126 1 Cum
14 8 Cutting rough excavation, banking excavation earth in layers includign watering, ramming on banks / berms of canal BI01010001010000000000000515BI0100001127 1 Cum
15 9 Clearaning Jungle including uprooting rank, vegetation, grass, brush wood, Trees & sapling of girth upto 30cm measured at a height of 1 mtr above ground level and removal of rubbish upto a distance of 50 mtr outside the periphery of the area cleared. BI01010001010000000000000515BI0100001128 1 Sqm
16 10 Demolishign cement concrete manually/ By mechanical means including disposal of material with 50 mtgr lead BI01010001010000000000000515BI0100001129
17 10.1 1:3:6 or richer mix BI01010001010000000000000515BI0100001130 1 Cum
18 10.2 1:4:8 or Leaner mix BI01010001010000000000000515BI0100001131 1 Cum
19 11 Dismantling concrete grouted stone pitching in aprons, drains etc including stacking of serviceable material and disposal of unserviceable material, stacking/ disposal lead upto 100 mtr BI01010001010000000000000515BI0100001132 1 Cum
20 12 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering along work upto plinth level 1:4:8 (1 cement : 4 fine sand: 8 graded stone aggregate 40 mm nominal size) Crushed BI01010001010000000000000515BI0100001133 1 Cum
21 13 Cement concrete flooring 1:2:4 (1 cement 2 coarsse sand 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement includign cemetn slurry but excluding the cost of nosing steps etc. complete 40 mm thick with 20 mm nominal size stone aggregate BI01010001010000000000000515BI0100001134
22 13.1 Crushed BI01010001010000000000000515BI0100001135 1 Sqm
23 13.2 Nallah BI01010001010000000000000515BI0100001136 1 Sqm
24 14 Dry stone pitching (any thickness) including cost of stones. BI01010001010000000000000515BI0100001137
25 14.1 Horizontal BI01010001010000000000000515BI0100001138 1 Cum
26 14.2 On Slopes BI01010001010000000000000515BI0100001139 1 Cum
27 15 Grouting of stone pitching using M-10 nominal mix concrete (Max size of aggregates 20 mm nominal @ 6.00 cum per 100 Sq mtr on horizontal / side slopes complete including curing BI01010001010000000000000515BI0100001140
28 15.1 Crushed BI01010001010000000000000515BI0100001141 1 Cum
29 15.2 Nallah BI01010001010000000000000515BI0100001142 1 Cum
30 16 Grouting of stone pitching using M-10 nominal mix concrete (Max size of aggregates 20 mm nominal @ 3.65 cum per 100 Sq mtr on horizontal / side slopes complete including curing BI01010001010000000000000515BI0100001143
31 16.1 Crushed BI01010001010000000000000515BI0100001144 1 Cum
32 16.2 Nallah BI01010001010000000000000515BI0100001145 1 Cum
33 17 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering along work upto plinth level 1:3: 6 (1 cement : 3 fine sand: 6 graded stone aggregate 20 mm nominal size) Crushed BI01010001010000000000000515BI0100001146 1 Cum
34 18 Providing and laying in position speficied grade of reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement All work upto plinth level (1:2:4) 1 cement 2 coarse sand 4 graded stone aggregate 20 mm nominal size) BI01010001010000000000000515BI0100001147 1 Cum
35 19 Reinforcement for RCC work including straighteining, cutting, bending, placing in position and binding all complete BI01010001010000000000000515BI0100001148 1 KG
36 20 Centering and shutterin including strutting propping etc and removal of form work for BI01010001010000000000000515BI0100001149
37 20.1 Foundation , footing, bases of columns BI01010001010000000000000515BI0100001150 1 Sqm
38 20.2 Retaining walls, return walls, walls (any thickness) incluidng attached pilasters, buttresses, plinth and string courses, fillets etc BI01010001010000000000000515BI0100001151 1 Sqm
39 20.3 Suspended floors, roofs, landings, balconies and acces platform BI01010001010000000000000515BI0100001152 1 Sqm
40 20.4 Edges of slabs and breaks in floors and walls under 20 cm wide BI01010001010000000000000515BI0100001153 1 RM
41 21 Cost of knitted crates of size 6.00x1.50x1.50 mtr BI01010001010000000000000515BI0100001154 1 Each
42 22 Filling empty cement bags with sand/ earth including cost of seqing and strings excluding cost of bags and earth / sand BI01010001010000000000000515BI0100001155 1 Each
43 23 Uploaded sand/ earth filled bags from boats BI01010001010000000000000515BI0100001156
44 23.1 Placing in Dry BI01010001010000000000000515BI0100001157 1 Each
45 23.2 Placing of Water BI01010001010000000000000515BI0100001158 1 Each
46 24 Supply of EC Bags BI01010001010000000000000515BI0100001159 1 Each
47 25 Dumping stones excluding cost of stones in horizontal on level BI01010001010000000000000515BI0100001160 1 Cum
48 26 Supply of Sand BI01010001010000000000000515BI0100001161 1 Cum
49 27 Earthwork in excavation by manual means over areas (exceeding 30 cm and upto 1.5 m in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavbated earth up to 1 m from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soil BI01010001010000000000000515BI0100001162 1 Cum
50 28 Extra for carriage of sand/ earth filled with E/C Bags BI01010001010000000000000515BI0100001163
51 28.1 AV 200 mtr by HL BI01010001010000000000000515BI0100001164 1 Cum
52 28.2 AV 300 mtr by HL BI01010001010000000000000515BI0100001165 1 Cum
53 29 Deployment of extra labour for restoration work (wherever required) BI01010001010000000000000515BI0100001166
54 29.1 Mazdoor BI01010001010000000000000515BI0100001167 1 Per Day
55 29.2 Fitter BI01010001010000000000000515BI0100001168 1 Per Day
56 30 Carriage of stones by head load from local nallah to site of work (extra carriage shall be paid only after verification by the concerned site engineer) AEE BI01010001010000000000000515BI0100001169
57 30.1 1st 50 mtr BI01010001010000000000000515BI0100001170 1 Cum
58 30.2 Next 50 mtr BI01010001010000000000000515BI0100001171 1 Cum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail