Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Work Work Of Patrolling And Fixing Of Tower Parts , Maintenance Work , Attending Emergency Breakdown And Other Associated Works At 132 Kv Substation R . S . Ghat Budhwal Tss Transmission Line Under Etd Iii Lucknow. Submission Date for this Tender is 25-08-2020. Transmission Line Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-Aug-2020 | exten | Date | 25-08-2020 |
Name of Work : WORK OF PATROLLING AND FIXING OF TOWER PARTS, MAINTENANCE WORK, ATTENDING EMERGENCY BREAKDWON AND OTHER ASSOCIATED WORKS AT 132 KV R. S. GHAT - BUDHWAL TSS TRANSMISSION LINE UNDER ETD-III, LUCKNOW | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Following Works are to be carried out on 132 KV S.C R.S. Ghat - Budhwal TSS Transmission Line under the Charge of ETD-III, Lucknow with all cost of men, misc. consumables and T&P etc. required for the job, as per direction of the concerned S.D.O./J.E. | |||
2 | 2 | 1a) Tower to tower petrolling (Bi-monthly i.e. 6 times in a year) of following 132 KV Transmission Line from one end to other end and submission of patrolling report within 7 days after completion of each patrolling in triplicate in prescribed proforma mentioning stolen/missing Tower parts and Tower accessories such as missing danger/phase/number plate, trees/tree branches and bamboo Kothi felling in a line corridor, damage to Earth Wire, Conductor, Jumpers, Insulator & other line accessories damage to Foundation, Coping, Chimney, Earthing at etc. with the help of patrolling team. | |||
3 | 3 | i) 132 KV R. S. Ghat - Budhwal TSS Transmission Line | 253.38 | Km. | |
4 | 4 | 1b) Emergency patrolling of all the above 132 KV transmission line by experience person in case of any tripping breakdown of line the emergency patrolling includes checking of Tower, conductors, earthwire, insulator, clamp, fitting etc. to locate the defect fault deficiency the emergency patrolling has to be start within 6 hours after receiving the call of SDO / JE | |||
5 | 5 | i) Upto 20 Km. | 4 | Job | |
6 | 6 | ii) Above 20 Kms to 50 Kms | 2 | Job | |
7 | 7 | 2a) Lopping/Chopping of various species of tree branches falling under the corridor with all due care of safety and precautions to avoid any damages in nearby building, crop & power/telephone line passing near vicinity of the trees all the above lines along with throwing up cut branches at least 50 Mtr. away from line corridor as per details below: | |||
8 | 8 | i) 132 KV R. S. Ghat - Budhwal TSS Transmission Line | 3200 | No. | |
9 | 9 | 2b) Cutting of bamboo bushes falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power / telephone lines passing near vicinity of the trees all the above lines along with throwing of cut branches at least 50 meter away from the line corridor as per details below: | |||
10 | 10 | i) 132 KV R. S. Ghat - Budhwal TSS Transmission Line | 4 | No. | |
11 | 11 | 2c) Lopping/Choppig of Spiniferous Babool tree / branches falling inside the corridor with all due care of safety and precaution for all the following lines along with throwing of cut branches at least 50 Mtr. away from the line corridor as per details below: | |||
12 | 12 | i) 132 KV R. S. Ghat - Budhwal TSS Transmission Line | 250 | No. | |
13 | 13 | 3) Replacement of missing Tower parts along with fabrication work and fixing with tower after shifting of Tower parts, nuts & bolts from UPPTCL store to work site in the above mentioned line. | 150 | No. | |
14 | 14 | 4) Checking and tightening of jumpers of tension Tower including replacement of damaged jumpers fastners if needed and including carriage of material from store to site of work. For 132 KV R.S. Ghat - Budhwal TSS transmission line under ETD-III, Lucknow. | 10 | No. | |
15 | 15 | 5) Refixing and tightening of dislocated shifted vibration damper to its place including replacement of fastner if required in the above transmission line | |||
16 | 16 | i) 132 KV R. S. Ghat - Budhwal TSS Transmission Line | 50 | No | |
17 | 17 | 6) Attending Breakdown due to failure of Disc Insulator and replacement of Tension / Suspension string along with mobilization of skilled gang including carriage of material from store to site and site to store for completion of work. | |||
18 | 18 | i) Tension String (120 KN Disc Insulator) | 3 | Job | |
19 | 19 | ii) Suspension String (70 KN Disc Insulator) | 3 | Job | |
20 | 20 | iii) Jumper replacement | 6 | Job | |
21 | 21 | 7) Replacement of damaged ACSR Panther conductor of 132 KV TSS Transmission Line at Various Locations by use of M.S.C. Joints/Single Tension Fittings etc. as per Requirment, including Jumpering work. | 1 | Job | |
22 | 22 | 8) Repairing of damaged Strands of ACSR Panther conductor of 132 KV TSS Transmission Line at Various Locations by use of Repair Sleeves etc. as per Requirment . | 2 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy