Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Work Of Construction Of 01 No 132 Kv And 33 Kv Bays For Increasing Capacity From 2X63 To 2X63plus40 Mva At 132 Kv Sub Station Saidnagli Under Etd Amroha. Submission Date for this Tender is 25-07-2020. Electrification Work Tenders in AMROHA Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: WORK OF CONSTRUCTION OF 01 NO. 132 KV & 33 KV BAYS FOR INCREASING CAPACITY FROM 2X63 TO 2X63+40 MVA AT 132 KV SUB STATION, SAIDNAGLI UNDER ETD-AMROHA. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | WORK OF CONSTRUCTION OF 01 NO. 132 KV & 33 KV BAYS FOR INCREASING CAPACITY FROM 2X63 TO 2X63+40 MVA AT 132 KV SUB STATION, SAIDNAGLI UNDER ETD-AMROHA. | |||
2 | 1.01 | A Work Erection of following equipments/structure as per instruction manual of various equipments and technical specification including shifting of material/equipments from store to erection site including all other associated work to complete the job satisfactorily. i Main & Auxiliary Structure | 3 | MT | |
3 | 1.02 | ii 145 KV SF-6 Circuit Breaker | 1 | No | |
4 | 1.03 | iii 145 KV CT | 3 | Nos | |
5 | 1.04 | iv 145 KV BI with its operating mechanism. | 1 | No | |
6 | 1.05 | v 120 KV LA with surge counter. | 3 | Nos | |
7 | 1.06 | vi 132/33 KV C & R Panel | 1 | No | |
8 | 1.07 | vii 145 KV Post Insulator | 5 | Nos | |
9 | 1.08 | viii 36 KV VCB | 1 | No | |
10 | 1.09 | ix 36 KV CT | 3 | Nos | |
11 | 1.1 | x 30 KV LA | 3 | Nos | |
12 | 1.11 | xi 36 KV Bus Isolator | 1 | No | |
13 | 1.12 | xii 36 KV Post Insulator | 6 | Nos | |
14 | 2.01 | Complete Interconnection of 132 and 33 KV T/F bay with ACSR Panther Conductor consisting of all the 132/33 KV T/F bay equipments & bus bar including cutting, bending of associated works. | 1 | Job | |
15 | 3.01 | Cutting, strengthening, bending, laying 800 mm. below in ground and above ground of following size of MS Flat for earthing of main and auxiliary structure, equipment structure etc. including welding with main earth mat and with object to be earthed/excavation of trenches its back filling. i 75x10mm | 70 | RMT | |
16 | 3.02 | ii 50x6mm | 170 | RMT | |
17 | 4.01 | Painting of MS Flat i 75x10mm | 40 | RMT | |
18 | 4.02 | ii 50x6mm | 120 | RMT | |
19 | 5.01 | Preparing of cable schedule of 132 KV & 33 KV Bays | 1 | Job | |
20 | 6.01 | Laying of following size of control cable: i 2Cx2.5 Sq.mm | 1 | Km | |
21 | 6.02 | ii 4Cx2.5 Sq.mm | 1 | Km | |
22 | 6.03 | iii 6Cx2.5 Sq.mm | 0.5 | Km | |
23 | 7.01 | Termination of cable as per cable schedule including making necessary holes in glands places or box where ever required supply and fixing of cable glands of appropriate size, supply & fixing ferrules & Nos. for each core of cable and its termination with crimping type lugs of dowell/tension make and all other associated work to complete the job satisfactory. | 300 | Nos | |
24 | 8.01 | Preparation of Delta Earthing of HV and LV side LA’s with 06 Nos of electrodes | 2 | Job | |
25 | 9.01 | Supply B Supply of 4 bolted type PG Clamp Zebra to Panther Conductor | 15 | Nos | |
26 | 10.01 | Supply of 4 bolted type PG Clamp Moose to Panther Conductor | 12 | Nos | |
27 | 11.01 | Supply of 3 bolted type PG Clamp Panther to Panther Conductor | 30 | Nos | |
28 | 12.01 | Supply of bimetallic 40 MVA T/F 132 KV HV Side Bushing clamp made of Aluminum Alloy for Twin Panther Conductor with HDG with Nuts, bolts & washer. | 6 | Nos | |
29 | 13.01 | Supply of bimetallic 40 MVA T/F 33 KV LV Side Bushing clamp made of Aluminum Alloy for Twin Panther Conductor with HDG with Nuts, bolts & washer. | 6 | Nos | |
30 | 14.01 | Post Insulator Clamp for Single Panther conductor | 12 | Nos |