Rural Development Department has published Cc Road Belwandi Gaothan , Baradgaon Dagdi And Other Villages , Metalling Road At Wadgaon Tanpura Nandgaon Road To Tanpurewasti , Constructing Under Ground Gutter At Durgaon Gaothan In Taluka Karjat Dist . Ahmednagar. Submission Date for this Tender is 25-07-2020. Road Work Tenders in AHMEDNAGAR Maharashtra. Bidders can get complete Tender details and download the document.
Name of Works:- A) Constructing Concrete Road @ Belwandi Gaothan Internal Tal Karjat ; ..............B)Constructing Concrete Road @ Baradgaon Dagadi Yeswadi Internal Tal Karjat ; ..............C) Constructing Concrete Road @ Baradgaon Sudrik Internal Tal Karjat ..............D) Metalling Road @ Wadgaon Tanpura Nandgaon Road to Tanpurewasti Tal Karjat Dist - Ahmednagar ;..............E)Constructing Concrete Road @ Talwadi Internal Tal Karjat............F) Constructing Concrete Road @ Shinde Vitthal Rukmini Mandir to Rajwada Tal Karjat; .............G) Constructing Concrete Road @ Kopardi Gaothan Internal Road Tal Karjat; .............. H) Constructing Concrete Road @ Bitkewadi Internal Tal Karjat ...............I) Constructing Concrete Road @ Walwad VP Office to Sunil JagtapTal Karjat;................. J) Constructing Concrete Road @ Rehekuri Vijubai Awachar to ZP School Tal Karjat; .............. K) Constructing Concrete Road @ Rehekuri Water Tank to Kumbhargalli Tal Karjat............L) Constructing Under ground Gutter at Durgaon Gaothan Tal: Karjat ; ..............M) Constructing Concrete Road @ Durgaon Gaothan Tal Karjat; ............N)Constructing Under ground Gutter at Jalalpur VP Office to Bus Stop Tal: Karjat ..................... O) Constructing Concrete Road @.Jalalpur Kasarewasti to Hakewasti Tal Karjat | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge.....( Qty For Work A) | 534.6 | Square Metre | |
2 | 2 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.\n.....( Qty For Work A) | 106.92 | Cubic Metre | |
3 | 3 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete......( Qty For Work A) | 158.43 | Cubic Metre | |
4 | 4 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ......( Qty For Work A) | 106.92 | Cubic Metre | |
5 | 5 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.....( Qty For Work A) | 158.43 | Cubic Metre | |
6 | 6 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. .....( Qty For Work A)\n | 534.6 | Square Metre | |
7 | 7 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) .....( Qty For Work A) | 48.6 | Cubic Metre | |
8 | 8 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete......( Qty For Work A) | 486 | Square Metre | |
9 | 9 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge .....( Qty For Work A) | 1 | Number | |
10 | 10 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes)......( Qty For Work A) | 1 | Number | |
11 | 11 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value......( Qty For Work A) | 1 | Number | |
12 | 12 | Fine aggregates Silt Factor......( Qty For Work A) | 1 | Number | |
13 | 13 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge......( Qty For Work B) | 534.6 | Square Metre | |
14 | 14 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.......( Qty For Work B)\n | 106.92 | Cubic Metre | |
15 | 15 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.......( Qty For Work B) | 158.43 | Cubic Metre | |
16 | 16 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .......( Qty For Work B) | 106.92 | Cubic Metre | |
17 | 17 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete......( Qty For Work B) | 158.43 | Cubic Metre | |
18 | 18 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ......( Qty For Work B)\n | 534.6 | Square Metre | |
19 | 19 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ......( Qty For Work B) | 48.6 | Cubic Metre | |
20 | 20 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete.......( Qty For Work B) | 486 | Square Metre | |
21 | 21 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ......( Qty For Work B) | 1 | Number | |
22 | 22 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes).......( Qty For Work B) | 1 | Number | |
23 | 23 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value.......( Qty For Work B) | 1 | Number | |
24 | 24 | Fine aggregates Silt Factor.......( Qty For Work B) | 1 | Number | |
25 | 25 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge......( Qty For Work C) | 534.6 | Square Metre | |
26 | 26 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.......( Qty For Work C)\n | 106.92 | Cubic Metre | |
27 | 27 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.......( Qty For Work C) | 158.43 | Cubic Metre | |
28 | 28 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .......( Qty For Work C) | 106.92 | Cubic Metre | |
29 | 29 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete......( Qty For Work C) | 158.43 | Cubic Metre | |
30 | 30 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ......( Qty For Work C)\n | 534.6 | Square Metre | |
31 | 31 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ......( Qty For Work C) | 48.6 | Cubic Metre | |
32 | 32 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete.......( Qty For Work C) | 486 | Square Metre | |
33 | 33 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ......( Qty For Work C) | 1 | Number | |
34 | 34 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes).......( Qty For Work C) | 1 | Number | |
35 | 35 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value.......( Qty For Work C) | 1 | Number | |
36 | 36 | Fine aggregates Silt Factor.......( Qty For Work C) | 1 | Number | |
37 | 37 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete.( Qty For Work D) | 2958.7 | Sqm | |
38 | 38 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. .( Qty For Work D) | 162 | Cum | |
39 | 39 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by lasting.(Hand broken). with prior approval of concerned Superitending Engineer.( Qty For Work D) | 594 | Cum | |
40 | 40 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.( Qty For Work D) | 565.2 | Cum | |
41 | 41 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ..( Qty For Work D) | 594 | Sqm | |
42 | 42 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.( Qty For Work D) | 565.2 | Cum | |
43 | 43 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.( Qty For Work D) | 2970 | Sqm | |
44 | 44 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete..( Qty For Work D) | 22.5 | Sqm | |
45 | 45 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete..( Qty For Work D) | 7.5 | Sqm | |
46 | 46 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge .( Qty For Work D) | 1 | No | |
47 | 47 | Testing charges of Metal 60mm/40mm - Crushing Value/impact value , Water Absorption & Specific Gravity,.( Qty For Work D) | 1 | Test | |
48 | 48 | Testing charges of Metal 60mm/40mm - Sieve Analysis.( Qty For Work D) | 1 | Test | |
49 | 49 | Testing charges of Hard Murum - Liquid limit & plastic Limit..( Qty For Work D) | 1 | Test | |
50 | 74 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge.r...( Qty For WorkF) | 534.6 | Square Metre | |
51 | 75 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.r...( Qty For Work F)\n | 106.92 | Cubic Metre | |
52 | 76 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete....( Qty For Work F) | 158.43 | Cubic Metre | |
53 | 77 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ....( Qty For Work F) | 106.92 | Cubic Metre | |
54 | 78 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete...( Qty For Work F) | 158.43 | Cubic Metre | |
55 | 79 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ...( Qty For Work F)\n | 534.6 | Square Metre | |
56 | 80 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ...( Qty For Work F) | 48.6 | Cubic Metre | |
57 | 81 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete....( Qty For Work F) | 486 | Square Metre | |
58 | 82 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ...( Qty For Work F) | 1 | Number | |
59 | 83 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes)....( Qty For Work F) | 1 | Number | |
60 | 84 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value....( Qty For Work F) | 1 | Number | |
61 | 85 | Fine aggregates Silt Factor....( Qty For Work F) | 1 | Number | |
62 | 86 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge.( Qty For Work G ) | 534.6 | Square Metre | |
63 | 87 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.( Qty For Work G )\n | 106.92 | Cubic Metre | |
64 | 88 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.( Qty For Work G ) | 158.43 | Cubic Metre | |
65 | 89 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .( Qty For Work G ) | 106.92 | Cubic Metre | |
66 | 90 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete ( Qty For Work G ) | 158.43 | Cubic Metre | |
67 | 91 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ( Qty For Work G )\n | 534.6 | Square Metre | |
68 | 92 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ( Qty For Work G ) | 48.6 | Cubic Metre | |
69 | 93 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( Qty For Work G ) | 486 | Square Metre | |
70 | 94 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ( Qty For Work G ) | 1 | Number | |
71 | 95 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes). ( Qty For Work G ) | 1 | Number | |
72 | 96 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value.( Qty For Work G ) | 1 | Number | |
73 | 97 | Fine aggregates Silt Factor.( Qty For Work G ) | 1 | Number | |
74 | 98 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge. ( Qty For Work H ) | 534.6 | Square Metre | |
75 | 99 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer. ( Qty For Work H )\n | 106.92 | Cubic Metre | |
76 | 100 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. ( Qty For Work H ) | 158.43 | Cubic Metre | |
77 | 101 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . ( Qty For Work H ) | 106.92 | Cubic Metre | |
78 | 102 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete ( Qty For Work H ) | 158.43 | Cubic Metre | |
79 | 103 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ( Qty For Work H )\n | 534.6 | Square Metre | |
80 | 104 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ( Qty For Work H ) | 48.6 | Cubic Metre | |
81 | 105 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( Qty For Work H ) | 486 | Square Metre | |
82 | 106 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ( Qty For Work H ) | 1 | Number | |
83 | 107 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes). ( Qty For Work H ) | 1 | Number | |
84 | 108 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value. ( Qty For Work H ) | 1 | Number | |
85 | 109 | Fine aggregates Silt Factor. ( Qty For Work H ) | 1 | Number | |
86 | 110 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge..( Qty For Work I) | 534.6 | Square Metre | |
87 | 111 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.\n.( Qty For Work I) | 106.92 | Cubic Metre | |
88 | 112 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete..( Qty For Work I) | 158.43 | Cubic Metre | |
89 | 113 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ..( Qty For Work I) | 106.92 | Cubic Metre | |
90 | 114 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.( Qty For Work I) | 158.43 | Cubic Metre | |
91 | 115 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. \n.( Qty For Work I) | 534.6 | Square Metre | |
92 | 116 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) .( Qty For Work I) | 48.6 | Cubic Metre | |
93 | 117 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete..( Qty For Work I) | 486 | Square Metre | |
94 | 118 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge .( Qty For Work I) | 1 | Number | |
95 | 119 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes)..( Qty For Work I) | 1 | Number | |
96 | 120 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value..( Qty For Work I) | 1 | Number | |
97 | 121 | Fine aggregates Silt Factor..( Qty For Work I) | 1 | Number | |
98 | 122 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge.( Qty For Work J ) | 534.6 | Square Metre | |
99 | 123 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.( Qty For Work J )\n | 106.92 | Cubic Metre | |
100 | 124 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.( Qty For Work J ) | 158.43 | Cubic Metre | |
101 | 125 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .( Qty For Work J ) | 106.92 | Cubic Metre | |
102 | 126 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete ( Qty For Work J ) | 158.43 | Cubic Metre | |
103 | 127 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ( Qty For Work J )\n | 534.6 | Square Metre | |
104 | 128 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ( Qty For Work J ) | 48.6 | Cubic Metre | |
105 | 129 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( Qty For Work J ) | 486 | Square Metre | |
106 | 130 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ( Qty For Work J ) | 1 | Number | |
107 | 131 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes). ( Qty For Work J ) | 1 | Number | |
108 | 132 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value.( Qty For Work J ) | 1 | Number | |
109 | 133 | Fine aggregates Silt Factor.( Qty For Work J ) | 1 | Number | |
110 | 134 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge. ( Qty For Work K ) | 534.6 | Square Metre | |
111 | 135 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer. ( Qty For Work K )\n | 106.92 | Cubic Metre | |
112 | 136 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. ( Qty For Work K ) | 158.43 | Cubic Metre | |
113 | 137 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . ( Qty For Work K ) | 106.92 | Cubic Metre | |
114 | 138 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete ( Qty For Work K ) | 158.43 | Cubic Metre | |
115 | 139 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. ( Qty For Work K )\n | 534.6 | Square Metre | |
116 | 140 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) ( Qty For Work K ) | 48.6 | Cubic Metre | |
117 | 141 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( Qty For Work K ) | 486 | Square Metre | |
118 | 142 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge ( Qty For Work K ) | 1 | Number | |
119 | 143 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes). ( Qty For Work K ) | 1 | Number | |
120 | 144 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value. ( Qty For Work K ) | 1 | Number | |
121 | 145 | Fine aggregates Silt Factor. ( Qty For Work K ) | 1 | Number | |
122 | 146 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge..( Qty For Work L) | 534.6 | Square Metre | |
123 | 147 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer.\n.( Qty For Work L) | 106.92 | Cubic Metre | |
124 | 148 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete..( Qty For Work L) | 158.43 | Cubic Metre | |
125 | 149 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ..( Qty For Work L) | 106.92 | Cubic Metre | |
126 | 150 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.( Qty For Work L) | 158.43 | Cubic Metre | |
127 | 151 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. \n.( Qty For Work L) | 534.6 | Square Metre | |
128 | 152 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) .( Qty For Work L) | 48.6 | Cubic Metre | |
129 | 153 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete..( Qty For Work L) | 486 | Square Metre | |
130 | 154 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge .( Qty For Work L) | 1 | Number | |
131 | 155 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes)..( Qty For Work L) | 1 | Number | |
132 | 156 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value..( Qty For Work L) | 1 | Number | |
133 | 157 | Fine aggregates Silt Factor..( Qty For Work L) | 1 | Number | |
134 | 158 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. .( Qty For Work M)) | 51.435 | Cum | |
135 | 159 | Excavation for foundation in Hard murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. .( Qty For Work M)) | 17.145 | Cum | |
136 | 160 | Providing and laying cement concrete pipe of I.S. N.P.2 Class of 230 mm Dia in proper line, level & slope including providing, fixing collars or spigot and socket joint by rubber ring and in cement mortar 1:2 etc. complete. Spec.No. : CD.7 Page.No. 162.( Qty For Work M) | 14 | RM | |
137 | 161 | Providing and laying cement concrete pipe of I.S. N.P.2 Class of 300 mm Dia in proper line, level & slope including providing, fixing collars or spigot and socket joint by rubber ring and in cement mortar 1:2 etc. complete. Spec.No. : CD.7 Page.No. 162.( Qty For Work M) | 180 | RM | |
138 | 162 | Providing and laying cement concrete pipe of I.S. N.P.2 Class of 450 mm Dia in proper line, level & slope including providing, fixing collars or spigot and socket joint by rubber ring and in cement mortar 1:2 etc. complete. Spec.No. : CD.7 Page.No. 162.( Qty For Work M) | 300 | RM | |
139 | 163 | Providing, laying and fixing P.V.C. pipe of 75mm dia. with fittings such as bends, tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete..( Qty For Work M) | 28.5 | RM | |
140 | 164 | Filling in plinth and floors with approved excavated materials in 15 cm to 20 cm layers including watering and compaction complete..( Qty For Work M) | 48.12 | Cum | |
141 | 165 | Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140 kg with frame etc complete..( Qty For Work M) | 19 | No | |
142 | 166 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge... .( Qty For Work N) | 534.6 | Square Metre | |
143 | 167 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer... .( Qty For Work N)\n | 106.92 | Cubic Metre | |
144 | 168 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete... .( Qty For Work N) | 158.43 | Cubic Metre | |
145 | 169 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ... .( Qty For Work N) | 106.92 | Cubic Metre | |
146 | 170 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.. .( Qty For Work N) | 158.43 | Cubic Metre | |
147 | 171 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. .. .( Qty For Work N)\n | 534.6 | Square Metre | |
148 | 172 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) .. .( Qty For Work N) | 48.6 | Cubic Metre | |
149 | 173 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete... .( Qty For Work N) | 486 | Square Metre | |
150 | 174 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge.. .( Qty For Work N) | 1 | Number | |
151 | 175 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes)... .( Qty For Work N) | 1 | Number | |
152 | 176 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value... .( Qty For Work N) | 1 | Number | |
153 | 177 | Fine aggregates Silt Factor.. .( Qty For Work N) | 1 | Number | |
154 | 202 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. ......( Qty For Work P) | 15.525 | Cum | |
155 | 203 | Excavation for foundation in Hard murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. ......( Qty For Work P) | 5.175 | Cum | |
156 | 204 | Providing and laying cement concrete pipe of I.S. N.P.2 Class of 230 mm Dia in proper line, level & slope including providing, fixing collars or spigot and socket joint by rubber ring and in cement mortar 1:2 etc. complete. Spec.No. : CD.7 Page.No. 162......( Qty For Work P) | 10 | RM | |
157 | 205 | Providing and laying cement concrete pipe of I.S. N.P.2 Class of 300 mm Dia in proper line, level & slope including providing, fixing collars or spigot and socket joint by rubber ring and in cement mortar 1:2 etc. complete. Spec.No. : CD.7 Page.No. 162......( Qty For Work P) | 50 | RM | |
158 | 206 | Providing and laying cement concrete pipe of I.S. N.P.2 Class of 450 mm Dia in proper line, level & slope including providing, fixing collars or spigot and socket joint by rubber ring and in cement mortar 1:2 etc. complete. Spec.No. : CD.7 Page.No. 162......( Qty For Work P) | 300 | RM | |
159 | 207 | Providing, laying and fixing P.V.C. pipe of 75mm dia. with fittings such as bends, tees, reducers, clamps, etc. including necessary excavation, trench filling etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.......( Qty For Work P) | 9 | RM | |
160 | 208 | Filling in plinth and floors with approved excavated materials in 15 cm to 20 cm layers including watering and compaction complete.......( Qty For Work P) | 14.54 | Cum | |
161 | 209 | Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140 kg with frame etc complete.......( Qty For Work P) | 6 | No | |
162 | 210 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge.....( Qty For Work Q) | 534.6 | Square Metre | |
163 | 211 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking rubble obtained by blasting.(Hand broken). with prior approval of concerned Superitending Engineer......( Qty For Work Q)\n | 106.92 | Cubic Metre | |
164 | 212 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete......( Qty For Work Q) | 158.43 | Cubic Metre | |
165 | 213 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge ......( Qty For Work Q) | 106.92 | Cubic Metre | |
166 | 214 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.....( Qty For Work Q) | 158.43 | Cubic Metre | |
167 | 215 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. .....( Qty For Work Q)\n | 534.6 | Square Metre | |
168 | 216 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc) .....( Qty For Work Q) | 48.6 | Cubic Metre | |
169 | 217 | Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete......( Qty For Work Q) | 486 | Square Metre | |
170 | 218 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge .....( Qty For Work Q) | 1 | Number | |
171 | 219 | Cement Concrete Compressive Strength OF C.C. Cube (Set of 3 cubes)......( Qty For Work Q) | 1 | Number | |
172 | 220 | Basic Test of aggregates ,Water Absorption, Specific Gravity,lmpact Value,Crushing Value......( Qty For Work Q) | 1 | Number | |
173 | 221 | Fine aggregates Silt Factor......( Qty For Work Q) | 1 | Number |