}

Annual Repair Maintenance Of Various E And M Installations I/C Water Coolers , Unitary Ac Units , Fire System Etc Of Operational Area Including Technical Building And Nav-Aids Sites At Jaipur International Airport ( 2020-2021 ) ., Jaipur Airport-Rajasthan

Airports Authority Of India has published Annual Repair Maintenance Of Various E And M Installations I/C Water Coolers , Unitary Ac Units , Fire System Etc Of Operational Area Including Technical Building And Nav-Aids Sites At Jaipur International Airport ( 2020-2021 ) .. Submission Date for this Tender is 13-07-2020. Tanks and Cylinders Tenders in Jaipur Airport Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

24743620
Annual Repair Maintenance Of Various E And M Installations I/C Water Coolers , Unitary Ac Units , Fire System Etc Of Operational Area Including Technical Building And Nav-Aids Sites At Jaipur International Airport ( 2020-2021 ) .
Open Tender
Indian
Rajasthan
Jaipur Airport
13-07-2020

Tender Details

Armo Of Various E And M Installations I / C Water Coolers , Unitary Ac Units , Fire System Etc Of Operational Area Including Technical Building And Nav-Aids Sites At Jaipur International Airport ( 2020-2021 ) ., Sh 1 : Supply Of Manpower ( Item No . 1 To 4 ) Providing One Number High-Skilled Manpower In One Shift Of 8 Hour On All Days Including Sundays & Holidays ( Excluding Weekly Off Day ) For One Month For Operation & Maintenance Of Electrical Installations . , Providing Fifteen Number Skilled Manpower In One Shift Of 8 Hour On All Days Including Sundays & Holidays ( Excluding Weekly Off Day ) For One Month For Operation & Maintenance Of Electrical Installations . , Providing Four Number Semi-Skilled Manpower In One Shift Of 8 Hour On All Days Including Sundays & Holidays ( Excluding Weekly Off Day ) For One Month For Operation & Maintenance Of Electrical Installations . , Providing Thirteen Number Un-Skilled Manpower In One Shift Of 8 Hour On All Days Including Sundays & Holidays ( Excluding Weekly Off Day ) For One Month For Operation & Maintenance Of Electrical Installations . , Sh 2 : Cmc Of Fire Fighting System ( Item No . 5 To 16 ) Comprehensive Maintenance Of Fire Fighting System At New Technical Block Includes Main Fire Fighting Pump , Jockey Pump , Main Control Panel , Diesel Engine Pumpset , Hose Cabinet , Hose Couplings , Yard Hydrants , Piping , All Type Of Valves , Wet Riser / Sprinklers System Etc . As Per Inventory Shown In Annexure-C . , Comprehensive Maintenance Of Fire Detection And Alarm System At New Technical Block Includes Main Control Panel , Local Control Panel , All Zone Cards , Smoke Detectors , Electric Hooters , Response Indicators , Manual Call Points , Repeater Panels , Fire Dampers , Pa System Etc . As Per Inventory Shown In Annexure-D . , Comprehensive Maintenance Of Fire Detection And Alarm System At Nav-Aids Sites Includes Alarm Panel With Inbuilt Auto Dialer , Optical Smoke Detector , Sounder , Response Indicators As Per Inventory Shown In Annexure-E . , Comprehensive Maintenance Of Fire Fighting System At Atc Tower & Equipment Room Includes 2 Zone Panel , Novec 1230 Filled Gas Cylinder , Discharge & Actuation Hoses , Nozzles , Detectors Piping , All Valves Etc . Including Filling Of Gas As And When Required As Per Inventory Shown In Annexure-F . , Supply Of 02 Zone Loop Fire Detection And Alarm Panel Including Autodialer , Built-In Charger And Battery Backup Requirements Etc . Complete As Required . , Installation , Testing And Commissioning Of 02 Zone Loop Fire Detecton And Alarm Panel At Different Locations Complete As Required . , Supply Of Conventional Type Photo Electric Fire Detectors With All Accessories Like Base , Box Compatible To 02 Zone Loop Fire Detecton And Alarm Panel Complete As Required . , Installation , Testing And Commissioning Of Fire Detectors At Different Locations Complete As Required . , Supply Of Conventional Type Hooter / Sounder Compatible To 02 Zone Loop Fire Detector And Alarm Panel Complete As Required . , Installation , Testing And Commissioning Of Hooter / Sounder At Different Locations Complete As Required . , Supply Of 1 . 1 Kv Grade , Pvc / Xlpe Insulated , Frls Copper Conductor Armoured Cable Of Size 2 X 1 . 5 Sqmm Conforming To Is:7098 ( Part-I ) With Uptodate Ammendments Complete As Required . , Laying Of 1 . 1 Kv Grade , Pvc / Xlpe Insulated , Frls Copper Conductor Armoured Cable Of Size 2 X 1 . 5 Sqmm On Surface / Existing Pipes Etc Complete As Required . , Sh 3 : Cmc Of Different Type Of Acs And Water Cooler ( Item No . 17 To 31 ) Comprehensive Maintenance Of Different Make 1 . 5 Tr Window Type Airconditioner Including Filling Of Gas & Comprehensive Maintenance Of Voltage Stablizer For One Unit Per Month . , Comprehensive Maintenance Of Different Make 1 . 5 Tr Split Type Airconditioner Including Filling Of Gas & Comprehensive Maintenance Of Voltage Stablizer For One Unit Per Month . , Comprehensive Maintenance Of Different Make 2 . 0 Tr Split Type Airconditioner Including Filling Of Gas & Comprehensive Maintenance Of Voltage Stablizer For One Unit Per Month . , Comprehensive Maintenance Of Different Make 3 . 0 / 3 . 5 / 4 . 0 Tr Tower-Split Type Airconditioner Including Filling Of Gas For One Unit Per Month . , Comprehensive Maintenance Of 17 . 0 Tr Ductable Split-Type Airconditioner Including Filling Of Gas For One Unit Per Month . , Comprehensive Maintenance Of Different Make Water Cooler Of Different Capacity ( Upto 150 Ltr / 150 Ltr Capacity ) Including Filling Of Gas For One Unit Per Month . , Dismantling Of 1 . 5Tr Window Ac Complete In All Respect As Required And Depositing To Aai Store With Inventary ( Transportation Will Be Provided By Aai ) . , Dismantling Of 1 . 5Tr / 2 . 0Tr Split Ac Complete In All Respect As Required And Depositing To Aai Store With Inventary ( Transportation Will Be Provided By Aai ) . , Dismantling Of 3 . 0Tr / 3 . 5 Tr Single / Three Phase Split Ac Complete In All Respect As Required And Depositing To Aai Store With Inventary ( Transportation Will Be Provided By Aai ) . , Supply And Fixing Of Suitable Size Suction And Discharge Copper Reffigerant Piping Including Insulation Suitable For 1 . 5Tr / 2 . 0Tr Split Ac Units . , Supply And Fixing Of Suitable Size Suction And Discharge Copper Reffigerant Piping Including Insulation Suitable For 3 . 0 Tr / 3 . 5 Tr Split Tower Ac Units . , Supply And Fixing Of Suitable Size Pvc Drain Piping For 1 . 5Tr / 2 . 0Tr / 3 . 0Tr / 3 . 0Tr / 3 . 5Tr Split Ac Units . , Installation , Testing And Commissioning Of 1 . 5Tr Window Ac Including Minor Civil Work Complete In All Respect As Required Including Charging , Pressure Testing Of Gas Etc . , Installation , Testing And Commissioning Of 1 . 5Tr / 2 . 0 Tr Split Ac Including Minor Civil Work Complete In All Respect As Required Including Charging , Pressure Testing Of Gas Etc . , Installation , Testing And Commissioning Of 3 . 0Tr / 3 . 5 Tr Vertical Tower Split Ac Including Minor Civil Work Complete In All Respect As Required Including Charging , Pressure Testing Of Gas Etc . , Sh 4 : Ist Of Ht Equipments ( Item No . 32 To 37 ) Inspection , Servicing And Testing Of Crompton Make Vacuum Circuit Breaker ( 11Kv , 800 Amps Capacity ) From The Manufacturer From The Authorised Service Dealer Of Manufacturer . Cost Of Spares ( If Required ) Shall Be Paid Extra By Aai . , Inspection , Servicing And Testing Of Kirloskar Make Sf6 Breaker ( 33Kv , 1250 Amp Capacity ) From The Manufacturer From The Authorised Service Dealer Of Manufacturer . Cost Of Spares ( If Required ) Shall Be Paid Extra By Aai . , Supply And Refilling Of Sf6 Gas In 33 Kv Circuit Breaker Per Pole I / C Testing , Rectification Of Leakage Complete As Per Site Requirement . , Inspection , Servicing Of On Load Tapchanger ( Oltc ) Ctr Make Type En16 Fitted With 5Mva 33 / 11 Kv Kirlosker Make Transformer From Oem Or Authorised Service Center Of Oem Including Inspection And Testing Of Remote Tap Change Circuit ( Rtcc ) Panel Complete In All Respect As Required ( Cost Of Spare , If Required Shall Be Paid Extra By Aai ) . , Checking , Servicing Callibratiion & Testing Of Following Protecion Relays Provided On 33 Kv Sf6 Breaker Panel Complete As Per Site Requirement- A ) Numerical O / C & Earth Fault Relays ( 3 Oc + 1 Ef ) - 04 Nos . B ) Master Trip Relay - 04 Nos . C ) Trip Ckt Supervision Relay - 04 Nos D ) Aux Relay For Tx Protection - 04 Nos . E ) Earth Fault Relay For Tx Neutral - 02 Nos . F ) Bulchhoz Relay Trip / Alarm , Winding Temp . Trip / Alarm , Oil Temp . Trip / Alarm , Osr Trip / Alarm , Mog Alarm - 02 Set , Checking , Servicing , Callibration & Testing Of Following Protection Relays Provided On 11 Kv Vcb Breaker Panel Complete As Per Site Requirement . A ) Numerical O / C & Earth Fault Relays ( 3 0C + 1

Key Value

Document Fees
INR 1120 /-
EMD
INR 215223.0 /-
Tender Value
INR 1.07 Crore /-

BOQ Items

Name of Work: ARMO of various E&M installations i/c water coolers, unitary AC units, fire system etc of operational area including Technical Building & NAV-AIDS sites at Jaipur International Airport (2020-2021).
Sl. No. Item Description Item Code / Make Quantity Units
1 1 SH 1 : Supply of Manpower (Item No. 1 to 4)\nProviding one number HIGH-SKILLED Manpower in one shift of 8 hour on all days including sundays & holidays (excluding weekly off day) for ONE MONTH for operation & maintenance of electrical installations. Item 1 12 Job
2 2 Providing fifteen number SKILLED Manpower in one shift of 8 hour on all days including sundays & holidays (excluding weekly off day) for ONE MONTH for operation & maintenance of electrical installations. Item 2 12 Job
3 3 Providing Four number SEMI-SKILLED Manpower in one shift of 8 hour on all days including sundays & holidays (excluding weekly off day) for ONE MONTH for operation & maintenance of electrical installations. Item 3 12 Job
4 4 Providing Thirteen number UN-SKILLED Manpower in one shift of 8 hour on all days including sundays & holidays (excluding weekly off day) for ONE MONTH for operation & maintenance of electrical installations. Item 4 12 Job
5 5 SH 2 : CMC of fire fighting system (Item no. 5 to 16)\nComprehensive maintenance of fire fighting system at New Technical Block includes Main Fire Fighting Pump, Jockey Pump, Main Control Panel, Diesel Engine Pumpset, Hose Cabinet, Hose Couplings, Yard Hydrants, piping, all type of valves, Wet Riser / Sprinklers System etc. as per Inventory shown in Annexure-C. Item 5 12 Month
6 6 Comprehensive maintenance of fire detection and alarm system at New Technical Block includes main Control Panel, local control panel, all zone cards, smoke detectors, electric hooters, response Indicators, manual call points, repeater panels, fire dampers, PA system etc. as per Inventory shown in Annexure-D. Item 6 12 Month
7 7 Comprehensive maintenance of fire detection and alarm system at Nav-Aids sites includes alarm panel with inbuilt auto dialer, optical smoke detector, sounder, response indicators as per Inventory shown in Annexure-E. Item 7 12 Month
8 8 Comprehensive maintenance of fire fighting system at ATC tower & Equipment room includes 2 zone panel, NOVEC 1230 filled gas cylinder,discharge & actuation hoses, nozzles, detectors piping, all valves etc. including filling of gas as and when required as per Inventory shown in Annexure-F. Item 8 12 Month
9 9 Supply of 02 Zone loop fire detection and alarm panel including autodialer, built-in charger and battery backup requirements etc. complete as required. Item 9 1 Each
10 10 Installation, Testing and commissioning of 02 Zone loop fire detecton and alarm panel at different locations complete as required. Item 10 1 Each
11 11 Supply of conventional type photo electric fire detectors with all accessories like base, box compatible to 02 Zone loop fire detecton and alarm panel complete as required. Item 11 10 Each
12 12 Installation, Testing and commissioning of fire detectors at different locations complete as required. Item 12 10 Each
13 13 Supply of conventional type hooter/sounder compatible to 02 Zone loop fire detector and alarm panel complete as required. Item 13 5 Each
14 14 Installation, Testing and commissioning of hooter/sounder at different locations complete as required. Item 14 5 Each
15 15 Supply of 1.1 KV grade, PVC/XLPE insulated, FRLS copper conductor armoured cable of size 2 x 1.5 sqmm conforming to IS:7098 (part-I) with uptodate ammendments complete as required. Item 15 100 Mtr
16 16 Laying of 1.1 KV grade, PVC/XLPE insulated, FRLS copper conductor armoured cable of size 2 x 1.5 sqmm on surface/existing pipes etc complete as required. Item 16 100 Mtr
17 17 SH 3 : CMC of different type of AC's and Water Cooler (Item No. 17 to 31)\nComprehensive maintenance of different make 1.5 TR window type airconditioner including filling of gas & comprehensive maintenance of voltage stablizer for ONE UNIT PER MONTH. Item 17 228 Job
18 18 Comprehensive maintenance of different make 1.5 TR split type airconditioner including filling of gas & comprehensive maintenance of voltage stablizer for ONE UNIT PER MONTH. Item 18 984 Job
19 19 Comprehensive maintenance of different make 2.0 TR split type airconditioner including filling of gas & comprehensive maintenance of voltage stablizer for ONE UNIT PER MONTH. Item 19 708 Job
20 20 Comprehensive maintenance of different make 3.0/3.5/4.0 TR tower-split type airconditioner including filling of gas for ONE UNIT PER MONTH. Item 20 84 Job
21 21 Comprehensive maintenance of 17.0 TR ductable split-type airconditioner including filling of gas for ONE UNIT PER MONTH. Item 21 36 Job
22 22 Comprehensive maintenance of different make water cooler of different capacity (upto 150 Ltr/150 Ltr capacity) including filling of gas for ONE UNIT PER MONTH. Item 22 96 Job
23 23 Dismantling of 1.5TR Window AC complete in all respect as required and depositing to AAI store with Inventary (Transportation will be provided by AAI). Item 23 20 Each
24 24 Dismantling of 1.5TR /2.0TR split AC complete in all respect as required and depositing to AAI store with Inventary (Transportation will be provided by AAI). Item 24 40 Each
25 25 Dismantling of 3.0TR/3.5 TR single / three phase split AC complete in all respect as required and depositing to AAI store with Inventary (Transportation will be provided by AAI). Item 25 20 Each
26 26 Supply and fixing of suitable size suction and discharge copper reffigerant piping including insulation suitable for 1.5TR / 2.0TR split AC units. Item 26 200 Mtr
27 27 Supply and fixing of suitable size suction and discharge copper reffigerant piping including insulation suitable for 3.0 TR /3.5 TR split Tower AC units. Item 27 100 Mtr
28 28 Supply and fixing of suitable size PVC drain piping for 1.5TR / 2.0TR / 3.0TR/ 3.0TR/3.5TR split AC units. Item 28 100 Mtr
29 29 Installation, Testing and Commissioning of 1.5TR Window AC including minor civil work complete in all respect as required including charging, pressure testing of gas etc. Item 29 10 Each
30 30 Installation, Testing and Commissioning of 1.5TR /2.0 TR Split AC including minor civil work complete in all respect as required including charging, pressure testing of gas etc. Item 30 30 Each
31 31 Installation, Testing and Commissioning of 3.0TR /3.5 TR Vertical Tower split AC including minor civil work complete in all respect as required including charging, pressure testing of gas etc. Item 31 10 Each
32 32 SH 4 : IST of HT equipments (Item no. 32 to 37)\nInspection, Servicing and Testing of Crompton make Vacuum Circuit Breaker (11KV, 800 amps capacity) from the manufacturer from the authorised service dealer of manufacturer. Cost of spares (if required) shall be paid extra by AAI. Item 32 8 Set
33 33 Inspection, Servicing and Testing of Kirloskar make SF6 Breaker (33KV, 1250 amp capacity) from the manufacturer from the authorised service dealer of manufacturer. Cost of spares (if required) shall be paid extra by AAI. Item 33 5 Set
34 34 Supply and refilling of SF6 Gas in 33 KV circuit breaker per pole i/c testing, rectification of leakage complete as per site requirement. Item 34 1 Set
35 35 Inspection, Servicing of ON LOAD TAPCHANGER (OLTC) CTR make type EN16 fitted with 5MVA 33/11 kV kirlosker make transformer from OEM or authorised service center of OEM including inspection and testing of REMOTE TAP CHANGE CIRCUIT (RTCC) Panel complete in all respect as required (Cost of spare, if required shall be paid extra by AAI). Item 35 1 Set
36 36 Checking, servicing callibratiion & testing of following protecion relays provided on 33 KV SF6 Breaker panel complete as per site requirement-\na) Numerical O/C & Earth fault relays (3 OC + 1 EF) - 04 Nos.\nb) Master trip relay - 04 Nos.\nc) Trip Ckt Supervision relay - 04 Nos\nd) Aux relay for Tx protection - 04 Nos.\ne) Earth fault relay for Tx neutral - 02 Nos.\nf) Bulchhoz relay trip/alarm, winding temp. trip/ alarm, oil temp. trip /alarm, OSR trip/ alarm, MOG alarm - 02 set Item 36 1 Set
37 37 Checking, servicing, callibration & testing of following protection relays provided on 11 KV VCB Breaker panel complete as per site requirement.\na) Numerical O/C & Earth fault relays (3 0C + 1 EF) - 9 Nos\nb) Master trip relay - 9 Nos\nc) Trip ckt supervision relay - 9 Nos Item 37 1 Set
38 38 SH 5 : Miscellaneous work (Item No. 38 to 45)\nPin-pointing the Fault location in 33 KV HT Cables mostly laid out side the airport premises along the tonk road and JLN Marg of size 300 sq. mm by using cable electronic operated fault locator machine etc. as required. Item 38 4 Each
39 39 Supplying and making straight through cable jointing with heat shrinkable jointing kit complete with all accessories including ferrules suitable for 300 sqmm size of 3 core, XLPE aluminium conductor cable of 33 kV grade as required. Item 39 4 Each
40 40 Repairing & Rewinding of upto 10 HP submersible motor including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned) Item 40 5 Each
41 41 Repairing & Rewinding of 12 HP submersible motor including replacement of Motor bush, Oil seal, bearings etc including dismantiling the existing pump, transportation to & fro, re-installation, testing commissioning etc complete as required. (Dismantle copper wire, bushes etc. need not to be returned) Item 41 5 Each
42 42 Lifting & Lowering of 7.5/10/12.5 HP submersible pump upto the depth of 150 meter including arrangement of all required T&P and sundaries etc complete as required. Item 42 3 Each
43 43 Rewinding of fan motor of Ceiling Fan/Wall mounted Fan etc with super enamelled copper wire of required grade insulation and Providing & Fixing of brass bushes Including dismantiling the existing fan motor, transportation to & fro, re-installation, testing commissioning etc complete as required. Item 43 10 Each
44 44 Rewinding of fan motor of Exhaust fan with super enamelled copper wire of required grade insulation and Providing & Fixing of brass bushes Including dismantiling the existing fan motor, transportation to & fro, re-installation, testing commissioning etc complete as required. Item 44 10 Each
45 45 CPWD - DSR 2018 ( E&M)\nNote:\n(i) The rate for this item has to be quoted carefully.\n(ii) Please refer the guidelines for quoting the rate for this item, it is mentioned in clause 30 (c) of Page GTT-5 of this tender. Item 45 300000 ONE
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail