Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Routine, Preventive/Breakdown / Overhauling Maintenance Of Plant Air, Instrument Air Compressor Ihi (Japan) Make, Its Accessories And General Upkeep Of Compressor Air System Of 2X500 Mw, Btps Anpara. Submission Date for this Tender is 30-07-2020. Air Compressor Tenders in ANPARA Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Routine, preventive/Breakdown / overhauling maintenance of Plant Air, Instrument Air Compressor IHI (Japan) make, its accessories and General upkeep of compressor air system of 2X500 MW, BTPS Anpara | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | PART - A (Routine Maintenance) | |||
2 | 1.1 | Daily/Shift-wise maintenance of 07 No’s Air compressors, compressed air system round the clock | 365 | Job | |
3 | 2 | Part-B (Preventive & Breakdown Maintenance) | |||
4 | 2.1 | Preventive /Breakdown Maintenance of following equipment | |||
5 | 2.11 | Inter-cooler/After-cooler | 10 | Job | |
6 | 2.12 | Pre-filter and After-filter | 4 | Job | |
7 | 2.13 | Dryer, valves & accessories | 4 | Job | |
8 | 2.14 | Air Receivers | 7 | Job | |
9 | 2.2 | Preventive/Breakdown maintenance of air compressors valves | 100 | Job | |
10 | 2.3 | Inspection and attending leakage and breakdown of piston and cylinder liner of compressor. | |||
11 | 2.31 | LP/HP Piston | 10 | Job | |
12 | 2.32 | LP/HP cylinder liner | 2 | Job | |
13 | 2.4 | Servicing and attending fault of lub oil system including all parts e.g. filter cooler, strainer, pump pipe line. | 5 | Job | |
14 | 2.5 | Decoupling, alignment and coupling of plant air compressor motor with compressor.\n\n | 3 | Job | |
15 | 3 | PART - C (Overhauling Maintenance) | |||
16 | 3.1 | Overhauling maintenance and trial run of following equipments. | |||
17 | 3.11 | Plant air compressor | 3 | Job | |
18 | 3.12 | Instrument air compressor | 4 | Job | |
19 | 3.13 | Air Dryer, Pre-filter, After-filter | 4 | Job | |
20 | 3.2 | Painting & polishing of following equipment after their overhauling. | |||
21 | 3.21 | Plant air compressor | 3 | Job | |
22 | 3.22 | Instrument air compressor | 4 | Job | |
23 | 3.23 | Air Dryer, Pre-filter, After-filter | 4 | Job | |
24 | 3.3 | Servicing, repairing of valve seats of valves & NRVs of Instrument & Plant Air Line. (Size-75mm-200mm) | 10 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail