Tender For Short Refit Of 50T Tug Himmat-Marine Services , Naval Ship Repair Yard Karwar-Karnataka

Indian Navy-IN has published Tender For Short Refit Of 50T Tug Himmat-Marine Services . Submission Date for this Tender is 18-07-2020. Marine Work Tenders in Naval Ship Repair Yard Karwar Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

24708909
Tender For Short Refit Of 50T Tug Himmat-Marine Services
Open Tender
Indian
Karnataka
Naval Ship Repair Yard Karwar
18-07-2020

Tender Details

Tender For Short Refit Of 50T Tug Himmat-Marine Services

Key Value

Document Fees
Refer document
EMD
INR 1000000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: SHORT REFIT WORK PACKAGE - 50T TUG HIMMAT
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Erection of fixed staging/scaffolding in way of steel renewal work(Based on Volume Basis, LXBXH). Staging material to be provided by Contractor GS1 450 Cu.m
2 2 Provision of Fire sentry for minimum 05 hot work locations /day Note:- Fire sentries with adequate knowledge of fire and safety procedures for all hot work locations will need to be provided i.a.w NO 09/12. Sentries are to be in possession of required type of fire extinguishers in appropriate quantity. All sorts of fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/ incident. GS2 300 Mandays
3 3 Cleaning and Gas free certification of Fuel / Oil Tanks, Water ballast Tank, Fresh Water Tank . Quote for Service. (774 Sq.m). Material and Service to be provided by contractor GS3 7 Nos
4 4 Pressure Testing of Underwater tanks/void spaces/cofferdams. Including repairs/blanking of manhole covers( with new rubber gaskets/studs/bolts/as required) and defect rectification of all structural leaks i.a.w NO. 01/15. Material and spares to be provided by contractor.Ballast Tank (Qty 03), Fuel Tank (Qty 05), FW Tank (Qty 02), Misc Tank (Qty 04). Material and Service to be provided by contractor Pressure Testing of Tanks 14 Nos
5 5 Bollard and Fairlead - Surface preparation by hydrojet blasting up to bare metal to WJ 2 Standard. Repairs to be undertaken as per hull survey report of bollards / fairleads and stiffening members in the vicinity. Bollard (Qty 13), Fairleads/ mooring pipes (Qty 10). Note:- After hydrojet blasting, primer application to be undertaken to prevent flash rusting the same is to be put up for inspection prior to repair / renewal or painting to refit monitoring team. Inspection to be cleared post repairs by NSRY/ QC Team.\nMaterial and spares to be provided by contractor Hull Survey 15 Sq.m
6 6 Renewal of sea tube/Sea chests. (Including DPT of weld seam) i.a.w NES 155, NES 706. Material and Service to be provided by contractor Sea Tubes-1 3 Nos
7 7 Pressure testing of sea tube to 0.2 Bar upto 10 mins i.a.w NO 01/15. Material and Service to be provided by contractor Sea Tubes-2 3 Nos
8 8 Underwater Plating - \n(a) Remove marine fouling and old paint to bare metal from hull using hydrojet blasting to WJ 2 standard.\n(b) Paint scheme on full underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area is to be restored.\n(c) Application of paint on underwater hull and boot top area to be carried out post WJ 2 standard.\n(d) Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint. (i) Forward (ii) Midship, (iii) Aft. Renew defective draught marks. \nNote-: Navy approved paint scheme Akzonobel to be applied. Painting to be carried out as per NO 53/16.\nMaterial and spares to be provided by contractor Under water plating 600 Sqm
9 9 Above Water Area, Weather Deck Area and Masts \nCarry out surface preparation by hydro jet blasting up to bare metal to WJ 2 standard. Defects to be rectified as per hull survey report. Carry out painting of above water area with high performance advanced hybrid coating system as per navy approved paint scheme Akzo Nobel mentioned below and weather deck area to be painted with high performance non- skid coating system as per navy approved paint scheme Akzo Nobel mentioned below. \n(a) Paint scheme for above water area (ship side, Mast, deck & super structure including bridge) (Area - 545 sqm):- (i) 02 coats of primer to achieve 80 microns DFT (ii) 02 coats of RAL 7040 colour specification to achieve 80 microns thickness (iii) Total DFT 320 microns. \n(b) Paint scheme of weather deck area (upper deck, funnel deck and bridge top deck) (Area – 385 Sq m):- (i) 01 coat primer coat - DFT 50 microns, (ii) 01coat anti corrosive intermediate coat - DFT 200 microns, (iii) 01 coat nonskid top coat - DFT 800 microns, (iv)Total DFT - 1050 microns. \nNote:- Painting to be carried out as per NO 53/16. Mast to be rigged up and proved post painting .\nMaterial and Service to be provided by contractor. Above Water Area, Weather Deck Area and Funnel Area including Masts 930 Sq m
10 10 Funnel - Carry out surface preparation by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint of surroundings structure, funnel structure. Heat resistant paint on funnel to be applied as per navy approved paint scheme RAL 9011(black) and/or RAL 9010 (White) And/or IS 5/ 358 (Buff colour) as per NO 53/ 16. Material and Service to be provided by contractor Funnel 100 Sq.m
11 11 Machinery Spaces - Clean all bilges, machinery foundation and surface preparation as per ST 3 standard and painting of the entire area. Clean all limber holes and drain holes. Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paint to be provided by Firm.\nMaterial and Service to be provided by contractor \nNote: - Equipments to be preserved/ covered prior power tooling. Machinery spaces-1 757 Sq m
12 12 Machinery Vibration Mounts - Manually clean and apply Nicole lacquer on the vibration mounts of all equipment. Material to be provided by refitting firm. 25% of the total mounts are to be replaced post undertaking grouping of mounts based on SPM Checks. To be paid on actuals. \nMaterial and Service to be provided by contractor Machinery spaces-2 32 Nos
13 13 Lagging \nRenew damaged / perished lagging at various places using pin method. Renew / restore in case of existing areas, paint scheme of affected areas before renewal of lagging. Material to be provided by refitting firm.\nMaterial and service to be provided by contractor Machinery spaces-3 180 Sqm
14 14 Cathodic Protection Sacrificial Anodes - Renew sacrificial anodes (Mk II & Mk III) fitted to underwater hull, stern tubes, inlets and outlets, sea chest, bilges and coffer dams based on survey report. Renew those consumed more than 25 % or more as per survey report. Clean remaining sacrificial anodes with steel wire brush. Quality certificate of the Anode to be provided for newly fitted anodes prior fitment. To be paid on actual. \nMaterial and service to be provided by contractor Cathodic protection sacrificial anodes 54 Nos
15 15 Steel Renewal of structural plates (with Stiffeners) of deck and bulkheads including tank tops (including degutting of lagging, perforated paneling, cabling assiciated equipment minor eqpts., brackets, wooden fittings, machinery / equipment, switchboard / control panels, electronic and communication equipment, all light fittings, pipe lines, valves, electrical cables, junction boxes, obstructions, protrusions, foundation etc. etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting) of thickness as specified below with testing of weld joints by DPT. Steel plates supplied by Yard. All consumables material supplied by contractor. Steel renewal 1000 Kgs
16 16 Renewal of wooden furniture. Table with 4 drawer (Qty 02) (1000x600x750H), Notice board (Qty 02) (300x50x400H), Towel hanging arrangements (Qty 05). Mat - Wood\nMaterial and service to be provided by contractor Accommodation and offices-1 1 Job
17 17 Renewal of Furniture-\nAccommodation and Offices - Renewal of Center Table (Wooden) (Qty 01) (850x500x450h). Material and service to be provided by contractor Accommodation and offices-2 1 Nos
18 18 Repair of locking arrangement of lockers and cupboards in cabins and wheel house. Material and service to be provided by contractor Accommodation and offices-3 55 Nos
19 19 Renewal of Plywood at lockers, cupboards and other wooden furniture in various offices and accommodations . Material and spares to be provided by contractor Accommodation and offices-4 30 Sq.m
20 20 Repair of Bunk lockers as per sample. (Qty 05). Mat - Wood. Material and service to be provided by contractor Accommodation and offices-5 1 Job
21 21 Renewal of Sofa with table (qty 01) (5 men sofa) as per sample. Material and service to be provided by contractor Accommodation and offices-6 1 Nos
22 22 Renewal of mattress with cover and their securing arrangements. Single type mattress. Thickness - 6" as per sample.\nMaterial and service to be provided by contractor Accommodation and offices-7 12 Nos
23 23 Renewal of Chairs in dining hall, master cabin, ED cabin as per sample. Dinning chair (Qty 06), Executive chairs (Qty 04), Revolving chair (Qty 02), Wheel House Chair (Qty 02), Engine Room Chair (Qty 01).Material to be provided by contractor Misc fittings-12 1 Job
24 24 Removal of old damaged deck covering to be undertaken. Surface preparation post renewal to be carried out for hull survey. Defects to be rectified as per survey report of yard. Deck covering to be renewed post application of primer on deck. (Mfd – M/s Macrotech). Material and spares to be provided by contractor Macrotech 40 Sqm
25 25 Anchor, Chain Cable and Cable Locker - Lay out Anchor and chain cables and carry out surface preparation up to bare metal for survey. Repairs to be under taken as per hull survey report. Undertake survey of cable and shackles.Dismantle anchor and chain cable , clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear. Re-mark cable length. Examine hull associated fittings. Clean and grease trunion pin and housing. Grease to be used:- LG-280 Patt No 0474/910-0502. The machined surface of the joints of lugless joining shackles are to be examined for corrosion. All such shackles are to be stripped, greased and re-assembled. Anchor, chain cable and cable locker to be painted as per existing paint scheme. Paint to be provided by refittng firm. (Qty: Anchor - 02, chain length- 275 mtr, Swivel piece - 04, Lug less Joining shackles - 16, D Shackles - 04). Material and service to be provided by contractor. Anchor, chain cable and cable locker 1 Job
26 26 Overhauling-\nCapstan (Mfd- Geeta Eng. Works) - Following work to be carried out:-\n(a) Overhauling of capstan along with motor assembly and changing of oil. Equipment to be proved for satisfactory operation. Undertake weather proofing of motor terminal box.\n(b) Renew all high speed bearings. \n(c) Blow out all motor windings thoroughly with clean dry air.\n(d) Clean and thereafter varnish dirty and oily windings. \n(e) Motor to be overhauled, with both bearings renewed & tested onboard on load (subject to QC checks).\n(f) Overhauling of brake mechanism to be carried out.\n(f) Inspect and overhaul the control panel and renew defective components and cabling.\n(g) System to be proved for designed operation and load trials to be offered. \nMaterial and Service to be provided by Contractor Mfd- Geeta Eng. Works-1 1 Job
27 27 Overhauling-\nAnchor Winlass (Mfd- Geeta Eng. Works) - Following work to be carried out:-\n(a) Overhauling of anchor winch along with motor assembly, rollers and anchor windlass and accessories. Changing of oil and insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. Undertake survey of structure post load testing. Structural defects to be rectified, if any.\n(b) Renew all high speed bearings (6208.2zr).\n(c) Blow out all motor windings thoroughly with clean dry air.\n(d) Clean and varnish dirty and oily windings.\n(e) Motor to be overhauled, both bearing to be renewed & tested onboard on load (subject to QC checks).\n(f) Overhaul brake mechanism.\n(g) Overhaul the control panel, and renew defective components and cabling.\n(h) Load test details to be furnished. Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs.\n(j) System to be proved for designed operation and load trials to be offered. (k) Carry out surface prepaeation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Material and Service to be provided by Contractor Mfd- Geeta Eng. Works-2 1 Job
28 28 Overhauling of mushroom head with spindle and valves to be undertaken. Wire mesh to be renewed. Material and service to be provided by contractor Mushroom head 7 Nos
29 29 Overhauling\nSewage treatment plant Mfd- M/s EVAC OY (N40CE) - Undertake following routines: \n(a) Functioning of level switches of V-1 tank. Carryout de-sludging of V-2 tank by back flushing line. Clean the seawater ‘y’ type strainer at the inlet to bookcell. Lub oil to be renewed. Clean air supply filter / regulator element in solvent. Drain, inspect & clean the ‘bookcell’. Remove large deposits of hard material with diluted hydrochloric acid. Post completion of routines, operate system and inspect for leaks and proper cell amperage. \n(b) Inspect the tightness of belt and check leakage from gland of discharge pump. Repack the gland (if required). \n(c) Carry out following on Macerator pump:- \n(i) Check to ensure there are no leakages from the main seals. Renew drive end bearing and seals. \n(ii) Ensure impeller is free for rotation with no vibration. \n(iii) Ensure overload units operating correctly. \n(iv) Remove drain plugs provided at each end of the bracket of the electric motor and allow any accumulated moisture to drain away. Replace damaged plugs. \n(d) Clean and lubricate all plug cock valves. Lubricate valves in fully opened or fully closed position only. \n(e) Post repairs, STP to be proved for operation as per designed parameters.\n(f) Undertake effluent test from NABL accredited lab and check compliance to MARPOL norms.\n(g) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of marpol 73/78.\n(h) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate.\nMaterial and service to be provided by contractor Mfd- M/s EVAC OY (N40CE) 1 Job
30 30 Ventilation Blowers - Renew perished / damaged trunkings as fitted onboard including wire mesh / lourers, rubber beadings, gaskets, fasteners, ventilation flaps and earthing strips on upper deck and mess. Paint to be restored post repairs as per existing paint scheme. To be paid on actuals. \nMaterial and Service to be provided by contractor Ventilation system-1 80 Sqm
31 31 Renew Grease filters inside exhaust trunking in galleys, Qty- 02. Material and Service to be provided by contractor Ventilation system-2 2 Nos
32 32 Renewal of Ventilation flaps of broken wire mesh broken, corroded air vent , perished flaps rubber beading along with renewal of Hinges and butterfly nuts . Mat - MS. Material and Service to be provided by contractor Ventilation flaps 16 Nos
33 33 Renewal of Life raft stowing brackets, HRG, launching arrangement along with rubber padding. Job involves renewal of life raft securing straps with end fittings, slips, shackles, and rubber padding. Operationalise of launching mechanism to be proved in presence of user department. Material and Service to be provided by contractor Life raft 1 Job
34 34 Ladders - Carry out mechanical surface preparation of all ladders up to bare metal. Repairs to be under taken as per hull survey report of ladders with associated footsteps. Damaged area to be renewed. Paint to be restored as per existing paint scheme. \nMaterial and Service to be provided by contractor Ladders 8 Nos
35 35 Renewal of Footsteps at various places as per sample. Mat-MS .Material and Service to be provided by contractor Misc fittings-2 1 Job
36 36 Overhauling\nSingle arm boat davit Mfd - Hemant Engineering Pvt Ltd- (a) Overhauling of boat davit, gear box along with motor assembly and cut off switches. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. During trials motor parameters are to recorded and same to be cleared by qc. Offer for trials to ss post completion. \n(b) Survey wire rope, spare gear and other associated lifting gears. Renew as necessary.\n(c) Carry out load testing with davit fully rigged up. After completion of load test. Examine the complete davit structure and associated lifting gears for flaws, distortion, defecation etc. Flaws must be examined, carry out repairs if necessary and retest.\n(d) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint post surface preparation.\n(e) System to be proved for designed operation and load trials to be offered. \nMaterial and Service to be provided by contractor Single arm boat davit 1 Job
37 37 Overhauling\n4.7 Mtr RIB Mfd - M/s Poly Glass Fibre Industries - Operanlised the RIB. Carry out following: - \n(a) Repair of hull structure to be carried out. Boat collar to be renewed. Job involves removal of existing damaged collar and fitment of new boat collar. Trials to be carried out along with weighing of boat with accessories post repairs. Test certificate to be provided.\n(b) Overhauling of motor boat engine including calibration of injectors.\n(c) Starting battery to be renewed(12V, 96AH) (Qty - 02).\n(d) Renewal of all defective electrical cables and wirings (2.5 sq. Mm, 2 core, 10 mtr).\n(e) All instrumentation gauges/ meters to be renewed including instrumentation panel. \n(f) Boat chocks and cushion of sitting arrangement of rescue boat, to be repaired.\n(g) Boat securing strap (gripes) to be renewed along with end fittings. Mat - polyester.\n(h) 02 in Nos oars and boat hook for rescue boat damaged / broken. To be renewed. \n(j) Renew polyester webbing boat sling for lowering and hoisting purpose. SWL 3.5 ton. Load test certificate to be provided. \nBoat trials to be conducted and proved for satisfactory performance. Material and Service to be provided by contractor 4.7 Mtr RIB 1 Job
38 38 Overhauling \nSanitary System -Operationlised complete sanitary system. (a) Strip, clean and overhaul WC and urinal flushing valves, reducing valves and reducer (Qty 08).(b) Strip and clean sanitary system drain pipes. Re-galvanize where required (Length - 24 m).(c) Following accessories in the WC and bathroom to be renewed:- (a) Shower - 05, (b) Wash basin tap - 05, (c) commode seat cover - 03, (d) Commode flush knobs - 04, (e) Wash Basin drain pipe - 08, (f) Urinal with associated fittings - 02 . Material and Service to be provided by contractor Sanitary system 1 Job
39 39 Domestic fresh water system - Strip, clean and overhaul domestic fresh water system valves in WCs and bathrooms. Stop cock (qty 05), basin beep cock (pillar) (Qty 04) and sink beep cock (pillar) (qty 01). Material - Brass (chrome plated). \nMaterial and Sevice to be provided by contractor Domestic fresh water system 1 Job
40 40 Overhauling of Towing hook with quick release mechanism, Mfd- M/s Nautiluis Eng & Construction Company - Carry out load testing of towing hook and undertake repairs. Job involves serviceability of release line and repairs. Load test certificate to be provided. Material and spares to be provided by contractor Towing hook 1 Job
41 41 Doors-Water Tight - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repair clips, hinges for looseness and wedge pieces for signs of wear and tear. Examine leather washers, toridal sealing rings and rubber sealing. Renew worn out parts and rubber beading. Carry out chalk test of all W/T doors. Paint to be restored as per existing paint scheme. (Qty - 12). Material and Service to be provided by contractor NCD 1447 Issue 2, NES 155, NES 707 1 Job
42 42 Non water tight doors - Repair 05 in nos NWT doors hinges and deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, hydraulic door closing mechanism and rubber beading and removal & fitment, repairs to coaming of door, structural coaming, frames). (Qty - 20). Material and Service to be provided by contractor NCD 1447 Issue 2, NES 155, NES 708-1 1 Job
43 43 WT Hatch - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repairs and overhauling of WT Hatches. (Including surface preparation of hatch body and primer application, repairs to Coaming of hatches, Structural coaming, frames and straightening of bent hatches by removal & fitment, replacement of locks, auto locks, hinge pins, hinge assembly, rubber beading and removal & fitment).Carry out chalk test post repairs and renew worn out parts as necessary. (Qty - 04) \nMaterial and Service to be provided by contractor NCD 1447 Issue 2, NES 155, NES 708-2 1 Job
44 44 Manhole- Renewal of rubber beading of manholes. (Qty -14). Material and Service to be provided by contractor NCD 1447 Issue 2, NES 155, NES 710 1 Job
45 45 Scuttles - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardent cloth. Scuttles - 18 . Material to be provided by refitting firm. NCD 1447 Issue 2, NES 155, NES 711 1 Job
46 46 Windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardent cloth. Windows - 20. Material to be provided by refitting firm. Scuttles & Windows-1 1 Job
47 47 Internal super structure and compartments - Repair works to be undertaken on hull structure including bulkhead and fittings as per survey report of various compartments on upperdeck and below decks. Painting to be undertaken post repairs as per existing paint scheme. Quote for service and material. Scuttles & Windows-2 130 Sqm
48 48 Air line on main deck corroded / broken at various locations. To be renewed in-situ. Job involves welding and cutting assistance. Mat - MS.\nMaterial and service to be provided by contractor Guardrails and stanchions 50 RMT
49 49 Fender - Portable cylindrical rubber pneumatic fender damaged. To be renewed. Rubber Mat - EBDM/ NBR Dimension - 900X250 MM. Quote for Material. Feed water tank 4 Nos
50 50 9 Mtr aluminum gangway damaged / broken. To be replaced as per existing gangways. Mat - Al, length - 09m. Material and Service to be provided by contractor Water Ballast Tank and Fresh Water Tank 1 Nos
51 51 Steel Renewal of A/W Structural plates along with Stiffeners of Deck and bulkheads and ship side (including degutting of lagging, perforated paneling, cabling associated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting)and thickness as specified below:Material grades: DMR 249A, DMR249B, D 40S, MS, B Quality steel.Standard : NES 155, NES 706. Steel plates supplied by yard and Welding Consumables to be supplied by contractor. Payment on actuals. Misc structure-1 2000 Kgs
52 52 Fabrication and fitment of minor and major foundations (including degutting of lagging, perforated paneling, cabling assiciated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting).Standard : NES 155, NES 706(Steel supply by yard and weld consumables by Contractor) Misc structure-2 200 Kgs
53 53 Repair & refitment of panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor Misc fittings-3 50 Sqm
54 54 Fabrication & fitment of new panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor Misc fittings-4 50 Sqm
55 55 Paint Scheme renewal \nWater Ballast Tank and Fresh water tank - Carry out surface preparation to ST 3 standards, Repair plating, structures and fittings of tank as per survey report. Thereafter Paint to be restored as per existing paint scheme for the following tanks:- \n(a) Water Ballast Tanks – 340 Sqm \n(b) Fresh Water Tanks – 297 Sqm. \nMaterial and Service to be provided by contractor Water Ballast Tank 637 Sqm
56 56 Fender - (a) Renewal of D-Type rubber fenders on all around of yard craft . Fenders to be renewed as per existing fitted sample. Length- 40 mtr; Thickness – 5.5 inch \n(b) securing fasteners (Mat - MS) for fenders to be manufactured as per sample and fitted back. New fenders to be provided by firm. Type – Heavy duty D-type rubber fender; Mat of rubber - EBDM/ NBR/ Natural rubber. \nMaterial and spares to be provided by contractor D type -Fenders 40 RMtr
57 57 Fender -Tyre fenders of barge found damaged. Renewal of tyre fenders (Air craft old tyres) (Qty- 43) (Aircraft tyres with outer dia 90 cm) to be carried out. ( Note : Vendor to clear QC checks from user manager prior fitment). Hot work required for removal and fitment of tyre fenders including degutting of lagging,panelling, cabling equipment affected by hotwork and regutting to be undertaken. New heavy duty tyre fenders and associated fittings to be provided by firm. \nMaterial and Service to be provided by contractor Tyre fenders and associated accessories 25 Nos
58 58 Fenders - Renewal of eye pads associated with rubber fenders as per sample . ( Note : Vendor to clear QC checks from user manager prior fitment) . Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders.Degutting and regutting of lagging,panelling,cabling,equipment affected by hotwork to be undertaken. Material and Service to be provided by contractor Tyre fenders-1 35 Nos
59 59 Fenders -Renewal of 20 mm galvanised chain as per sample Note : Vendor to clear QC checks from user manager prior fitment . Material and Service to be provided by contractor Tyre fenders-2 35 Rmtr
60 60 Fenders - Renewal of D shackle 20 mm as per sample (Note : Vendor to clear QC checks from user manager prior fitment). Material and Service to be provided by contractor Tyre fenders-3 45 Nos
61 61 Rubbing Stake - Wooden fenders (rubbing stake) damaged in port and Stbd side. Mat – Waterproof strong wooden logs. . To be renewed as per sample . Job involves removal of existing fenders and re-fitment of new fenders in ship side. Job involves renewal of Securing Fasteners (Mat – MS) and Material and Service to be provided by contractor Rubbing Stake 40 Mtr
62 62 Life Saving Appliance - Stretcher for life saving equipment damaged. To be renewed. Size - standard. Material and Service to be provided by contractor Stretcher 1 Nos
63 63 08 in nos lifebuoy stowing brackets to be renewed at various locations. Mat - MS.\nMaterial and Service to be provided by contractor Life saving applicences 8 Nos
64 64 Renewal of Life Saving Appliance - (a) Lifebuoy with self-igniting light and smoke signal (MOB marker) quick release type to be renewed on bridge deck (Qty 02) \n(b) Lifebuoy with life line (30m long) to be renewed on 01 deck (Qty 02) \n(c) Ordinary lifebuoy damaged. To be renewed on main deck (Qty 02) \n(d) Lifebuoy with self-igniting light and 30m buoyant life line to be renewed on 01 deck (Qty 02).\nMaterial and Service to be provided by contractor Lifebuoy 8 Nos
65 65 Renewal of Name Board\n Ships name box along with lighting arrangement defective. To be renewed as per sample. Mat - MS (qty 01).\nMaterial and Service to be provided by Contractor Misc fittings-5 1 Nos
66 66 Ships name board on Port and Stbd side to be renewed. Mat - Wood (qty 02) with name engraved by steel electroplating.\nMaterial and Service to be provided by Contractor Misc fittings-6 2 Nos
67 67 Renewal and fitment of Punka lowers damaged at various trunkings. Size – 6” . Material and Service to be provided by contractor Punka lowers 5 Nos
68 68 Wire mesh and ball valve of air vent on upper decks be replaced. Structural defects on air vents to be repaired. Paint to be restored post repairs and surface preparation of plate. Material and Service to be provided by contractor Air vent-1 15 Nos
69 69 Renewal of Window coaming around wheel house deck . Job involves welding and cutting assistance. Mat - MS. Qty - 30 Running Meter.\nMaterial and Service to be provided by contractor Window coaming 30 RMtr
70 70 Renewal of wire mesh of Natural air vent of all compartments ,corroded air vent , perished rubber beading of flaps . Hinges and butterfly nuts to be renewed. Material and Service to be provided by contractor Air vent-2 15 Nos
71 71 Renewal of Sounding point of tank threads worn out on both ends. Mat – Brass. Material and Service to be provided by contractor Sounding point 1 Nos
72 72 Renewal of Fire hose box along with securing brackets. Job involves welding, cutting and renewal of securing brackets including fitment. Material and Service to be provided by contractor . Fire hose box 10 Nos
73 73 01 cable reel broken. To be manufactured and replaced in situ. Job involves renewal of securing brackets, welding and cutting assistance and fitment. Material and Service to be provided by contractor Mooring rope reel 1 Nos
74 74 Renewal of Fiber canopy on foxle and quarter deck. Job involves complete renewal of stanchions (Mat - Stainless Steel), stanchion shoes, securing strips and installation with new fiber canopy 25 sqm). Material and Service to be provided by contractor Deck canopy 25 Sqm
75 75 Renewal of Platform for quarter deck bollard . Mat – Chequered Plate Thickness - 6 mm. Material and Service to be provided by contractor Wooden platform 3 Sqm
76 76 Renewal of Sea water pipe line for anchor chain cable. Mat – MS. Material and Service to be provided by contractor Sea water pipe line 6 Mtr
77 77 Renewal of Wooden foot step broken in wheel house entrance door.Material and Service to be provided by contractor Wooden Foot Step 1 Job
78 78 Manufacturing of Aluminium covers for 02 AC compressor unit on upper deck as per sample. Mat - Al plate. \nMaterial and Service to be provided by contractor Aluminum cover 2 Nos
79 79 MS strip (15 cm X 75 cm) on upper deck WT doors (Qty - 05) damaged/ corroded. To be manufactured and welded IN SITU. Material and Service to be provided by contractor Misc fittings-1 5 Nos
80 80 Renewal of weather deck locker. Job involves renewal of securing brackets and fitment. Material and Service to be provided by contractor Deck locker 1 Nos
81 81 Renewal of Engine room blower wire mesh and securing MS strips. Quote for Service and Material. Engine room blower 4 Nos
82 82 Renewal of Sunmica (Qty - 25 Sqm) of various places in accommodations .Quote for Service and Material. Furniture-1 25 Sq.m
83 83 Renewal of wooden beading (Qty - 30 mtr) of various places in accommodations and offices.. Quote for Service and Material. Furniture-2 30 Sq.m
84 84 Renewal of Canvas covers of following deck equipment -Windlass and control stand (02 Nos), rescue boat (02 Nos), search light (02 Nos), magnetic compass (02 Nos), capstan and capstan control (02 Nos), boat motor (02 Nos). Material and Service to be provided by contractor. Canvas covers 1 Job
85 85 Renewal of IMO stickers as per sample. Qty - 85 Nos. Material and Service to be provided by contractor Misc fittings-7 1 Job
86 86 Renewal of Fire extinguisher securing brackets. Job involves welding and cutting assistance including associated degutting of lagging, panelling,equipment and regutting affected due to hotwork. Qty – 10. Material and Service to be provided by contractor Misc fittings-8 10 Nos
87 87 Electroplating job to be undertaken on stainless steel fittings in galley and ships bell. Material and Service to be provided by contractor Misc fittings-9 1 Job
88 88 Manufacturing of OBM water tank as per sample. Job involves fitment, welding and cutting assistance. Mat- MS . Material and Service to be provided by contractor Misc fittings-10 1 Nos
89 89 Wall clock to be replaced at various location. Qty - 04. Material and Service to be provided by contractor Misc fittings-11 4 Nos
90 90 Port and Stbd Main engine, Wartsila, Model: 8L-26 (Running hour- Port: 2230, Stbd: 2210):- Carry out following routine/works: - (a) Renew fuel and lub oil filter. (b) Replace centrifugal filter will all seals. (c) Drain starting air vessels and air treatment units. (d) Serviceability checks of HT and LT cooling water pump. (e) Clean air compressor by water injection, inspect and clean turbocharger. (f) Change air filter to the turbo charger. (g) Check function of by-pass and waste gate assembly. (h) Lubricate fuel control mechanism linkage. (j) Carry out safety devices checks of both Main engines. Rectify defects, if any. (k) Check function of measuring devices and calibrate which are erratic. (l) Calibrate functioning of oil mist detector. (m) Check operation of turning gear and start inter lock device, repair/ calibrate. (n) Adjust Valve clearance. (p) Record and calibrate combustion pressure. (q) Inspect elastic engine mounting elements, renew if necessary. (r) Measure axial displacement and crankshaft deflection of crankshaft, rectify defect if not within limit. (s) Carry out alignment between engine and engine driven machinery. (t) Renew lubricating oil filter candles. (u) Calibrate functioning of cooling water venting system. (v) Inspect and clean charge air cooler air side. (w) Inspect filter/water separator control air, adjust/ repair if necessary. (x) Refresh actuator lubricating oil charge. (y) Make endoscopic inspection of valves, valve seats and running surface of cylinder liners, renew if defective. (z) Check function of valve rotators, repair if necessary. (aa) Inspect camshaft sections, repair defects. (ab) Inspect conical dealings and cavitation on inside of HP fuel pipes, renew if necessary. (ac) Overhaul air starting motor of both main engines. (ad) Inspect piston (without dismantling of piston rings), connecting rod, crankpin with bearing, cylinder liner, gudgeon pin and bearing. (ae) Inspect fuel injectors, renew nozzles and test. (af) Lub oil cooler of both Main engines to be dismantled, chemically cleaned and boxed back with new gaskets. System to be pressure tested and proved for operation post fitment of coolers. (ag) Carry out overhauling of Europa Actuator for satisfactory performance. (ah) Carry out SDC checks of both Main engine local control panel at wheel house control panel, rectify defects if any. Post completion of routine carry out safety device checks. Calibrate/renew defective safety devices and control cards. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. Port and Stbd Main engine, Wartsila, Model : 8L-26 2 Nos
91 91 Main Engine, Wartsila, Model : 8L-26 spares :- Filter Ring 1581022 2 Nos
92 92 Filter Cartridge 4701002 4 Nos
93 93 Spare Parts Kit 4701019 2 Nos
94 94 Filter Paper 4713047 1 Nos
95 95 O ring 4714046 4 Nos
96 96 O ring 4714048 4 Nos
97 97 O ring 4714047 4 Nos
98 98 O ring 4714090 4 Nos
99 99 O ring 4714045 72 Nos
100 100 Filter Cartridge 4714010 5 Nos
101 101 O ring 4714093 4 Nos
102 102 Gasket 4714098 4 Nos
103 103 Maintenance kit 9105002 4 Nos
104 104 Cylinder head gasket 1050004 4 Nos
105 105 Lub oil centrifugal filter body 4713115 4 Nos
106 106 Air starting motor repair kit PAAE090819 4 Nos
107 107 Port & Stbd Diesel Alternator, Make- Cummins {Model- 6CTA-8.3 D (M)}, (Running hour- Port: 2510, Stbd: 2625):- Carry out following routines/works on both DA :- (a) Remove injectors. Clean, inspect, repair & calibrate with new spares. (b) Remove fresh water heat exchanger. Clean & pressure test. (c) Remove turbocharger. Clean, inspect & repair with new repair kit (check turbocharger end play and radial clearance). (d) Tighten nut & cap screw of air inlet and exhaust system. (f) Replace belts for accessories. (g) Carry out tappet settings. (h) Flush cooling system. Run engine to bring it to operating temperature. Stop the engine reflush cooling system with potable water 2-3 times. Refill cooling system with coolant. (j) Carry out calibration of AVR, after calibration of AVR undertakes the voltage control test and paralleling trials. (k) Carry out calibration of over voltage protection unit (OVPU), reverse power relay and over speed trip. (l) Carry out SDC checks of both DA local control panel and wheel house display panel, rectify defects if any. (m) Post completion of routines, start the engine and check all gauges, replace if required, check for any oil/water leakage/exhaust leakage, rectify deefcts, stop the engine and recheck engine oil level, top up if require. (n) Carry out safety device checks, rectify defects if any. Post completion of routine and load trails, calibrate/ renew defective safety devices and control cards. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. Port and Stbd DA 2 Nos
108 108 Main Diesel Alternator, Model: 6 CTA 8.3 D/M (mandatory spares) :- Element lub oil filter 3401544 6 Nos
109 109 Element, Air cleaner 3814312 4 Nos
110 110 Element, Air cleaner 3814313 6 Nos
111 111 Filter, Fuel 3931063 8 Nos
112 112 Filter, Coolant 4104821 8 Nos
113 113 Inhibitor, corrosion 10 litres 4926654 4 Nos
114 114 Seal O-ring 3940386 4 Nos
115 115 Clip 500694 4 Nos
116 116 Hose, Plain 3970407 8 Nos
117 117 Clamp, T Bolt 5303620 16 Nos
118 118 Clamp, T Bolt 149437 12 Nos
119 119 Hose, Elbow 3815373 4 Nos
120 120 Hose, Plain 67185H 12 Nos
121 121 Clamp Hose 43828D 32 Nos
122 122 Hose Plain 169546 8 Nos
123 123 Cap filler 3902468 4 Nos
124 124 Seal rectangular ring 3902466 4 Nos
125 125 Seal, Rocker lever cover 3905449 4 Nos
126 126 Belt, V ribbed 3289124 4 Nos
127 127 Hose, Flexible AK4012SS 16 Nos
128 128 Hose, Flexible AK4015SS 4 Nos
129 129 Adaptor, Fuel connector 3815420 4 Nos
130 130 Seal, Banjo connector 4942278 24 Nos
131 131 Screw, RKR lever adjusting 3937438 24 Nos
132 132 Nut, Heavy hexagon 3927692 48 Nos
133 133 Gasket, Breather 3970886 4 Nos
134 134 Isolator, Noise 3930543 12 Nos
135 135 Clamp, V band 3905216 4 Nos
136 136 Aftercooler 5262314 1 Nos
137 137 Damper, Vibration 3925570 2 Nos
138 138 Support fan 5263529 2 Nos
139 139 Injector 3926787 3 Nos
140 140 Gasket, Hydraulic pump 3940245 2 Nos
141 141 Pump, Sea water 4963510 2 Nos
142 142 Pump, Water 3973114 2 Nos
143 143 Seal, O-ring 3902089 2 Nos
144 144 Tensioner Belt 3976831 2 Nos
145 145 Turbocharger 3595508 1 Nos
146 146 Control, Governor 3974704 1 Nos
147 147 Sensor, Temperature 4911877 2 Nos
148 148 Sensor, Pressure 4911882 2 Nos
149 149 Pick up, Magnetic 4912304 2 Nos
150 150 Transciever 4913256 2 Nos
151 151 Port and Stbd Voith Turbo Schneider, Model - 21 R 5/150-2 (Running Hour- Port: 2230, Stbd: 2210):- Carry out following routines/works: - (a) Renew the screw joint. (b) Check for the leakage from blade shaft sealing, rectify defect. (c) Check for the leakage from main seal, change seal if defective. (d) Check main gear teeth for any damage, repair it if damaged. (e) Check the input gear, repair it if damaged. (f) Check for the leakage from mounting gear, if any rectify leakage. (h) Check for leakage from the propeller well, if any rectify leakage. (j) Check for correct functioning of rotor space ventilation, repair if defective. (k) Renew corrosion protection. (l) Safety device checks to be undertaken on both Voith system. Calibrate all safety devices. (m) Following oil pressure sensor local display panel on both Voith not working, to be renewed: - (i) Lub oil pressure (ii) Control oil pressure (iii) Rotor oil pressure. (n) Carry out overhauling of both Voith Cooling pump. (p) Calibrate all temperature guages in the system. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service Port and Stbd Voith Turbo Schneider, Model - 21 R 5/150-2 2 Nos
152 152 Voith turbo Schneider propulsion, Type- VSP 28R5/234-2AE45 KW RPM (mandatory spares):- Shaft seal ring ADCK-300x340x16 (H01.067195) Voith -1 2 Nos
153 153 Round cord ring V-420x4.5NBR70 (H01.086366) Voith -2 10 Nos
154 154 O - ring 560x5 NBR70 (H01.032840) Voith -3 10 Nos
155 155 O- ring 454x8 NBR 70 (H01.064102) Voith -4 10 Nos
156 156 Bulb lamp 35x18.5-24V 5W (H01.095322) Voith -5 20 Nos
157 157 Filter element HYDAC 12782361300R020 (H01.016221) Voith -6 4 Nos
158 158 Repair kit (H01.012435) Voith -7 2 Nos
159 159 Lub oil pressure sensor Voith -8 2 Nos
160 160 Control oil pressure sensor Voith -9 2 Nos
161 161 Rotor oil pressure Voith -10 2 Nos
162 162 Bearing oil Temperature sensor Voith -11 2 Nos
163 163 Fuel and Lub oil centrifuge, Make-Alfa Laval PA 605:- Carry out following routines/works: - (a) Clean and inspect inlet and outlet pipe threads, paring disc, housings and frame hood. Renew defective parts. (b) Clean and inspect separator bowl, top disc, bowl discs, distributor, nozzles in bowl body, sliding bowl bottom, discharge mechanism, threads on bowl hood and bowl body, bowl spindle cone and bowl body nave, renew damaged/defective parts. (c) Clean and inspect oil mist fan, oil pump, water tank, bowl spindle, ball bearing housing, indentations and radial bobble of bowl spindle, renew damaged/defective parts. (d) Clean lub oil sump, fill sump with fresh oil. (e) Clean and inspect friction coupling, renew if defective. (f) Replace electric motor bearing. (g) Fuel leakage observed from fuel centrifuge drain line, Suspect control system malfunctioning, Defect to be rectified. (h) Carry out overhauling of Starting control panels. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. Alfa Laval PA 605 1 Nos
164 164 Alfa level fuel/ oil centrifuge:- Major Service kit Alfa level fuel oil centrifuge-1 1 Nos
165 165 Intermediate Service kit Alfa level fuel oil centrifuge-2 1 Nos
166 166 Ball bearing 2306M Alfa level fuel oil centrifuge-3 2 Nos
167 167 Ball bearing 6307 M/C3 Alfa level fuel oil centrifuge-4 2 Nos
168 168 OWS, Make-Suyash, Model-SD 0.15:- Carry out following routine/works: - (a) Replace Coalescer. (b) Replace adsorber elements. (c) Replace stuffing box packing. (d) Replace zinc anodes. (e) Renew lub oil of pump gear assembly. (f) Open the inspection port of the oil separator housing, the oil separator housing and the adsorber housing. Replace worn out parts. (h) Remove the sludge and clean container. (j) Check seal and piston valves, replace damaged seal and components. (k) Replace sensor electrode. (l) Carry out overhauling of Starting control panels. Post completion of routines, OWS to be started for satisfactory performance checks. Trials to be undertaken and system performance to be proved for Satisfactory.Quote for Service OWS, Make-Suyash, Model-SD 0.15 1 Nos
169 169 OWS, Make-Suyash, Modle-SD0.15:- Resilient stator for pump OWS-1 1 Nos
170 170 Helical rotor OWS-2 1 Nos
171 171 O-ring for pump OWS-3 2 Nos
172 172 Retaining ring OWS-4 2 Nos
173 173 Retaining color OWS-5 2 Nos
174 174 Drive pin OWS-6 2 Nos
175 175 V-belt OWS-7 1 Nos
176 176 Pressure guage OWS-8 3 Nos
177 177 Level sensing probe cassete OWS-9 3 Nos
178 178 Control PCB OWS-10 3 Nos
179 179 Interconnecting cable OWS-11 3 Nos
180 180 Pneumatic cylinder OWS-12 3 Nos
181 181 Pilot solenoid valve OWS-13 3 Nos
182 182 Copper tube OWS-14 1 Set
183 183 Auto air vent valve OWS-15 1 Nos
184 184 Manual air vent valve OWS-16 1 Nos
185 185 Coalescer filter OWS-17 1 Nos
186 186 Complete measuring cell OWS-18 1 Nos
187 187 PCB-BI OWS-19 1 Nos
188 188 PCB-C OWS-20 1 Nos
189 189 PBC-D OWS-21 1 Nos
190 190 PCB-G OWS-22 1 Nos
191 191 Max & Min Potentiometer OWS-23 2 Nos
192 192 Pressure relief valve OWS-24 1 Nos
193 193 Sampling cock OWS-25 3 Nos
194 194 Dry running protection unit OWS-26 1 Nos
195 195 Reciprocating Air Compressors, Make- Elgi (Model HP 10 300):- Carry out 1000 Hourly routines of both air compressors: - (a) Change oil and oil filter. (b) Minor air leakage in system, to be Rectify. (e) Adjust pressure setting of relief valve as per manual. (f) Change inlet air filter. (g) Clean breather valve. (h) Inspect all valves, renew if defective. (j) Calibrate non return valve. (k) Clean and inspect moisture trap, renew if required. (l) Carry out overhauling of Starting control panels. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. Reciprocating Air Compressor 2 Nos
196 196 Reciprocating Air Compressors, Make- Elgi (10 Model -HP 300):- Kit complete, Overhaul Air compressor 2 Nos
197 197 CO2 Fire Fighting System - Carry out following routines:- \n(a) Renew all flexible hoses (qty-10),\n(b) Overhaul non-return valves and safety stop valves,\n(c) Remove and inspect cylinder operating heads and bursting discs, test for correct functioning,\n(d) Undertake hydro pressure testing of all bottles at 1.5 times of working pressure (qty 06) and submit report.\n(e) Carry out weight test of all 06 CO2 cylinders and refill gas if required. System to be proved for satisfactory performance,\n(f) CO2 remote control panel limit switch not working. To be replaced (qty 02), Quote for Service and Material CO2 Firefighting system 1 Nos
198 198 Both Main engine Turbocharger outlet temperatures indicating beyond permissible limit/ malfunctioning. Suspected sensors faulty, to be renewed. Quote for Service and Material. Both Main engine-1 2 Job
199 199 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 100 mm). Quote for Service and Material. System pipelines-1 10 Mtr
200 200 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 80 mm). Quote for Service and Material. System pipelines-2 10 Mtr
201 201 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 65 mm). Quote for Service and Material. System pipelines-3 5 Mtr
202 202 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 125 mm). Quote for Service and Material. System pipelines-4 5 Mtr
203 203 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 100 mm). Quote for Service and Material. System pipelines-5 5 Mtr
204 204 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 65 mm). Quote for Service and Material. System pipelines-6 10 Mtr
205 205 System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 50 mm). Quote for Service and Material. System pipelines-7 10 Mtr
206 206 System Pipelines: - Renew with end fittings of Air Vent & Filling System (150mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-8 2 Mtr
207 207 System Pipelines: - Renew with end fittings of Air Vent & Filling System (100mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-9 2 Mtr
208 208 System Pipelines: - Renew with end fittings of Air Vent & Filling System (65mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-10 10 Mtr
209 209 System Pipelines: - Renew with end fittings of Air Vent & Filling System (50mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-11 2 Mtr
210 210 Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (300mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-12 5 Mtr
211 211 Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (100mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-13 5 Mtr
212 212 Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (80mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-14 5 Mtr
213 213 Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (65mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-15 10 Mtr
214 214 Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (45mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-16 10 Mtr
215 215 System Pipeline:- Renew with end fittings of Lub oil and Sanitary system (40mm) (Copper), pressure test to 1.5 times working pressure (kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-17 5 Mtr
216 216 System Pipeline:- Renew with end fittings of Lub oil and Sanitary system (32mm) (Copper), pressure test to 1.5 times working pressure (kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-18 5 Mtr
217 217 System Pipeline: - Renew with end fittings of Lub oil and Sanitary system (125mm) (Copper), pressure test to 1.5 times working pressure (kg/cm2), fit onboard and prove. Quote for Service and Material. System pipelines-19 7 Mtr
218 218 Valves:- Removal, overhauling, pressure testing and fitment of 65mm SDNR valves. Quote for Service and Material. System valves-1 2 Nos
219 219 Valves:- Removal, overhauling, pressure testing and fitment of 65mm SD valves. Quote for Service and Material. System valves-2 3 Nos
220 220 Valves:- Removal, overhauling, pressure testing and fitment of 80mm Gate valves. Quote for Service and Material. System valves-3 3 Nos
221 221 Valves:- Removal, overhauling, pressure testing and fitment of 80mm Globe valves. Quote for Service and Material. System valves-4 2 Nos
222 222 Valves:- Removal, overhauling, pressure testing and fitment of 125mm Storm valves. Quote for Service and Material. System valves-5 2 Nos
223 223 Valves:- Removal, overhauling, pressure testing and fitment of 150mm SDNR valves. Quote for Service and Material. System valves-6 3 Nos
224 224 Valves:- Removal, overhauling, pressure testing and fitment of 200mm Gate valves. Quote for Service and Material. System valves-7 2 Nos
225 225 Valves:- Removal, overhauling, pressure testing and fitment of 200mm Butterfly valves. Quote for Service and Material. System valves-8 2 Nos
226 226 Valves:- Removal, overhauling, pressure testing and fitment of 300mm Butterfly valves (Hydraulic valve). Quote for Service and Material. System valves-9 2 Nos
227 227 Valves:- Removal, overhauling, pressure testing and fitment of 100mm Gate valve. Quote for Service and Material. System valves-10 3 Nos
228 228 Valves:- Removal, overhauling, pressure testing and fitment of 400mm Globe valve. Quote for Service and Material. System valves-11 2 Nos
229 229 Valves:- Removal, overhauling, pressure testing and fitment of 40mm SD valve. Quote for Service and Material. System valves-12 3 Nos
230 230 Valves:- Removal, overhauling, pressure testing and fitment of 32mm SD valve. Quote for Service and Material. System valves-13 3 Nos
231 231 Valves:- Removal, overhauling, pressure testing and fitment of 65mm Storm valve. Quote for Service and Material. System valves-14 2 Nos
232 232 Valves:- Removal, overhauling, pressure testing and fitment of 80mm Storm valve. Quote for Service and Material. System valves-15 2 Nos
233 233 Valves:- Removal, overhauling, pressure testing and fitment of 125mm SDNR valve. Quote for Service and Material. System valves-16 2 Nos
234 234 Valves:- Removal, overhauling, pressure testing and fitment of 50mm Quick shut down valve. Quote for Service and Material. System valves-17 2 Nos
235 235 Valves:- Removal, overhauling, pressure testing and fitment of 50mm SDNR valve. Quote for Service and Material. System valves-18 2 Nos
236 236 Valves:- Removal, overhauling, pressure testing and fitment of 25mm Quick shut down valve. Quote for Service and Material. System valves-19 2 Nos
237 237 Renewal of hot lagging for DA and Main Engine exhaust system pipeline. Material- MWMB. Quote for Service and Material. Hot lagging 20 Sq m
238 238 Stbd Main engine idling RPM erratic. Suspected governor malfunctioning(Make- Europa). To be calibrated and proved for satisfactory performance. Quote for Service and Material. Both Main engine-2 1 Nos
239 239 Both Main engine starting air line water trap valves to be overhauled. Quote for Service and Material. Both Main engine-3 2 Nos
240 240 Remove, dismantle, chemically clean, assemble and pressure test upto required pressure with spares for the following:- (a) Fuel cooler of Main engine. (b) Both Alfa cooler to be dismantled in-situ, mechanically cleaned and boxed back with new gaskets. System to be pressure tested and proved for operation post fitment of coolers. Test pr- 3.5 kg/cm2. (c) Existing inlet and outlet pipe of both Alfa coolers to be replaced with Cu-Ni pipe. Length- 0.3 mtr, Mat- SS, Dia- 80 mm (d) Sea water inlet pressure gauge line adaptor of both Alfa cooler damaged, to be renewed. Quote for Service. Heat Echangers 1 Job
241 241 Stbd Main engine lub oil centrifugal filter body damaged. To be renewed. Quote for Service Stbd Main engine 1 Nos
242 242 (a) Both pre-heaters of Main engine to be dismantled, mechanically cleaned and boxed back. System to be pressure tested and proved for operation post fitment of pre-heater. Test pr- 3 kg/cm2.\n(b) Both pre- Heater circulating pumps along with motor to be overhauled.\nQuote for Service and Material. Pre-heater 1 Job
243 243 Exhaust leakage observed from Port Main engine and Stbd DA exhaust line flange. Suspected metallic gasket failure, to be renewed. Quote for Service and Material. Exhaust line flange 1 Job
244 244 Main engine and DA overhead tanks to be cleaned and paint to be restored as per paint scheme. Respective sight glass to be renewed. Quote for Service and Material. Expansion tank 4 Nos
245 245 Both Voith limit switches not working. Limit switches to be renewed. Qty- 04 Quote for Service and Material. Voith limit switch 1 Job
246 246 Hinges to be provided/ fabricated on chequred plates of engine room for operating system valves. Qty- 15. Quote for Service and Material. Chequred plates 1 Job
247 247 Sea water suction Strainers: - Renew following suction strainers as per sample: Main sea chest, Bilge suction and DA suction. Mat - SS. Qty- 08 Quote for Service and Material. Sea water suction strainers 8 Nos
248 248 Both Main engine Fly wheel safety guards damaged. Guards to be manufactured as per sample. Quote for Service and Material Safety Guards 1 Job
249 249 External Firefighting system, Make-Jason Engg, Model-SRU-C255 VK1.8 CCW-02:- Following works to be undertaken on both FIFI system (a) Both FIFI clutch lub oil cooler to be cleaned and pressure test to be carried out. Serviceability checks of system to be undertaken. Trials to be undertaken and system performance to be proved for satisfactory. (b) Actuator of nozzle of FIFI system on top of bridge not operating. Same to be renewed. Qty- 02 (c) Both FIFI clutch not engaging in remote mode. Defect rectification to be undertaken (d) Operating wheels of FIFI system valves damaged. Same to be renewed, Qty- 08. (e) Control panel at bridge and engine room operating erratically, control panel checks to be undertaken and defective components to be repaired. Quote for Service and Material. External Firefighting system 1 Job
250 250 Repair of hand pump fitted on foxle to be undertaken. Quote for Service and Material. Hand pump 1 Nos
251 251 Temperature thermometers of various system lines to be renewed as per sample. Qty- 04 Quote for Service and Material. Thermometer 4 Nos
252 252 Suction and discharge pressure gauges of various system lines to be renewed as per sample as given bellow :-( a) Range -1 to 2 bar. Qty-05 (Back mounted) (b) Range- 0 to 10 bar. Qty-08 (Back mounted) (c) Range-0 to 40 bar. Qty-03 (Back mounted). (d) Range-0 to 6 bar. Qty-06 (Vertical mounted). Quote for Service and Material. Pressure gauges 22 Nos
253 253 Overhauling of fire hydrants including coupling to be carried out, Qty -10. Quote for Service. Fire hydrants 10 Nos
254 254 Fire hydrant coupling Fire hydrant coupling 10 Nos
255 255 Both Alfa cooler sea water inlet gauge line adopter broken. Adopter to be renewed as per sample. Quote for Service and Material. Adapter 2 Nos
256 256 Air bottles (Capacity- 1000 ltrs) to be pressure tested up to 45 bar, Qty-02. Quote for Service and Material. Air bottles 2 Nos
257 257 Flap cover to be provided at DD compressor exhaust outlet. Quote for Service and Material. Flap cover 1 Nos
258 258 Air vent of dirty oil and sludge tank corroded. Air vent to be renew as per sample. Qty-02, Mat-MS. Quote for Service. Air vent-3 2 Nos
259 259 Lub oil transfer hose damaged, to be renewed. Dia- 1.5 inch, Mat- PVC, Length- 100 mtr. Quote for Material. Lub oil hose 100 Mtr
260 260 Main Switch board: Following works to be carried out: - (a) Undertake calibration of instrument panel/ meters fitted on MSB (Qty 16), (b) Replace bus bar insulators (Qty 06). Quote for Service. Main switch board( Marine Electricals) 1 Job
261 261 MSB, Starter panels & DBS. M/s Marine Electricals:-Under voltage relay 220V/240V (E/SC/02140) MSB, Starter panels & DBS. M/s Marine Electricals 2 Nos
262 262 Auxiliary contact rated 10A, 220V coil with 2NO+2NC (A/SC/13103) MSB, Starter panels -1 2 Nos
263 263 Push button (D/SC/00018) MSB, Starter panels -2 1 Nos
264 264 Indicator lamp LED white colour 230VAC (B/SC/00166) MSB, Starter panels -3 4 Nos
265 265 Indicator lamp LED green colour 230VAC (H/SC/00001) MSB, Starter panels -4 4 Nos
266 266 Indicator lamp LED red colour 230VAC (H/SC/00002) MSB, Starter panels -5 4 Nos
267 267 Indicator lamp LED blue colour 230VAC (H/SC/00003) MSB, Starter panels -6 4 Nos
268 268 AC voltmeter 0-500V RM at 415V(H/SC/00006) as per sample MSB, Starter panels -7 1 Nos
269 269 Ammeter 0-300/5A RM at 215A (G/RS/01852) as per sample MSB, Starter panels -8 1 Nos
270 270 Echo sounder (Koden) showing erratic reading. Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material. Echo sounder (Koden) 1 Job
271 271 VHF-2 power supply unit defective To be operationalised. Quote for Service and Material VHF 1 Nos
272 272 Search & Rescue Transponder (Model-SART-3, Make-Pathfinder, ACR Electronics) to be replaced. Qty- 02. Quote for Material SART(ACR) 2 Nos
273 273 EPIRB to be replaced. Make- Pathfinder, Mode-RLB 37, Qty- 01. Quote for Material EPIRB(ACR) 1 Nos
274 274 Navigation control panel not working on 24V DC supply. Carry out repair of the panel and prove system as per designed performance. Quote for Service. Navigation control panel(Marine Electricals) 1 Job
275 275 Navigation light panel:- Fault detection module card (U/VTV/000008) Navigation light panel-1 1 Nos
276 276 220V, 1000W GX9.5 Tungsten halogen bulb (RAY-SL-553-07) Navigation light panel-2 2 Nos
277 277 Portable day light signaling search light:- 24V 60W incandescent bulb with associated fittings Navigation light panel-3 4 Nos
278 278 Switch for lantern (RET-09/14) Navigation light panel-4 1 Nos
279 279 PA system amplifier unit defective. To be repaired. Quote for Service and Material. PA system( Hanshin electronics) 1 Nos
280 280 Emergency light (24VDC, 40W) at various locations not working, to be renewed. Quote for Service and Material Emergency lights( Ray Enterprises 20 Nos
281 281 Carry out overhauling of lighting transformer. Equipment to be restored to designed performance levels (7.5 KVA) Quote for Service and Material Transformers(7.5 KVA) 2 Nos
282 282 Carry out overhauling of following Pump motors and starters: - (a) Fresh water pump (2.2 KW, Qty-02) (b) Bilge ballast GS pump (11KW, Qty-01). Quote for Service and Material Motors & starters 1 Job
283 283 Navigational lights (230V 65W, 24V 40W) fitted at various locations defective, to be repaired. Job also involves renewal of securing brackets. Qty - 06. Quote for Service. Navigational lights (Marine Electricals) 1 Job
284 284 Navigation lights:- Bulb 2P8 230V/65W ( AI/000023 Navigation lights-1 6 Nos
285 285 Bulb 24V/40W (AI/000021) Navigation lights-2 6 Nos
286 286 Following test equipments to be renewed: - (a) EMC-01 (b) SPM meter – 01. Make- Fluke. (c) Temperature calibrator-01, Make- Nagman. (d) HP and LP calibrator- 01 (e ) Hydrolic Jaw puller kit- 01 (SKF- TMHP 10 E). (f) Mechanical Tool set(102 pcs)- 01, Make- Facom (Model- Jet S.M1204) (g) Feeler guage(0.05 mm to 1 mm)- 01, Make- Mitutoyo(184-304S) (h) Dial guage magnetic stand- 01, Make- Mitutoy(7011-10) (j) Dial Guage (0.01 mm to 10 mm)- 01, Make- Mitutoy(2046S). (k) Hydraulic Press Workshop type(Cap - 30 Tons) - 01, Make - Powerjac, Model - WTH- 30. Quote for Material. Test equipment 10 Nos
287 287 EM Log speed unit not operational. To be calibrated. Quote for Service and Material Speed Log 1 Nos
288 288 Split AC (Make - Voltas, Cap- 2 TR) fitted in wheel house and Split AC (Make - Voltas, Cap- 2 TR) fitted in MSB room observed to be malfunctioning and needs to be renewed. Quote for Service and Material AC-1 2 Nos
289 289 New Split AC (Make - Voltas, Cap- 1.5 TR) to be procured and to be fitted in Master cabin and ED cabin. Quote for Service and Material AC-2 2 Nos
290 290 Following batteries to be replaced (a) 12V, 120 AH . Quote for Material. Batteries-1 8 Nos
291 291 (b) 12V, 150 AH Batteries-2 12 Nos
292 292 (c) 12V, 180 AH Batteries-3 10 Nos
293 293 (d) 12V, 200 AH Batteries-4 4 Nos
294 294 (e) 12V, 7 AH Batteries-5 4 Nos
295 295 (a) Galley hot plate defective. To be repaired. Make-Kirst. \n(b) Submersible pump supply socket (415V 63A) damaged/defective. To be replaced. Quote for Service and Material Misc. 1 Job
296 296 Carry out overhauling of following Ventillation motors:- \n(a) Galley ventillation blowers, 0.37KW, Qty- 02 (b) Wheel house supply blower, 0.37 KW, Qty- 01 © E/R ventillation blowers, 11 KW, Qty- 02 (d) Voith room supply blower, 1.5 KW, Qty- 01 (e) Accomodation supply blower, 1.5 KW, Qty- 01 (f) CO2 cylinder room blower, 0.37 KW, Qty- 01 (g) Bathroom ventilation blower, 0.37 KW, Qty- 01\nQuote for Service and Material Ventillation motors 1 Job
297 297 Tank content gauges control panel (Nivo system) (Qty 02) observed to be defective. Functional checks of all gauges to be carried out. Defective components and sensors to be replaced. Tank level calibration to be undertaken. Serviceability checks and calibration of display module to be undertaken. Quote for Service. Tank content gauge( Nivo control) 1 Job
298 298 Tank level indication:- Diaphragm level sensor (HPLI060-3F3GAEZ-AZ) Tank level indication-1 2 Nos
299 299 Tank level indication:- Diaphragm level sensor (EN4068B-913043-100) Tank level indication-2 2 Nos
300 300 RDA 860 PCB set consists of - power supply PCB, digital PCB, display PCB (EN4068B-963752-000, EN4068B-963751-000, EN4068B-963755-000) Tank level indication-3 2 Set
301 301 Sensor gasket (EN4068B-524246-000) Tank level indication-4 2 Nos
302 302 Tube light (40W) fitted onboard at various locations to be replaced with LED (15W) tube lights. Job also involves renewal of securing brackets at 10 locations. Quote for Services and Material LED light (Ray enterprises 30 Nos
303 303 Tube light (25W) fitted in engine room defective. All lights to be replaced with LED (15W) tube light. Job also involves renewal of securing brackets at 08 locations. Quote for Services and Material LED light 40 Nos
304 304 Magnetic compass fitting (reflector type) in wheel house damaged. Fitting to be renewed. Magnetic compas to be calibrated and proved for satisfactory performance. Quote for Service and Material Magnetic Compass 1 Nos
305 305 Automatic Identification System (AIS) - Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material AIS 1 Nos
306 306 Air Whistle not working. To be operationalised. Quote for Service and Material Air whistle 2 Nos
307 307 E/R Alarm panel display in wheel house not working. To be operationalised. Quote for Service General calling alarm(L&T) 1 Nos
308 308 Alarm Monitoring System:- Indicating lamp (SPE0052500055) Alarm monitoring system-1 2 Nos
309 309 Digital IP module (IPMS101102G01) Alarm monitoring system-2 1 Nos
310 310 Power supply module (IPMS101102P01) Alarm monitoring system-3 1 Nos
311 311 Inter posing relay (IPMS105100R01) Alarm monitoring system-4 1 Nos
312 312 2P, 2A, 24V DC MCB (SPE0053400589) Alarm monitoring system-5 4 Nos
313 313 Trans Rectifier Unit to be upgraded to latest version. Make- M/s L&T. Quote for Service and Material TRU(3KW) 1 Nos
314 314 SPT fitted onboard at various locations found defective. To be operationalised. Qty- 07. Quote for Service and Material SPT (Gitesse) 1 Job
315 315 Sound Power Telephone System:- Microphone(IMCOS 9022/MIC) SPT system 5 Nos
316 316 Window Wiper rubber beading damaged. Window wipers to be renewed. Quote for Service and Matrial Window wiper 4 Nos
317 317 Shore supply connection box damaged. To be renewed. Job involves renewal of securing brackets and fitment. Quote for Service and Material Shore Supply connection box 1 Job
318 318 Flood lights and Search light not working. To be replaced. Job involves renewal of securing bracket and fitment. Quote for Service. Search light (Ray Entep) 10 Nos
319 319 Flood lights: Glasses for 200W/250V flood lights Flood lights & Search Light-1 5 Nos
320 320 200W Bulb, 250V Flood lights & Search Light-2 5 Nos
321 321 Lamp holders for WT flood light as per sample Flood lights & Search Light-3 10 Nos
322 322 Flood lights: Glasses for 1000W/250V flood lights as per sample Flood lights & Search Light-4 5 Nos
323 323 1000W Bulb, 250V as per sample Flood lights & Search Light-5 5 Nos
324 324 Remote switch (415V, 25A) of wheel house supply fan, galley supply fan, galley exhaust fan and engine room emergency stop damaged, to be replaced. Quote for Service and Material Switch 5 Nos
325 325 Deck lights (60W) and Deck lights guard/ fitting are broken. To be replaced as per sample. Job involves renewal of securing arrangement and fitment. Quote for Service and Material Deck lights 25 Nos
326 326 Wall mounted fans (230V) defective. To be replaced as per sample. Make -Orient. Quote for Service and Material Fans 15 Nos
327 327 Water tight rotary switch (230V 15A, Qty.-04), Emergency stop switch (415V, 25A, Qty-05), Lighting switch (230V 15A, Qty-20) and Lighting sockets (230V 15A, Qty-20) are broken at various locations. To be replaced. Quote for Service and Material Switch and Socket 49 Nos
328 328 Following domestic equipment to be renewed: - (a) Hot water boiler (Make- Blue star, 20 Ltrs) (b) RO Purifier (Make- Kent. Model no-Kent grand, 20 Ltrs) (c) Refrigerator (210 Ltrs) (e) Water cooler (Make- Blue star. Model No-SDLX480, capacity - 40 Ltrs). Quote for Material Domestic equipment 1 Each
329 329 Bunk light 230V 5W in crew cabin defective. To be replaced. Quote for Service and Material Bunk light 12 Nos
330 330 Calibration of AFDS sensors(08 nos)/system to be undertaken and defective sensors to be renewed. Serviceability checks of AFDS system to be undertaken. System to be proved for satisfactory performance. Quote for Service and Material AFDS 1 Job
331 331 Carryout overhauling of following battery charger:-\n(a) DA Battery charger 0.5KW, 02 in no.\n(b) ME Battery charger 2KW, 02 in no.\n(c) GMDSS Battery charger 24V 30A, 01 in no.\nQuote for Service and Material Battery charger 1 Job
332 332 Shore supply cable 35 sqmm 3 core Cable 100 mtr
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail