Indian Navy-IN has published Tender For Short Refit Of 50T Tug Himmat-Marine Services . Submission Date for this Tender is 18-07-2020. Marine Work Tenders in Naval Ship Repair Yard Karwar Karnataka. Bidders can get complete Tender details and download the document.
Name of Work: SHORT REFIT WORK PACKAGE - 50T TUG HIMMAT | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Erection of fixed staging/scaffolding in way of steel renewal work(Based on Volume Basis, LXBXH). Staging material to be provided by Contractor | GS1 | 450 | Cu.m |
2 | 2 | Provision of Fire sentry for minimum 05 hot work locations /day Note:- Fire sentries with adequate knowledge of fire and safety procedures for all hot work locations will need to be provided i.a.w NO 09/12. Sentries are to be in possession of required type of fire extinguishers in appropriate quantity. All sorts of fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/ incident. | GS2 | 300 | Mandays |
3 | 3 | Cleaning and Gas free certification of Fuel / Oil Tanks, Water ballast Tank, Fresh Water Tank . Quote for Service. (774 Sq.m). Material and Service to be provided by contractor | GS3 | 7 | Nos |
4 | 4 | Pressure Testing of Underwater tanks/void spaces/cofferdams. Including repairs/blanking of manhole covers( with new rubber gaskets/studs/bolts/as required) and defect rectification of all structural leaks i.a.w NO. 01/15. Material and spares to be provided by contractor.Ballast Tank (Qty 03), Fuel Tank (Qty 05), FW Tank (Qty 02), Misc Tank (Qty 04). Material and Service to be provided by contractor | Pressure Testing of Tanks | 14 | Nos |
5 | 5 | Bollard and Fairlead - Surface preparation by hydrojet blasting up to bare metal to WJ 2 Standard. Repairs to be undertaken as per hull survey report of bollards / fairleads and stiffening members in the vicinity. Bollard (Qty 13), Fairleads/ mooring pipes (Qty 10). Note:- After hydrojet blasting, primer application to be undertaken to prevent flash rusting the same is to be put up for inspection prior to repair / renewal or painting to refit monitoring team. Inspection to be cleared post repairs by NSRY/ QC Team.\nMaterial and spares to be provided by contractor | Hull Survey | 15 | Sq.m |
6 | 6 | Renewal of sea tube/Sea chests. (Including DPT of weld seam) i.a.w NES 155, NES 706. Material and Service to be provided by contractor | Sea Tubes-1 | 3 | Nos |
7 | 7 | Pressure testing of sea tube to 0.2 Bar upto 10 mins i.a.w NO 01/15. Material and Service to be provided by contractor | Sea Tubes-2 | 3 | Nos |
8 | 8 | Underwater Plating - \n(a) Remove marine fouling and old paint to bare metal from hull using hydrojet blasting to WJ 2 standard.\n(b) Paint scheme on full underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area is to be restored.\n(c) Application of paint on underwater hull and boot top area to be carried out post WJ 2 standard.\n(d) Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint. (i) Forward (ii) Midship, (iii) Aft. Renew defective draught marks. \nNote-: Navy approved paint scheme Akzonobel to be applied. Painting to be carried out as per NO 53/16.\nMaterial and spares to be provided by contractor | Under water plating | 600 | Sqm |
9 | 9 | Above Water Area, Weather Deck Area and Masts \nCarry out surface preparation by hydro jet blasting up to bare metal to WJ 2 standard. Defects to be rectified as per hull survey report. Carry out painting of above water area with high performance advanced hybrid coating system as per navy approved paint scheme Akzo Nobel mentioned below and weather deck area to be painted with high performance non- skid coating system as per navy approved paint scheme Akzo Nobel mentioned below. \n(a) Paint scheme for above water area (ship side, Mast, deck & super structure including bridge) (Area - 545 sqm):- (i) 02 coats of primer to achieve 80 microns DFT (ii) 02 coats of RAL 7040 colour specification to achieve 80 microns thickness (iii) Total DFT 320 microns. \n(b) Paint scheme of weather deck area (upper deck, funnel deck and bridge top deck) (Area – 385 Sq m):- (i) 01 coat primer coat - DFT 50 microns, (ii) 01coat anti corrosive intermediate coat - DFT 200 microns, (iii) 01 coat nonskid top coat - DFT 800 microns, (iv)Total DFT - 1050 microns. \nNote:- Painting to be carried out as per NO 53/16. Mast to be rigged up and proved post painting .\nMaterial and Service to be provided by contractor. | Above Water Area, Weather Deck Area and Funnel Area including Masts | 930 | Sq m |
10 | 10 | Funnel - Carry out surface preparation by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint of surroundings structure, funnel structure. Heat resistant paint on funnel to be applied as per navy approved paint scheme RAL 9011(black) and/or RAL 9010 (White) And/or IS 5/ 358 (Buff colour) as per NO 53/ 16. Material and Service to be provided by contractor | Funnel | 100 | Sq.m |
11 | 11 | Machinery Spaces - Clean all bilges, machinery foundation and surface preparation as per ST 3 standard and painting of the entire area. Clean all limber holes and drain holes. Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paint to be provided by Firm.\nMaterial and Service to be provided by contractor \nNote: - Equipments to be preserved/ covered prior power tooling. | Machinery spaces-1 | 757 | Sq m |
12 | 12 | Machinery Vibration Mounts - Manually clean and apply Nicole lacquer on the vibration mounts of all equipment. Material to be provided by refitting firm. 25% of the total mounts are to be replaced post undertaking grouping of mounts based on SPM Checks. To be paid on actuals. \nMaterial and Service to be provided by contractor | Machinery spaces-2 | 32 | Nos |
13 | 13 | Lagging \nRenew damaged / perished lagging at various places using pin method. Renew / restore in case of existing areas, paint scheme of affected areas before renewal of lagging. Material to be provided by refitting firm.\nMaterial and service to be provided by contractor | Machinery spaces-3 | 180 | Sqm |
14 | 14 | Cathodic Protection Sacrificial Anodes - Renew sacrificial anodes (Mk II & Mk III) fitted to underwater hull, stern tubes, inlets and outlets, sea chest, bilges and coffer dams based on survey report. Renew those consumed more than 25 % or more as per survey report. Clean remaining sacrificial anodes with steel wire brush. Quality certificate of the Anode to be provided for newly fitted anodes prior fitment. To be paid on actual. \nMaterial and service to be provided by contractor | Cathodic protection sacrificial anodes | 54 | Nos |
15 | 15 | Steel Renewal of structural plates (with Stiffeners) of deck and bulkheads including tank tops (including degutting of lagging, perforated paneling, cabling assiciated equipment minor eqpts., brackets, wooden fittings, machinery / equipment, switchboard / control panels, electronic and communication equipment, all light fittings, pipe lines, valves, electrical cables, junction boxes, obstructions, protrusions, foundation etc. etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting) of thickness as specified below with testing of weld joints by DPT. Steel plates supplied by Yard. All consumables material supplied by contractor. | Steel renewal | 1000 | Kgs |
16 | 16 | Renewal of wooden furniture. Table with 4 drawer (Qty 02) (1000x600x750H), Notice board (Qty 02) (300x50x400H), Towel hanging arrangements (Qty 05). Mat - Wood\nMaterial and service to be provided by contractor | Accommodation and offices-1 | 1 | Job |
17 | 17 | Renewal of Furniture-\nAccommodation and Offices - Renewal of Center Table (Wooden) (Qty 01) (850x500x450h). Material and service to be provided by contractor | Accommodation and offices-2 | 1 | Nos |
18 | 18 | Repair of locking arrangement of lockers and cupboards in cabins and wheel house. Material and service to be provided by contractor | Accommodation and offices-3 | 55 | Nos |
19 | 19 | Renewal of Plywood at lockers, cupboards and other wooden furniture in various offices and accommodations . Material and spares to be provided by contractor | Accommodation and offices-4 | 30 | Sq.m |
20 | 20 | Repair of Bunk lockers as per sample. (Qty 05). Mat - Wood. Material and service to be provided by contractor | Accommodation and offices-5 | 1 | Job |
21 | 21 | Renewal of Sofa with table (qty 01) (5 men sofa) as per sample. Material and service to be provided by contractor | Accommodation and offices-6 | 1 | Nos |
22 | 22 | Renewal of mattress with cover and their securing arrangements. Single type mattress. Thickness - 6" as per sample.\nMaterial and service to be provided by contractor | Accommodation and offices-7 | 12 | Nos |
23 | 23 | Renewal of Chairs in dining hall, master cabin, ED cabin as per sample. Dinning chair (Qty 06), Executive chairs (Qty 04), Revolving chair (Qty 02), Wheel House Chair (Qty 02), Engine Room Chair (Qty 01).Material to be provided by contractor | Misc fittings-12 | 1 | Job |
24 | 24 | Removal of old damaged deck covering to be undertaken. Surface preparation post renewal to be carried out for hull survey. Defects to be rectified as per survey report of yard. Deck covering to be renewed post application of primer on deck. (Mfd – M/s Macrotech). Material and spares to be provided by contractor | Macrotech | 40 | Sqm |
25 | 25 | Anchor, Chain Cable and Cable Locker - Lay out Anchor and chain cables and carry out surface preparation up to bare metal for survey. Repairs to be under taken as per hull survey report. Undertake survey of cable and shackles.Dismantle anchor and chain cable , clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear. Re-mark cable length. Examine hull associated fittings. Clean and grease trunion pin and housing. Grease to be used:- LG-280 Patt No 0474/910-0502. The machined surface of the joints of lugless joining shackles are to be examined for corrosion. All such shackles are to be stripped, greased and re-assembled. Anchor, chain cable and cable locker to be painted as per existing paint scheme. Paint to be provided by refittng firm. (Qty: Anchor - 02, chain length- 275 mtr, Swivel piece - 04, Lug less Joining shackles - 16, D Shackles - 04). Material and service to be provided by contractor. | Anchor, chain cable and cable locker | 1 | Job |
26 | 26 | Overhauling-\nCapstan (Mfd- Geeta Eng. Works) - Following work to be carried out:-\n(a) Overhauling of capstan along with motor assembly and changing of oil. Equipment to be proved for satisfactory operation. Undertake weather proofing of motor terminal box.\n(b) Renew all high speed bearings. \n(c) Blow out all motor windings thoroughly with clean dry air.\n(d) Clean and thereafter varnish dirty and oily windings. \n(e) Motor to be overhauled, with both bearings renewed & tested onboard on load (subject to QC checks).\n(f) Overhauling of brake mechanism to be carried out.\n(f) Inspect and overhaul the control panel and renew defective components and cabling.\n(g) System to be proved for designed operation and load trials to be offered. \nMaterial and Service to be provided by Contractor | Mfd- Geeta Eng. Works-1 | 1 | Job |
27 | 27 | Overhauling-\nAnchor Winlass (Mfd- Geeta Eng. Works) - Following work to be carried out:-\n(a) Overhauling of anchor winch along with motor assembly, rollers and anchor windlass and accessories. Changing of oil and insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. Undertake survey of structure post load testing. Structural defects to be rectified, if any.\n(b) Renew all high speed bearings (6208.2zr).\n(c) Blow out all motor windings thoroughly with clean dry air.\n(d) Clean and varnish dirty and oily windings.\n(e) Motor to be overhauled, both bearing to be renewed & tested onboard on load (subject to QC checks).\n(f) Overhaul brake mechanism.\n(g) Overhaul the control panel, and renew defective components and cabling.\n(h) Load test details to be furnished. Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs.\n(j) System to be proved for designed operation and load trials to be offered. (k) Carry out surface prepaeation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Material and Service to be provided by Contractor | Mfd- Geeta Eng. Works-2 | 1 | Job |
28 | 28 | Overhauling of mushroom head with spindle and valves to be undertaken. Wire mesh to be renewed. Material and service to be provided by contractor | Mushroom head | 7 | Nos |
29 | 29 | Overhauling\nSewage treatment plant Mfd- M/s EVAC OY (N40CE) - Undertake following routines: \n(a) Functioning of level switches of V-1 tank. Carryout de-sludging of V-2 tank by back flushing line. Clean the seawater ‘y’ type strainer at the inlet to bookcell. Lub oil to be renewed. Clean air supply filter / regulator element in solvent. Drain, inspect & clean the ‘bookcell’. Remove large deposits of hard material with diluted hydrochloric acid. Post completion of routines, operate system and inspect for leaks and proper cell amperage. \n(b) Inspect the tightness of belt and check leakage from gland of discharge pump. Repack the gland (if required). \n(c) Carry out following on Macerator pump:- \n(i) Check to ensure there are no leakages from the main seals. Renew drive end bearing and seals. \n(ii) Ensure impeller is free for rotation with no vibration. \n(iii) Ensure overload units operating correctly. \n(iv) Remove drain plugs provided at each end of the bracket of the electric motor and allow any accumulated moisture to drain away. Replace damaged plugs. \n(d) Clean and lubricate all plug cock valves. Lubricate valves in fully opened or fully closed position only. \n(e) Post repairs, STP to be proved for operation as per designed parameters.\n(f) Undertake effluent test from NABL accredited lab and check compliance to MARPOL norms.\n(g) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of marpol 73/78.\n(h) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate.\nMaterial and service to be provided by contractor | Mfd- M/s EVAC OY (N40CE) | 1 | Job |
30 | 30 | Ventilation Blowers - Renew perished / damaged trunkings as fitted onboard including wire mesh / lourers, rubber beadings, gaskets, fasteners, ventilation flaps and earthing strips on upper deck and mess. Paint to be restored post repairs as per existing paint scheme. To be paid on actuals. \nMaterial and Service to be provided by contractor | Ventilation system-1 | 80 | Sqm |
31 | 31 | Renew Grease filters inside exhaust trunking in galleys, Qty- 02. Material and Service to be provided by contractor | Ventilation system-2 | 2 | Nos |
32 | 32 | Renewal of Ventilation flaps of broken wire mesh broken, corroded air vent , perished flaps rubber beading along with renewal of Hinges and butterfly nuts . Mat - MS. Material and Service to be provided by contractor | Ventilation flaps | 16 | Nos |
33 | 33 | Renewal of Life raft stowing brackets, HRG, launching arrangement along with rubber padding. Job involves renewal of life raft securing straps with end fittings, slips, shackles, and rubber padding. Operationalise of launching mechanism to be proved in presence of user department. Material and Service to be provided by contractor | Life raft | 1 | Job |
34 | 34 | Ladders - Carry out mechanical surface preparation of all ladders up to bare metal. Repairs to be under taken as per hull survey report of ladders with associated footsteps. Damaged area to be renewed. Paint to be restored as per existing paint scheme. \nMaterial and Service to be provided by contractor | Ladders | 8 | Nos |
35 | 35 | Renewal of Footsteps at various places as per sample. Mat-MS .Material and Service to be provided by contractor | Misc fittings-2 | 1 | Job |
36 | 36 | Overhauling\nSingle arm boat davit Mfd - Hemant Engineering Pvt Ltd- (a) Overhauling of boat davit, gear box along with motor assembly and cut off switches. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. During trials motor parameters are to recorded and same to be cleared by qc. Offer for trials to ss post completion. \n(b) Survey wire rope, spare gear and other associated lifting gears. Renew as necessary.\n(c) Carry out load testing with davit fully rigged up. After completion of load test. Examine the complete davit structure and associated lifting gears for flaws, distortion, defecation etc. Flaws must be examined, carry out repairs if necessary and retest.\n(d) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint post surface preparation.\n(e) System to be proved for designed operation and load trials to be offered. \nMaterial and Service to be provided by contractor | Single arm boat davit | 1 | Job |
37 | 37 | Overhauling\n4.7 Mtr RIB Mfd - M/s Poly Glass Fibre Industries - Operanlised the RIB. Carry out following: - \n(a) Repair of hull structure to be carried out. Boat collar to be renewed. Job involves removal of existing damaged collar and fitment of new boat collar. Trials to be carried out along with weighing of boat with accessories post repairs. Test certificate to be provided.\n(b) Overhauling of motor boat engine including calibration of injectors.\n(c) Starting battery to be renewed(12V, 96AH) (Qty - 02).\n(d) Renewal of all defective electrical cables and wirings (2.5 sq. Mm, 2 core, 10 mtr).\n(e) All instrumentation gauges/ meters to be renewed including instrumentation panel. \n(f) Boat chocks and cushion of sitting arrangement of rescue boat, to be repaired.\n(g) Boat securing strap (gripes) to be renewed along with end fittings. Mat - polyester.\n(h) 02 in Nos oars and boat hook for rescue boat damaged / broken. To be renewed. \n(j) Renew polyester webbing boat sling for lowering and hoisting purpose. SWL 3.5 ton. Load test certificate to be provided. \nBoat trials to be conducted and proved for satisfactory performance. Material and Service to be provided by contractor | 4.7 Mtr RIB | 1 | Job |
38 | 38 | Overhauling \nSanitary System -Operationlised complete sanitary system. (a) Strip, clean and overhaul WC and urinal flushing valves, reducing valves and reducer (Qty 08).(b) Strip and clean sanitary system drain pipes. Re-galvanize where required (Length - 24 m).(c) Following accessories in the WC and bathroom to be renewed:- (a) Shower - 05, (b) Wash basin tap - 05, (c) commode seat cover - 03, (d) Commode flush knobs - 04, (e) Wash Basin drain pipe - 08, (f) Urinal with associated fittings - 02 . Material and Service to be provided by contractor | Sanitary system | 1 | Job |
39 | 39 | Domestic fresh water system - Strip, clean and overhaul domestic fresh water system valves in WCs and bathrooms. Stop cock (qty 05), basin beep cock (pillar) (Qty 04) and sink beep cock (pillar) (qty 01). Material - Brass (chrome plated). \nMaterial and Sevice to be provided by contractor | Domestic fresh water system | 1 | Job |
40 | 40 | Overhauling of Towing hook with quick release mechanism, Mfd- M/s Nautiluis Eng & Construction Company - Carry out load testing of towing hook and undertake repairs. Job involves serviceability of release line and repairs. Load test certificate to be provided. Material and spares to be provided by contractor | Towing hook | 1 | Job |
41 | 41 | Doors-Water Tight - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repair clips, hinges for looseness and wedge pieces for signs of wear and tear. Examine leather washers, toridal sealing rings and rubber sealing. Renew worn out parts and rubber beading. Carry out chalk test of all W/T doors. Paint to be restored as per existing paint scheme. (Qty - 12). Material and Service to be provided by contractor | NCD 1447 Issue 2, NES 155, NES 707 | 1 | Job |
42 | 42 | Non water tight doors - Repair 05 in nos NWT doors hinges and deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, hydraulic door closing mechanism and rubber beading and removal & fitment, repairs to coaming of door, structural coaming, frames). (Qty - 20). Material and Service to be provided by contractor | NCD 1447 Issue 2, NES 155, NES 708-1 | 1 | Job |
43 | 43 | WT Hatch - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repairs and overhauling of WT Hatches. (Including surface preparation of hatch body and primer application, repairs to Coaming of hatches, Structural coaming, frames and straightening of bent hatches by removal & fitment, replacement of locks, auto locks, hinge pins, hinge assembly, rubber beading and removal & fitment).Carry out chalk test post repairs and renew worn out parts as necessary. (Qty - 04) \nMaterial and Service to be provided by contractor | NCD 1447 Issue 2, NES 155, NES 708-2 | 1 | Job |
44 | 44 | Manhole- Renewal of rubber beading of manholes. (Qty -14). Material and Service to be provided by contractor | NCD 1447 Issue 2, NES 155, NES 710 | 1 | Job |
45 | 45 | Scuttles - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardent cloth. Scuttles - 18 . Material to be provided by refitting firm. | NCD 1447 Issue 2, NES 155, NES 711 | 1 | Job |
46 | 46 | Windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardent cloth. Windows - 20. Material to be provided by refitting firm. | Scuttles & Windows-1 | 1 | Job |
47 | 47 | Internal super structure and compartments - Repair works to be undertaken on hull structure including bulkhead and fittings as per survey report of various compartments on upperdeck and below decks. Painting to be undertaken post repairs as per existing paint scheme. Quote for service and material. | Scuttles & Windows-2 | 130 | Sqm |
48 | 48 | Air line on main deck corroded / broken at various locations. To be renewed in-situ. Job involves welding and cutting assistance. Mat - MS.\nMaterial and service to be provided by contractor | Guardrails and stanchions | 50 | RMT |
49 | 49 | Fender - Portable cylindrical rubber pneumatic fender damaged. To be renewed. Rubber Mat - EBDM/ NBR Dimension - 900X250 MM. Quote for Material. | Feed water tank | 4 | Nos |
50 | 50 | 9 Mtr aluminum gangway damaged / broken. To be replaced as per existing gangways. Mat - Al, length - 09m. Material and Service to be provided by contractor | Water Ballast Tank and Fresh Water Tank | 1 | Nos |
51 | 51 | Steel Renewal of A/W Structural plates along with Stiffeners of Deck and bulkheads and ship side (including degutting of lagging, perforated paneling, cabling associated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting)and thickness as specified below:Material grades: DMR 249A, DMR249B, D 40S, MS, B Quality steel.Standard : NES 155, NES 706. Steel plates supplied by yard and Welding Consumables to be supplied by contractor. Payment on actuals. | Misc structure-1 | 2000 | Kgs |
52 | 52 | Fabrication and fitment of minor and major foundations (including degutting of lagging, perforated paneling, cabling assiciated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting).Standard : NES 155, NES 706(Steel supply by yard and weld consumables by Contractor) | Misc structure-2 | 200 | Kgs |
53 | 53 | Repair & refitment of panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor | Misc fittings-3 | 50 | Sqm |
54 | 54 | Fabrication & fitment of new panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor | Misc fittings-4 | 50 | Sqm |
55 | 55 | Paint Scheme renewal \nWater Ballast Tank and Fresh water tank - Carry out surface preparation to ST 3 standards, Repair plating, structures and fittings of tank as per survey report. Thereafter Paint to be restored as per existing paint scheme for the following tanks:- \n(a) Water Ballast Tanks – 340 Sqm \n(b) Fresh Water Tanks – 297 Sqm. \nMaterial and Service to be provided by contractor | Water Ballast Tank | 637 | Sqm |
56 | 56 | Fender - (a) Renewal of D-Type rubber fenders on all around of yard craft . Fenders to be renewed as per existing fitted sample. Length- 40 mtr; Thickness – 5.5 inch \n(b) securing fasteners (Mat - MS) for fenders to be manufactured as per sample and fitted back. New fenders to be provided by firm. Type – Heavy duty D-type rubber fender; Mat of rubber - EBDM/ NBR/ Natural rubber. \nMaterial and spares to be provided by contractor | D type -Fenders | 40 | RMtr |
57 | 57 | Fender -Tyre fenders of barge found damaged. Renewal of tyre fenders (Air craft old tyres) (Qty- 43) (Aircraft tyres with outer dia 90 cm) to be carried out. ( Note : Vendor to clear QC checks from user manager prior fitment). Hot work required for removal and fitment of tyre fenders including degutting of lagging,panelling, cabling equipment affected by hotwork and regutting to be undertaken. New heavy duty tyre fenders and associated fittings to be provided by firm. \nMaterial and Service to be provided by contractor | Tyre fenders and associated accessories | 25 | Nos |
58 | 58 | Fenders - Renewal of eye pads associated with rubber fenders as per sample . ( Note : Vendor to clear QC checks from user manager prior fitment) . Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders.Degutting and regutting of lagging,panelling,cabling,equipment affected by hotwork to be undertaken. Material and Service to be provided by contractor | Tyre fenders-1 | 35 | Nos |
59 | 59 | Fenders -Renewal of 20 mm galvanised chain as per sample Note : Vendor to clear QC checks from user manager prior fitment . Material and Service to be provided by contractor | Tyre fenders-2 | 35 | Rmtr |
60 | 60 | Fenders - Renewal of D shackle 20 mm as per sample (Note : Vendor to clear QC checks from user manager prior fitment). Material and Service to be provided by contractor | Tyre fenders-3 | 45 | Nos |
61 | 61 | Rubbing Stake - Wooden fenders (rubbing stake) damaged in port and Stbd side. Mat – Waterproof strong wooden logs. . To be renewed as per sample . Job involves removal of existing fenders and re-fitment of new fenders in ship side. Job involves renewal of Securing Fasteners (Mat – MS) and Material and Service to be provided by contractor | Rubbing Stake | 40 | Mtr |
62 | 62 | Life Saving Appliance - Stretcher for life saving equipment damaged. To be renewed. Size - standard. Material and Service to be provided by contractor | Stretcher | 1 | Nos |
63 | 63 | 08 in nos lifebuoy stowing brackets to be renewed at various locations. Mat - MS.\nMaterial and Service to be provided by contractor | Life saving applicences | 8 | Nos |
64 | 64 | Renewal of Life Saving Appliance - (a) Lifebuoy with self-igniting light and smoke signal (MOB marker) quick release type to be renewed on bridge deck (Qty 02) \n(b) Lifebuoy with life line (30m long) to be renewed on 01 deck (Qty 02) \n(c) Ordinary lifebuoy damaged. To be renewed on main deck (Qty 02) \n(d) Lifebuoy with self-igniting light and 30m buoyant life line to be renewed on 01 deck (Qty 02).\nMaterial and Service to be provided by contractor | Lifebuoy | 8 | Nos |
65 | 65 | Renewal of Name Board\n Ships name box along with lighting arrangement defective. To be renewed as per sample. Mat - MS (qty 01).\nMaterial and Service to be provided by Contractor | Misc fittings-5 | 1 | Nos |
66 | 66 | Ships name board on Port and Stbd side to be renewed. Mat - Wood (qty 02) with name engraved by steel electroplating.\nMaterial and Service to be provided by Contractor | Misc fittings-6 | 2 | Nos |
67 | 67 | Renewal and fitment of Punka lowers damaged at various trunkings. Size – 6” . Material and Service to be provided by contractor | Punka lowers | 5 | Nos |
68 | 68 | Wire mesh and ball valve of air vent on upper decks be replaced. Structural defects on air vents to be repaired. Paint to be restored post repairs and surface preparation of plate. Material and Service to be provided by contractor | Air vent-1 | 15 | Nos |
69 | 69 | Renewal of Window coaming around wheel house deck . Job involves welding and cutting assistance. Mat - MS. Qty - 30 Running Meter.\nMaterial and Service to be provided by contractor | Window coaming | 30 | RMtr |
70 | 70 | Renewal of wire mesh of Natural air vent of all compartments ,corroded air vent , perished rubber beading of flaps . Hinges and butterfly nuts to be renewed. Material and Service to be provided by contractor | Air vent-2 | 15 | Nos |
71 | 71 | Renewal of Sounding point of tank threads worn out on both ends. Mat – Brass. Material and Service to be provided by contractor | Sounding point | 1 | Nos |
72 | 72 | Renewal of Fire hose box along with securing brackets. Job involves welding, cutting and renewal of securing brackets including fitment. Material and Service to be provided by contractor . | Fire hose box | 10 | Nos |
73 | 73 | 01 cable reel broken. To be manufactured and replaced in situ. Job involves renewal of securing brackets, welding and cutting assistance and fitment. Material and Service to be provided by contractor | Mooring rope reel | 1 | Nos |
74 | 74 | Renewal of Fiber canopy on foxle and quarter deck. Job involves complete renewal of stanchions (Mat - Stainless Steel), stanchion shoes, securing strips and installation with new fiber canopy 25 sqm). Material and Service to be provided by contractor | Deck canopy | 25 | Sqm |
75 | 75 | Renewal of Platform for quarter deck bollard . Mat – Chequered Plate Thickness - 6 mm. Material and Service to be provided by contractor | Wooden platform | 3 | Sqm |
76 | 76 | Renewal of Sea water pipe line for anchor chain cable. Mat – MS. Material and Service to be provided by contractor | Sea water pipe line | 6 | Mtr |
77 | 77 | Renewal of Wooden foot step broken in wheel house entrance door.Material and Service to be provided by contractor | Wooden Foot Step | 1 | Job |
78 | 78 | Manufacturing of Aluminium covers for 02 AC compressor unit on upper deck as per sample. Mat - Al plate. \nMaterial and Service to be provided by contractor | Aluminum cover | 2 | Nos |
79 | 79 | MS strip (15 cm X 75 cm) on upper deck WT doors (Qty - 05) damaged/ corroded. To be manufactured and welded IN SITU. Material and Service to be provided by contractor | Misc fittings-1 | 5 | Nos |
80 | 80 | Renewal of weather deck locker. Job involves renewal of securing brackets and fitment. Material and Service to be provided by contractor | Deck locker | 1 | Nos |
81 | 81 | Renewal of Engine room blower wire mesh and securing MS strips. Quote for Service and Material. | Engine room blower | 4 | Nos |
82 | 82 | Renewal of Sunmica (Qty - 25 Sqm) of various places in accommodations .Quote for Service and Material. | Furniture-1 | 25 | Sq.m |
83 | 83 | Renewal of wooden beading (Qty - 30 mtr) of various places in accommodations and offices.. Quote for Service and Material. | Furniture-2 | 30 | Sq.m |
84 | 84 | Renewal of Canvas covers of following deck equipment -Windlass and control stand (02 Nos), rescue boat (02 Nos), search light (02 Nos), magnetic compass (02 Nos), capstan and capstan control (02 Nos), boat motor (02 Nos). Material and Service to be provided by contractor. | Canvas covers | 1 | Job |
85 | 85 | Renewal of IMO stickers as per sample. Qty - 85 Nos. Material and Service to be provided by contractor | Misc fittings-7 | 1 | Job |
86 | 86 | Renewal of Fire extinguisher securing brackets. Job involves welding and cutting assistance including associated degutting of lagging, panelling,equipment and regutting affected due to hotwork. Qty – 10. Material and Service to be provided by contractor | Misc fittings-8 | 10 | Nos |
87 | 87 | Electroplating job to be undertaken on stainless steel fittings in galley and ships bell. Material and Service to be provided by contractor | Misc fittings-9 | 1 | Job |
88 | 88 | Manufacturing of OBM water tank as per sample. Job involves fitment, welding and cutting assistance. Mat- MS . Material and Service to be provided by contractor | Misc fittings-10 | 1 | Nos |
89 | 89 | Wall clock to be replaced at various location. Qty - 04. Material and Service to be provided by contractor | Misc fittings-11 | 4 | Nos |
90 | 90 | Port and Stbd Main engine, Wartsila, Model: 8L-26 (Running hour- Port: 2230, Stbd: 2210):- Carry out following routine/works: - (a) Renew fuel and lub oil filter. (b) Replace centrifugal filter will all seals. (c) Drain starting air vessels and air treatment units. (d) Serviceability checks of HT and LT cooling water pump. (e) Clean air compressor by water injection, inspect and clean turbocharger. (f) Change air filter to the turbo charger. (g) Check function of by-pass and waste gate assembly. (h) Lubricate fuel control mechanism linkage. (j) Carry out safety devices checks of both Main engines. Rectify defects, if any. (k) Check function of measuring devices and calibrate which are erratic. (l) Calibrate functioning of oil mist detector. (m) Check operation of turning gear and start inter lock device, repair/ calibrate. (n) Adjust Valve clearance. (p) Record and calibrate combustion pressure. (q) Inspect elastic engine mounting elements, renew if necessary. (r) Measure axial displacement and crankshaft deflection of crankshaft, rectify defect if not within limit. (s) Carry out alignment between engine and engine driven machinery. (t) Renew lubricating oil filter candles. (u) Calibrate functioning of cooling water venting system. (v) Inspect and clean charge air cooler air side. (w) Inspect filter/water separator control air, adjust/ repair if necessary. (x) Refresh actuator lubricating oil charge. (y) Make endoscopic inspection of valves, valve seats and running surface of cylinder liners, renew if defective. (z) Check function of valve rotators, repair if necessary. (aa) Inspect camshaft sections, repair defects. (ab) Inspect conical dealings and cavitation on inside of HP fuel pipes, renew if necessary. (ac) Overhaul air starting motor of both main engines. (ad) Inspect piston (without dismantling of piston rings), connecting rod, crankpin with bearing, cylinder liner, gudgeon pin and bearing. (ae) Inspect fuel injectors, renew nozzles and test. (af) Lub oil cooler of both Main engines to be dismantled, chemically cleaned and boxed back with new gaskets. System to be pressure tested and proved for operation post fitment of coolers. (ag) Carry out overhauling of Europa Actuator for satisfactory performance. (ah) Carry out SDC checks of both Main engine local control panel at wheel house control panel, rectify defects if any. Post completion of routine carry out safety device checks. Calibrate/renew defective safety devices and control cards. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. | Port and Stbd Main engine, Wartsila, Model : 8L-26 | 2 | Nos |
91 | 91 | Main Engine, Wartsila, Model : 8L-26 spares :- Filter Ring | 1581022 | 2 | Nos |
92 | 92 | Filter Cartridge | 4701002 | 4 | Nos |
93 | 93 | Spare Parts Kit | 4701019 | 2 | Nos |
94 | 94 | Filter Paper | 4713047 | 1 | Nos |
95 | 95 | O ring | 4714046 | 4 | Nos |
96 | 96 | O ring | 4714048 | 4 | Nos |
97 | 97 | O ring | 4714047 | 4 | Nos |
98 | 98 | O ring | 4714090 | 4 | Nos |
99 | 99 | O ring | 4714045 | 72 | Nos |
100 | 100 | Filter Cartridge | 4714010 | 5 | Nos |
101 | 101 | O ring | 4714093 | 4 | Nos |
102 | 102 | Gasket | 4714098 | 4 | Nos |
103 | 103 | Maintenance kit | 9105002 | 4 | Nos |
104 | 104 | Cylinder head gasket | 1050004 | 4 | Nos |
105 | 105 | Lub oil centrifugal filter body | 4713115 | 4 | Nos |
106 | 106 | Air starting motor repair kit | PAAE090819 | 4 | Nos |
107 | 107 | Port & Stbd Diesel Alternator, Make- Cummins {Model- 6CTA-8.3 D (M)}, (Running hour- Port: 2510, Stbd: 2625):- Carry out following routines/works on both DA :- (a) Remove injectors. Clean, inspect, repair & calibrate with new spares. (b) Remove fresh water heat exchanger. Clean & pressure test. (c) Remove turbocharger. Clean, inspect & repair with new repair kit (check turbocharger end play and radial clearance). (d) Tighten nut & cap screw of air inlet and exhaust system. (f) Replace belts for accessories. (g) Carry out tappet settings. (h) Flush cooling system. Run engine to bring it to operating temperature. Stop the engine reflush cooling system with potable water 2-3 times. Refill cooling system with coolant. (j) Carry out calibration of AVR, after calibration of AVR undertakes the voltage control test and paralleling trials. (k) Carry out calibration of over voltage protection unit (OVPU), reverse power relay and over speed trip. (l) Carry out SDC checks of both DA local control panel and wheel house display panel, rectify defects if any. (m) Post completion of routines, start the engine and check all gauges, replace if required, check for any oil/water leakage/exhaust leakage, rectify deefcts, stop the engine and recheck engine oil level, top up if require. (n) Carry out safety device checks, rectify defects if any. Post completion of routine and load trails, calibrate/ renew defective safety devices and control cards. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. | Port and Stbd DA | 2 | Nos |
108 | 108 | Main Diesel Alternator, Model: 6 CTA 8.3 D/M (mandatory spares) :- Element lub oil filter | 3401544 | 6 | Nos |
109 | 109 | Element, Air cleaner | 3814312 | 4 | Nos |
110 | 110 | Element, Air cleaner | 3814313 | 6 | Nos |
111 | 111 | Filter, Fuel | 3931063 | 8 | Nos |
112 | 112 | Filter, Coolant | 4104821 | 8 | Nos |
113 | 113 | Inhibitor, corrosion 10 litres | 4926654 | 4 | Nos |
114 | 114 | Seal O-ring | 3940386 | 4 | Nos |
115 | 115 | Clip | 500694 | 4 | Nos |
116 | 116 | Hose, Plain | 3970407 | 8 | Nos |
117 | 117 | Clamp, T Bolt | 5303620 | 16 | Nos |
118 | 118 | Clamp, T Bolt | 149437 | 12 | Nos |
119 | 119 | Hose, Elbow | 3815373 | 4 | Nos |
120 | 120 | Hose, Plain | 67185H | 12 | Nos |
121 | 121 | Clamp Hose | 43828D | 32 | Nos |
122 | 122 | Hose Plain | 169546 | 8 | Nos |
123 | 123 | Cap filler | 3902468 | 4 | Nos |
124 | 124 | Seal rectangular ring | 3902466 | 4 | Nos |
125 | 125 | Seal, Rocker lever cover | 3905449 | 4 | Nos |
126 | 126 | Belt, V ribbed | 3289124 | 4 | Nos |
127 | 127 | Hose, Flexible | AK4012SS | 16 | Nos |
128 | 128 | Hose, Flexible | AK4015SS | 4 | Nos |
129 | 129 | Adaptor, Fuel connector | 3815420 | 4 | Nos |
130 | 130 | Seal, Banjo connector | 4942278 | 24 | Nos |
131 | 131 | Screw, RKR lever adjusting | 3937438 | 24 | Nos |
132 | 132 | Nut, Heavy hexagon | 3927692 | 48 | Nos |
133 | 133 | Gasket, Breather | 3970886 | 4 | Nos |
134 | 134 | Isolator, Noise | 3930543 | 12 | Nos |
135 | 135 | Clamp, V band | 3905216 | 4 | Nos |
136 | 136 | Aftercooler | 5262314 | 1 | Nos |
137 | 137 | Damper, Vibration | 3925570 | 2 | Nos |
138 | 138 | Support fan | 5263529 | 2 | Nos |
139 | 139 | Injector | 3926787 | 3 | Nos |
140 | 140 | Gasket, Hydraulic pump | 3940245 | 2 | Nos |
141 | 141 | Pump, Sea water | 4963510 | 2 | Nos |
142 | 142 | Pump, Water | 3973114 | 2 | Nos |
143 | 143 | Seal, O-ring | 3902089 | 2 | Nos |
144 | 144 | Tensioner Belt | 3976831 | 2 | Nos |
145 | 145 | Turbocharger | 3595508 | 1 | Nos |
146 | 146 | Control, Governor | 3974704 | 1 | Nos |
147 | 147 | Sensor, Temperature | 4911877 | 2 | Nos |
148 | 148 | Sensor, Pressure | 4911882 | 2 | Nos |
149 | 149 | Pick up, Magnetic | 4912304 | 2 | Nos |
150 | 150 | Transciever | 4913256 | 2 | Nos |
151 | 151 | Port and Stbd Voith Turbo Schneider, Model - 21 R 5/150-2 (Running Hour- Port: 2230, Stbd: 2210):- Carry out following routines/works: - (a) Renew the screw joint. (b) Check for the leakage from blade shaft sealing, rectify defect. (c) Check for the leakage from main seal, change seal if defective. (d) Check main gear teeth for any damage, repair it if damaged. (e) Check the input gear, repair it if damaged. (f) Check for the leakage from mounting gear, if any rectify leakage. (h) Check for leakage from the propeller well, if any rectify leakage. (j) Check for correct functioning of rotor space ventilation, repair if defective. (k) Renew corrosion protection. (l) Safety device checks to be undertaken on both Voith system. Calibrate all safety devices. (m) Following oil pressure sensor local display panel on both Voith not working, to be renewed: - (i) Lub oil pressure (ii) Control oil pressure (iii) Rotor oil pressure. (n) Carry out overhauling of both Voith Cooling pump. (p) Calibrate all temperature guages in the system. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service | Port and Stbd Voith Turbo Schneider, Model - 21 R 5/150-2 | 2 | Nos |
152 | 152 | Voith turbo Schneider propulsion, Type- VSP 28R5/234-2AE45 KW RPM (mandatory spares):- Shaft seal ring ADCK-300x340x16 (H01.067195) | Voith -1 | 2 | Nos |
153 | 153 | Round cord ring V-420x4.5NBR70 (H01.086366) | Voith -2 | 10 | Nos |
154 | 154 | O - ring 560x5 NBR70 (H01.032840) | Voith -3 | 10 | Nos |
155 | 155 | O- ring 454x8 NBR 70 (H01.064102) | Voith -4 | 10 | Nos |
156 | 156 | Bulb lamp 35x18.5-24V 5W (H01.095322) | Voith -5 | 20 | Nos |
157 | 157 | Filter element HYDAC 12782361300R020 (H01.016221) | Voith -6 | 4 | Nos |
158 | 158 | Repair kit (H01.012435) | Voith -7 | 2 | Nos |
159 | 159 | Lub oil pressure sensor | Voith -8 | 2 | Nos |
160 | 160 | Control oil pressure sensor | Voith -9 | 2 | Nos |
161 | 161 | Rotor oil pressure | Voith -10 | 2 | Nos |
162 | 162 | Bearing oil Temperature sensor | Voith -11 | 2 | Nos |
163 | 163 | Fuel and Lub oil centrifuge, Make-Alfa Laval PA 605:- Carry out following routines/works: - (a) Clean and inspect inlet and outlet pipe threads, paring disc, housings and frame hood. Renew defective parts. (b) Clean and inspect separator bowl, top disc, bowl discs, distributor, nozzles in bowl body, sliding bowl bottom, discharge mechanism, threads on bowl hood and bowl body, bowl spindle cone and bowl body nave, renew damaged/defective parts. (c) Clean and inspect oil mist fan, oil pump, water tank, bowl spindle, ball bearing housing, indentations and radial bobble of bowl spindle, renew damaged/defective parts. (d) Clean lub oil sump, fill sump with fresh oil. (e) Clean and inspect friction coupling, renew if defective. (f) Replace electric motor bearing. (g) Fuel leakage observed from fuel centrifuge drain line, Suspect control system malfunctioning, Defect to be rectified. (h) Carry out overhauling of Starting control panels. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. | Alfa Laval PA 605 | 1 | Nos |
164 | 164 | Alfa level fuel/ oil centrifuge:- Major Service kit | Alfa level fuel oil centrifuge-1 | 1 | Nos |
165 | 165 | Intermediate Service kit | Alfa level fuel oil centrifuge-2 | 1 | Nos |
166 | 166 | Ball bearing 2306M | Alfa level fuel oil centrifuge-3 | 2 | Nos |
167 | 167 | Ball bearing 6307 M/C3 | Alfa level fuel oil centrifuge-4 | 2 | Nos |
168 | 168 | OWS, Make-Suyash, Model-SD 0.15:- Carry out following routine/works: - (a) Replace Coalescer. (b) Replace adsorber elements. (c) Replace stuffing box packing. (d) Replace zinc anodes. (e) Renew lub oil of pump gear assembly. (f) Open the inspection port of the oil separator housing, the oil separator housing and the adsorber housing. Replace worn out parts. (h) Remove the sludge and clean container. (j) Check seal and piston valves, replace damaged seal and components. (k) Replace sensor electrode. (l) Carry out overhauling of Starting control panels. Post completion of routines, OWS to be started for satisfactory performance checks. Trials to be undertaken and system performance to be proved for Satisfactory.Quote for Service | OWS, Make-Suyash, Model-SD 0.15 | 1 | Nos |
169 | 169 | OWS, Make-Suyash, Modle-SD0.15:- Resilient stator for pump | OWS-1 | 1 | Nos |
170 | 170 | Helical rotor | OWS-2 | 1 | Nos |
171 | 171 | O-ring for pump | OWS-3 | 2 | Nos |
172 | 172 | Retaining ring | OWS-4 | 2 | Nos |
173 | 173 | Retaining color | OWS-5 | 2 | Nos |
174 | 174 | Drive pin | OWS-6 | 2 | Nos |
175 | 175 | V-belt | OWS-7 | 1 | Nos |
176 | 176 | Pressure guage | OWS-8 | 3 | Nos |
177 | 177 | Level sensing probe cassete | OWS-9 | 3 | Nos |
178 | 178 | Control PCB | OWS-10 | 3 | Nos |
179 | 179 | Interconnecting cable | OWS-11 | 3 | Nos |
180 | 180 | Pneumatic cylinder | OWS-12 | 3 | Nos |
181 | 181 | Pilot solenoid valve | OWS-13 | 3 | Nos |
182 | 182 | Copper tube | OWS-14 | 1 | Set |
183 | 183 | Auto air vent valve | OWS-15 | 1 | Nos |
184 | 184 | Manual air vent valve | OWS-16 | 1 | Nos |
185 | 185 | Coalescer filter | OWS-17 | 1 | Nos |
186 | 186 | Complete measuring cell | OWS-18 | 1 | Nos |
187 | 187 | PCB-BI | OWS-19 | 1 | Nos |
188 | 188 | PCB-C | OWS-20 | 1 | Nos |
189 | 189 | PBC-D | OWS-21 | 1 | Nos |
190 | 190 | PCB-G | OWS-22 | 1 | Nos |
191 | 191 | Max & Min Potentiometer | OWS-23 | 2 | Nos |
192 | 192 | Pressure relief valve | OWS-24 | 1 | Nos |
193 | 193 | Sampling cock | OWS-25 | 3 | Nos |
194 | 194 | Dry running protection unit | OWS-26 | 1 | Nos |
195 | 195 | Reciprocating Air Compressors, Make- Elgi (Model HP 10 300):- Carry out 1000 Hourly routines of both air compressors: - (a) Change oil and oil filter. (b) Minor air leakage in system, to be Rectify. (e) Adjust pressure setting of relief valve as per manual. (f) Change inlet air filter. (g) Clean breather valve. (h) Inspect all valves, renew if defective. (j) Calibrate non return valve. (k) Clean and inspect moisture trap, renew if required. (l) Carry out overhauling of Starting control panels. Trials to be undertaken and system performance to be proved for satisfactory. Quote for Service. | Reciprocating Air Compressor | 2 | Nos |
196 | 196 | Reciprocating Air Compressors, Make- Elgi (10 Model -HP 300):- Kit complete, Overhaul | Air compressor | 2 | Nos |
197 | 197 | CO2 Fire Fighting System - Carry out following routines:- \n(a) Renew all flexible hoses (qty-10),\n(b) Overhaul non-return valves and safety stop valves,\n(c) Remove and inspect cylinder operating heads and bursting discs, test for correct functioning,\n(d) Undertake hydro pressure testing of all bottles at 1.5 times of working pressure (qty 06) and submit report.\n(e) Carry out weight test of all 06 CO2 cylinders and refill gas if required. System to be proved for satisfactory performance,\n(f) CO2 remote control panel limit switch not working. To be replaced (qty 02), Quote for Service and Material | CO2 Firefighting system | 1 | Nos |
198 | 198 | Both Main engine Turbocharger outlet temperatures indicating beyond permissible limit/ malfunctioning. Suspected sensors faulty, to be renewed. Quote for Service and Material. | Both Main engine-1 | 2 | Job |
199 | 199 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 100 mm). Quote for Service and Material. | System pipelines-1 | 10 | Mtr |
200 | 200 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 80 mm). Quote for Service and Material. | System pipelines-2 | 10 | Mtr |
201 | 201 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 65 mm). Quote for Service and Material. | System pipelines-3 | 5 | Mtr |
202 | 202 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 125 mm). Quote for Service and Material. | System pipelines-4 | 5 | Mtr |
203 | 203 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 100 mm). Quote for Service and Material. | System pipelines-5 | 5 | Mtr |
204 | 204 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 65 mm). Quote for Service and Material. | System pipelines-6 | 10 | Mtr |
205 | 205 | System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 50 mm). Quote for Service and Material. | System pipelines-7 | 10 | Mtr |
206 | 206 | System Pipelines: - Renew with end fittings of Air Vent & Filling System (150mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-8 | 2 | Mtr |
207 | 207 | System Pipelines: - Renew with end fittings of Air Vent & Filling System (100mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-9 | 2 | Mtr |
208 | 208 | System Pipelines: - Renew with end fittings of Air Vent & Filling System (65mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-10 | 10 | Mtr |
209 | 209 | System Pipelines: - Renew with end fittings of Air Vent & Filling System (50mm) (Carbon Steel), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-11 | 2 | Mtr |
210 | 210 | Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (300mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-12 | 5 | Mtr |
211 | 211 | Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (100mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-13 | 5 | Mtr |
212 | 212 | Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (80mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-14 | 5 | Mtr |
213 | 213 | Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (65mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-15 | 10 | Mtr |
214 | 214 | Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (45mm) (Cu-Ni), pressure test to 1.5 times working pressure(kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-16 | 10 | Mtr |
215 | 215 | System Pipeline:- Renew with end fittings of Lub oil and Sanitary system (40mm) (Copper), pressure test to 1.5 times working pressure (kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-17 | 5 | Mtr |
216 | 216 | System Pipeline:- Renew with end fittings of Lub oil and Sanitary system (32mm) (Copper), pressure test to 1.5 times working pressure (kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-18 | 5 | Mtr |
217 | 217 | System Pipeline: - Renew with end fittings of Lub oil and Sanitary system (125mm) (Copper), pressure test to 1.5 times working pressure (kg/cm2), fit onboard and prove. Quote for Service and Material. | System pipelines-19 | 7 | Mtr |
218 | 218 | Valves:- Removal, overhauling, pressure testing and fitment of 65mm SDNR valves. Quote for Service and Material. | System valves-1 | 2 | Nos |
219 | 219 | Valves:- Removal, overhauling, pressure testing and fitment of 65mm SD valves. Quote for Service and Material. | System valves-2 | 3 | Nos |
220 | 220 | Valves:- Removal, overhauling, pressure testing and fitment of 80mm Gate valves. Quote for Service and Material. | System valves-3 | 3 | Nos |
221 | 221 | Valves:- Removal, overhauling, pressure testing and fitment of 80mm Globe valves. Quote for Service and Material. | System valves-4 | 2 | Nos |
222 | 222 | Valves:- Removal, overhauling, pressure testing and fitment of 125mm Storm valves. Quote for Service and Material. | System valves-5 | 2 | Nos |
223 | 223 | Valves:- Removal, overhauling, pressure testing and fitment of 150mm SDNR valves. Quote for Service and Material. | System valves-6 | 3 | Nos |
224 | 224 | Valves:- Removal, overhauling, pressure testing and fitment of 200mm Gate valves. Quote for Service and Material. | System valves-7 | 2 | Nos |
225 | 225 | Valves:- Removal, overhauling, pressure testing and fitment of 200mm Butterfly valves. Quote for Service and Material. | System valves-8 | 2 | Nos |
226 | 226 | Valves:- Removal, overhauling, pressure testing and fitment of 300mm Butterfly valves (Hydraulic valve). Quote for Service and Material. | System valves-9 | 2 | Nos |
227 | 227 | Valves:- Removal, overhauling, pressure testing and fitment of 100mm Gate valve. Quote for Service and Material. | System valves-10 | 3 | Nos |
228 | 228 | Valves:- Removal, overhauling, pressure testing and fitment of 400mm Globe valve. Quote for Service and Material. | System valves-11 | 2 | Nos |
229 | 229 | Valves:- Removal, overhauling, pressure testing and fitment of 40mm SD valve. Quote for Service and Material. | System valves-12 | 3 | Nos |
230 | 230 | Valves:- Removal, overhauling, pressure testing and fitment of 32mm SD valve. Quote for Service and Material. | System valves-13 | 3 | Nos |
231 | 231 | Valves:- Removal, overhauling, pressure testing and fitment of 65mm Storm valve. Quote for Service and Material. | System valves-14 | 2 | Nos |
232 | 232 | Valves:- Removal, overhauling, pressure testing and fitment of 80mm Storm valve. Quote for Service and Material. | System valves-15 | 2 | Nos |
233 | 233 | Valves:- Removal, overhauling, pressure testing and fitment of 125mm SDNR valve. Quote for Service and Material. | System valves-16 | 2 | Nos |
234 | 234 | Valves:- Removal, overhauling, pressure testing and fitment of 50mm Quick shut down valve. Quote for Service and Material. | System valves-17 | 2 | Nos |
235 | 235 | Valves:- Removal, overhauling, pressure testing and fitment of 50mm SDNR valve. Quote for Service and Material. | System valves-18 | 2 | Nos |
236 | 236 | Valves:- Removal, overhauling, pressure testing and fitment of 25mm Quick shut down valve. Quote for Service and Material. | System valves-19 | 2 | Nos |
237 | 237 | Renewal of hot lagging for DA and Main Engine exhaust system pipeline. Material- MWMB. Quote for Service and Material. | Hot lagging | 20 | Sq m |
238 | 238 | Stbd Main engine idling RPM erratic. Suspected governor malfunctioning(Make- Europa). To be calibrated and proved for satisfactory performance. Quote for Service and Material. | Both Main engine-2 | 1 | Nos |
239 | 239 | Both Main engine starting air line water trap valves to be overhauled. Quote for Service and Material. | Both Main engine-3 | 2 | Nos |
240 | 240 | Remove, dismantle, chemically clean, assemble and pressure test upto required pressure with spares for the following:- (a) Fuel cooler of Main engine. (b) Both Alfa cooler to be dismantled in-situ, mechanically cleaned and boxed back with new gaskets. System to be pressure tested and proved for operation post fitment of coolers. Test pr- 3.5 kg/cm2. (c) Existing inlet and outlet pipe of both Alfa coolers to be replaced with Cu-Ni pipe. Length- 0.3 mtr, Mat- SS, Dia- 80 mm (d) Sea water inlet pressure gauge line adaptor of both Alfa cooler damaged, to be renewed. Quote for Service. | Heat Echangers | 1 | Job |
241 | 241 | Stbd Main engine lub oil centrifugal filter body damaged. To be renewed. Quote for Service | Stbd Main engine | 1 | Nos |
242 | 242 | (a) Both pre-heaters of Main engine to be dismantled, mechanically cleaned and boxed back. System to be pressure tested and proved for operation post fitment of pre-heater. Test pr- 3 kg/cm2.\n(b) Both pre- Heater circulating pumps along with motor to be overhauled.\nQuote for Service and Material. | Pre-heater | 1 | Job |
243 | 243 | Exhaust leakage observed from Port Main engine and Stbd DA exhaust line flange. Suspected metallic gasket failure, to be renewed. Quote for Service and Material. | Exhaust line flange | 1 | Job |
244 | 244 | Main engine and DA overhead tanks to be cleaned and paint to be restored as per paint scheme. Respective sight glass to be renewed. Quote for Service and Material. | Expansion tank | 4 | Nos |
245 | 245 | Both Voith limit switches not working. Limit switches to be renewed. Qty- 04 Quote for Service and Material. | Voith limit switch | 1 | Job |
246 | 246 | Hinges to be provided/ fabricated on chequred plates of engine room for operating system valves. Qty- 15. Quote for Service and Material. | Chequred plates | 1 | Job |
247 | 247 | Sea water suction Strainers: - Renew following suction strainers as per sample: Main sea chest, Bilge suction and DA suction. Mat - SS. Qty- 08 Quote for Service and Material. | Sea water suction strainers | 8 | Nos |
248 | 248 | Both Main engine Fly wheel safety guards damaged. Guards to be manufactured as per sample. Quote for Service and Material | Safety Guards | 1 | Job |
249 | 249 | External Firefighting system, Make-Jason Engg, Model-SRU-C255 VK1.8 CCW-02:- Following works to be undertaken on both FIFI system (a) Both FIFI clutch lub oil cooler to be cleaned and pressure test to be carried out. Serviceability checks of system to be undertaken. Trials to be undertaken and system performance to be proved for satisfactory. (b) Actuator of nozzle of FIFI system on top of bridge not operating. Same to be renewed. Qty- 02 (c) Both FIFI clutch not engaging in remote mode. Defect rectification to be undertaken (d) Operating wheels of FIFI system valves damaged. Same to be renewed, Qty- 08. (e) Control panel at bridge and engine room operating erratically, control panel checks to be undertaken and defective components to be repaired. Quote for Service and Material. | External Firefighting system | 1 | Job |
250 | 250 | Repair of hand pump fitted on foxle to be undertaken. Quote for Service and Material. | Hand pump | 1 | Nos |
251 | 251 | Temperature thermometers of various system lines to be renewed as per sample. Qty- 04 Quote for Service and Material. | Thermometer | 4 | Nos |
252 | 252 | Suction and discharge pressure gauges of various system lines to be renewed as per sample as given bellow :-( a) Range -1 to 2 bar. Qty-05 (Back mounted) (b) Range- 0 to 10 bar. Qty-08 (Back mounted) (c) Range-0 to 40 bar. Qty-03 (Back mounted). (d) Range-0 to 6 bar. Qty-06 (Vertical mounted). Quote for Service and Material. | Pressure gauges | 22 | Nos |
253 | 253 | Overhauling of fire hydrants including coupling to be carried out, Qty -10. Quote for Service. | Fire hydrants | 10 | Nos |
254 | 254 | Fire hydrant coupling | Fire hydrant coupling | 10 | Nos |
255 | 255 | Both Alfa cooler sea water inlet gauge line adopter broken. Adopter to be renewed as per sample. Quote for Service and Material. | Adapter | 2 | Nos |
256 | 256 | Air bottles (Capacity- 1000 ltrs) to be pressure tested up to 45 bar, Qty-02. Quote for Service and Material. | Air bottles | 2 | Nos |
257 | 257 | Flap cover to be provided at DD compressor exhaust outlet. Quote for Service and Material. | Flap cover | 1 | Nos |
258 | 258 | Air vent of dirty oil and sludge tank corroded. Air vent to be renew as per sample. Qty-02, Mat-MS. Quote for Service. | Air vent-3 | 2 | Nos |
259 | 259 | Lub oil transfer hose damaged, to be renewed. Dia- 1.5 inch, Mat- PVC, Length- 100 mtr. Quote for Material. | Lub oil hose | 100 | Mtr |
260 | 260 | Main Switch board: Following works to be carried out: - (a) Undertake calibration of instrument panel/ meters fitted on MSB (Qty 16), (b) Replace bus bar insulators (Qty 06). Quote for Service. | Main switch board( Marine Electricals) | 1 | Job |
261 | 261 | MSB, Starter panels & DBS. M/s Marine Electricals:-Under voltage relay 220V/240V (E/SC/02140) | MSB, Starter panels & DBS. M/s Marine Electricals | 2 | Nos |
262 | 262 | Auxiliary contact rated 10A, 220V coil with 2NO+2NC (A/SC/13103) | MSB, Starter panels -1 | 2 | Nos |
263 | 263 | Push button (D/SC/00018) | MSB, Starter panels -2 | 1 | Nos |
264 | 264 | Indicator lamp LED white colour 230VAC (B/SC/00166) | MSB, Starter panels -3 | 4 | Nos |
265 | 265 | Indicator lamp LED green colour 230VAC (H/SC/00001) | MSB, Starter panels -4 | 4 | Nos |
266 | 266 | Indicator lamp LED red colour 230VAC (H/SC/00002) | MSB, Starter panels -5 | 4 | Nos |
267 | 267 | Indicator lamp LED blue colour 230VAC (H/SC/00003) | MSB, Starter panels -6 | 4 | Nos |
268 | 268 | AC voltmeter 0-500V RM at 415V(H/SC/00006) as per sample | MSB, Starter panels -7 | 1 | Nos |
269 | 269 | Ammeter 0-300/5A RM at 215A (G/RS/01852) as per sample | MSB, Starter panels -8 | 1 | Nos |
270 | 270 | Echo sounder (Koden) showing erratic reading. Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material. | Echo sounder (Koden) | 1 | Job |
271 | 271 | VHF-2 power supply unit defective To be operationalised. Quote for Service and Material | VHF | 1 | Nos |
272 | 272 | Search & Rescue Transponder (Model-SART-3, Make-Pathfinder, ACR Electronics) to be replaced. Qty- 02. Quote for Material | SART(ACR) | 2 | Nos |
273 | 273 | EPIRB to be replaced. Make- Pathfinder, Mode-RLB 37, Qty- 01. Quote for Material | EPIRB(ACR) | 1 | Nos |
274 | 274 | Navigation control panel not working on 24V DC supply. Carry out repair of the panel and prove system as per designed performance. Quote for Service. | Navigation control panel(Marine Electricals) | 1 | Job |
275 | 275 | Navigation light panel:- Fault detection module card (U/VTV/000008) | Navigation light panel-1 | 1 | Nos |
276 | 276 | 220V, 1000W GX9.5 Tungsten halogen bulb (RAY-SL-553-07) | Navigation light panel-2 | 2 | Nos |
277 | 277 | Portable day light signaling search light:- 24V 60W incandescent bulb with associated fittings | Navigation light panel-3 | 4 | Nos |
278 | 278 | Switch for lantern (RET-09/14) | Navigation light panel-4 | 1 | Nos |
279 | 279 | PA system amplifier unit defective. To be repaired. Quote for Service and Material. | PA system( Hanshin electronics) | 1 | Nos |
280 | 280 | Emergency light (24VDC, 40W) at various locations not working, to be renewed. Quote for Service and Material | Emergency lights( Ray Enterprises | 20 | Nos |
281 | 281 | Carry out overhauling of lighting transformer. Equipment to be restored to designed performance levels (7.5 KVA) Quote for Service and Material | Transformers(7.5 KVA) | 2 | Nos |
282 | 282 | Carry out overhauling of following Pump motors and starters: - (a) Fresh water pump (2.2 KW, Qty-02) (b) Bilge ballast GS pump (11KW, Qty-01). Quote for Service and Material | Motors & starters | 1 | Job |
283 | 283 | Navigational lights (230V 65W, 24V 40W) fitted at various locations defective, to be repaired. Job also involves renewal of securing brackets. Qty - 06. Quote for Service. | Navigational lights (Marine Electricals) | 1 | Job |
284 | 284 | Navigation lights:- Bulb 2P8 230V/65W ( AI/000023 | Navigation lights-1 | 6 | Nos |
285 | 285 | Bulb 24V/40W (AI/000021) | Navigation lights-2 | 6 | Nos |
286 | 286 | Following test equipments to be renewed: - (a) EMC-01 (b) SPM meter – 01. Make- Fluke. (c) Temperature calibrator-01, Make- Nagman. (d) HP and LP calibrator- 01 (e ) Hydrolic Jaw puller kit- 01 (SKF- TMHP 10 E). (f) Mechanical Tool set(102 pcs)- 01, Make- Facom (Model- Jet S.M1204) (g) Feeler guage(0.05 mm to 1 mm)- 01, Make- Mitutoyo(184-304S) (h) Dial guage magnetic stand- 01, Make- Mitutoy(7011-10) (j) Dial Guage (0.01 mm to 10 mm)- 01, Make- Mitutoy(2046S). (k) Hydraulic Press Workshop type(Cap - 30 Tons) - 01, Make - Powerjac, Model - WTH- 30. Quote for Material. | Test equipment | 10 | Nos |
287 | 287 | EM Log speed unit not operational. To be calibrated. Quote for Service and Material | Speed Log | 1 | Nos |
288 | 288 | Split AC (Make - Voltas, Cap- 2 TR) fitted in wheel house and Split AC (Make - Voltas, Cap- 2 TR) fitted in MSB room observed to be malfunctioning and needs to be renewed. Quote for Service and Material | AC-1 | 2 | Nos |
289 | 289 | New Split AC (Make - Voltas, Cap- 1.5 TR) to be procured and to be fitted in Master cabin and ED cabin. Quote for Service and Material | AC-2 | 2 | Nos |
290 | 290 | Following batteries to be replaced (a) 12V, 120 AH . Quote for Material. | Batteries-1 | 8 | Nos |
291 | 291 | (b) 12V, 150 AH | Batteries-2 | 12 | Nos |
292 | 292 | (c) 12V, 180 AH | Batteries-3 | 10 | Nos |
293 | 293 | (d) 12V, 200 AH | Batteries-4 | 4 | Nos |
294 | 294 | (e) 12V, 7 AH | Batteries-5 | 4 | Nos |
295 | 295 | (a) Galley hot plate defective. To be repaired. Make-Kirst. \n(b) Submersible pump supply socket (415V 63A) damaged/defective. To be replaced. Quote for Service and Material | Misc. | 1 | Job |
296 | 296 | Carry out overhauling of following Ventillation motors:- \n(a) Galley ventillation blowers, 0.37KW, Qty- 02 (b) Wheel house supply blower, 0.37 KW, Qty- 01 © E/R ventillation blowers, 11 KW, Qty- 02 (d) Voith room supply blower, 1.5 KW, Qty- 01 (e) Accomodation supply blower, 1.5 KW, Qty- 01 (f) CO2 cylinder room blower, 0.37 KW, Qty- 01 (g) Bathroom ventilation blower, 0.37 KW, Qty- 01\nQuote for Service and Material | Ventillation motors | 1 | Job |
297 | 297 | Tank content gauges control panel (Nivo system) (Qty 02) observed to be defective. Functional checks of all gauges to be carried out. Defective components and sensors to be replaced. Tank level calibration to be undertaken. Serviceability checks and calibration of display module to be undertaken. Quote for Service. | Tank content gauge( Nivo control) | 1 | Job |
298 | 298 | Tank level indication:- Diaphragm level sensor (HPLI060-3F3GAEZ-AZ) | Tank level indication-1 | 2 | Nos |
299 | 299 | Tank level indication:- Diaphragm level sensor (EN4068B-913043-100) | Tank level indication-2 | 2 | Nos |
300 | 300 | RDA 860 PCB set consists of - power supply PCB, digital PCB, display PCB (EN4068B-963752-000, EN4068B-963751-000, EN4068B-963755-000) | Tank level indication-3 | 2 | Set |
301 | 301 | Sensor gasket (EN4068B-524246-000) | Tank level indication-4 | 2 | Nos |
302 | 302 | Tube light (40W) fitted onboard at various locations to be replaced with LED (15W) tube lights. Job also involves renewal of securing brackets at 10 locations. Quote for Services and Material | LED light (Ray enterprises | 30 | Nos |
303 | 303 | Tube light (25W) fitted in engine room defective. All lights to be replaced with LED (15W) tube light. Job also involves renewal of securing brackets at 08 locations. Quote for Services and Material | LED light | 40 | Nos |
304 | 304 | Magnetic compass fitting (reflector type) in wheel house damaged. Fitting to be renewed. Magnetic compas to be calibrated and proved for satisfactory performance. Quote for Service and Material | Magnetic Compass | 1 | Nos |
305 | 305 | Automatic Identification System (AIS) - Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material | AIS | 1 | Nos |
306 | 306 | Air Whistle not working. To be operationalised. Quote for Service and Material | Air whistle | 2 | Nos |
307 | 307 | E/R Alarm panel display in wheel house not working. To be operationalised. Quote for Service | General calling alarm(L&T) | 1 | Nos |
308 | 308 | Alarm Monitoring System:- Indicating lamp (SPE0052500055) | Alarm monitoring system-1 | 2 | Nos |
309 | 309 | Digital IP module (IPMS101102G01) | Alarm monitoring system-2 | 1 | Nos |
310 | 310 | Power supply module (IPMS101102P01) | Alarm monitoring system-3 | 1 | Nos |
311 | 311 | Inter posing relay (IPMS105100R01) | Alarm monitoring system-4 | 1 | Nos |
312 | 312 | 2P, 2A, 24V DC MCB (SPE0053400589) | Alarm monitoring system-5 | 4 | Nos |
313 | 313 | Trans Rectifier Unit to be upgraded to latest version. Make- M/s L&T. Quote for Service and Material | TRU(3KW) | 1 | Nos |
314 | 314 | SPT fitted onboard at various locations found defective. To be operationalised. Qty- 07. Quote for Service and Material | SPT (Gitesse) | 1 | Job |
315 | 315 | Sound Power Telephone System:- Microphone(IMCOS 9022/MIC) | SPT system | 5 | Nos |
316 | 316 | Window Wiper rubber beading damaged. Window wipers to be renewed. Quote for Service and Matrial | Window wiper | 4 | Nos |
317 | 317 | Shore supply connection box damaged. To be renewed. Job involves renewal of securing brackets and fitment. Quote for Service and Material | Shore Supply connection box | 1 | Job |
318 | 318 | Flood lights and Search light not working. To be replaced. Job involves renewal of securing bracket and fitment. Quote for Service. | Search light (Ray Entep) | 10 | Nos |
319 | 319 | Flood lights: Glasses for 200W/250V flood lights | Flood lights & Search Light-1 | 5 | Nos |
320 | 320 | 200W Bulb, 250V | Flood lights & Search Light-2 | 5 | Nos |
321 | 321 | Lamp holders for WT flood light as per sample | Flood lights & Search Light-3 | 10 | Nos |
322 | 322 | Flood lights: Glasses for 1000W/250V flood lights as per sample | Flood lights & Search Light-4 | 5 | Nos |
323 | 323 | 1000W Bulb, 250V as per sample | Flood lights & Search Light-5 | 5 | Nos |
324 | 324 | Remote switch (415V, 25A) of wheel house supply fan, galley supply fan, galley exhaust fan and engine room emergency stop damaged, to be replaced. Quote for Service and Material | Switch | 5 | Nos |
325 | 325 | Deck lights (60W) and Deck lights guard/ fitting are broken. To be replaced as per sample. Job involves renewal of securing arrangement and fitment. Quote for Service and Material | Deck lights | 25 | Nos |
326 | 326 | Wall mounted fans (230V) defective. To be replaced as per sample. Make -Orient. Quote for Service and Material | Fans | 15 | Nos |
327 | 327 | Water tight rotary switch (230V 15A, Qty.-04), Emergency stop switch (415V, 25A, Qty-05), Lighting switch (230V 15A, Qty-20) and Lighting sockets (230V 15A, Qty-20) are broken at various locations. To be replaced. Quote for Service and Material | Switch and Socket | 49 | Nos |
328 | 328 | Following domestic equipment to be renewed: - (a) Hot water boiler (Make- Blue star, 20 Ltrs) (b) RO Purifier (Make- Kent. Model no-Kent grand, 20 Ltrs) (c) Refrigerator (210 Ltrs) (e) Water cooler (Make- Blue star. Model No-SDLX480, capacity - 40 Ltrs). Quote for Material | Domestic equipment | 1 | Each |
329 | 329 | Bunk light 230V 5W in crew cabin defective. To be replaced. Quote for Service and Material | Bunk light | 12 | Nos |
330 | 330 | Calibration of AFDS sensors(08 nos)/system to be undertaken and defective sensors to be renewed. Serviceability checks of AFDS system to be undertaken. System to be proved for satisfactory performance. Quote for Service and Material | AFDS | 1 | Job |
331 | 331 | Carryout overhauling of following battery charger:-\n(a) DA Battery charger 0.5KW, 02 in no.\n(b) ME Battery charger 2KW, 02 in no.\n(c) GMDSS Battery charger 24V 30A, 01 in no.\nQuote for Service and Material | Battery charger | 1 | Job |
332 | 332 | Shore supply cable 35 sqmm 3 core | Cable | 100 | mtr |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy