Rural Development And Panchayats Department has published Renovation Of Mi Tank And Ponds Under State Finance Commission Grant In Marungapuri Block In Tiruchirappalli District For The Year 2019-20 Package No . 49. Submission Date for this Tender is 01-03-2021. Irrigation Work Tenders in Tiruchirappalli Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

24514318
Corrigendum : Renovation Of Mi Tank And Ponds Under State Finance Commission Grant In Marungapuri Block In Tiruchirappalli District For The Year 2019-20 Package No . 49
Open Tender
Indian
Tamil Nadu
Tiruchirappalli
01-03-2021

Tender Details

Renovation Of Mi Tank And Ponds Under State Finance Commission Grant In Marungapuri Block In Tiruchirappalli District For The Year 2019-20 Package No . 49

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 13-Jun-2020 Date Corrigendum Date 19-06-2020
2 19-Jun-2020 Date Corrigendum2 Date 26-06-2020
3 26-Jun-2020 Date2 Date 02-07-2020
4 02-Jul-2020 Date3 Date 10-07-2020
5 10-Jul-2020 Date4 Date 17-07-2020
6 17-Jul-2020 Date5 Date 24-07-2020
7 24-Jul-2020 Date6 Date 30-07-2020
8 30-Jul-2020 Date7 Date 05-08-2020
9 05-Aug-2020 Date Ext Date 12-08-2020
10 11-Aug-2020 Date9 Date 19-08-2020
11 19-Aug-2020 Date Extension Date 26-08-2020
12 26-Aug-2020 Date10 Date 04-09-2020
13 04-Sep-2020 Date11 Date 09-09-2020
14 09-Sep-2020 Date12 Date 11-09-2020
15 11-Sep-2020 Date13 Date 15-09-2020
16 15-Sep-2020 Date14 Date 17-09-2020
17 17-Sep-2020 Date15 Date 22-09-2020
18 22-Sep-2020 Date16 Date 28-09-2020
19 28-Sep-2020 Date17 Date 05-10-2020
20 05-Oct-2020 Date18 Date 12-10-2020
21 12-Oct-2020 Date19 Date 16-10-2020
22 16-Oct-2020 Date20 Date 23-10-2020
23 23-Oct-2020 Date21 Date 03-11-2020
24 20-Nov-2020 Date24 Date 30-11-2020
25 29-Nov-2020 Date25 Date 07-12-2020
26 06-Dec-2020 Date26 Date 14-12-2020
27 13-Dec-2020 Date27 Date 21-12-2020
28 20-Dec-2020 Date28 Date 28-12-2020
29 28-Dec-2020 Date29 Date 04-01-2021
30 03-Jan-2021 Date30 Date 11-01-2021
31 11-Jan-2021 Date31 Date 25-01-2021
32 25-Jan-2021 Date32 Date 08-02-2021
33 08-Feb-2021 Date33 Date 15-02-2021
34 14-Feb-2021 Date34 Date 22-02-2021
35 21-Feb-2021 Date35 Date 01-03-2021

Key Value

Document Fees
Refer document
EMD
INR 69000.0 /-
Tender Value
INR 68.52 Lakhs /-

BOQ Items

Name of Scheme : State Finace Commission Grant 2019-20
Sl. No. Item Description Item Code / Make Quantity Units
1 1 REJUVENATION OF PULAVAN KULAM MI TANK IN UTHUKULI PANCHAYAT IN MARUNGAPURI BLOCK Clearing the Scrub jungle 10254.6 M2
2 2 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods,sectioning extra watering and consolidation by power roller including hire chages etc., complete. SOR 2019-20 86(1)+71(B) 5924.12 M3
3 3 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete SOR 2019-20 89 (a) 358.88 M3
4 4 Re-Construction of Sluice: Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick /Stone masonry in cement mortar walls under 3 m high 35.87 M2
5 5 Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Plain Cement Concrete 11.5 M2
6 6 Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Reinforced Cement Concrete 5.2 M3
7 7 Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 18.9 M3
8 8 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 20.44 M3
9 9 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 176.85 M2
10 10 Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 42.55 M3
11 11 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 2.22 M3
12 12 Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 5.36 M3
13 13 Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc.,Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc., 0.35 MT
14 14 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 30 M3
15 15 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2.5 NO
16 16 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
17 17 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
18 18 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
19 19 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
20 20 Repairs Sluice : Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 3.75 M3
21 21 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 1.88 M3
22 22 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 36.81 M2
23 23 Plain Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 6.75 M3
24 24 Pointing the RR masandry with cm 1:3 mixincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 27.44 M2
25 25 Plastering with cement mortar 1:4mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc 6.71 M3
26 26 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 0.76 M3
27 27 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 30 M3
28 28 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2 m
29 29 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
30 30 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
31 31 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
32 32 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
33 33 Provision for silt removing charges complete 1 No
34 34 Repairs Sluice : Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 3.75 M3
35 35 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 1.88 M3
36 36 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 36.81 M2
37 37 Plain Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 6.75 M3
38 38 Pointing the RR masandry with cm 1:3 mixincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 27.44 M2
39 39 Plastering with cement mortar 1:4mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc 6.71 M3
40 40 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 0.76 M3
41 41 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 30 M3
42 42 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2 m
43 43 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
44 44 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
45 45 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
46 46 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
47 47 Provision for silt removing charges complete 1 No
48 48 Construction of Weir :Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 50.42 M3
49 49 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 14.93 M3
50 50 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 57 M2
51 51 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 104.36 M3
52 52 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 53.3 M3
53 53 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete . 18.75 M3
54 54 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 4.02 M3
55 55 Provision for weep holes charges 1 No
56 56 Provision for Name board charges 1 No
57 57 REJUVENATION OF KOTTA PALUVANJI KULAM MI TANK IN PALUVANJI PANCHAYAT IN MARUNGAPURI BLOCK Clearing the Scrub jungle 11292 M2
58 58 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods,sectioning extra watering and consolidation by power roller including hire chages etc., complete. 7317.92 M3
59 59 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete SOR 2019-20 89 (a) 268.43 M3
60 60 Re-Construction of Sluice: Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick /Stone masonry in cement mortar walls under 3 m high 34.97 M2
61 61 Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Plain Cement Concrete 10.9 M2
62 62 Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Reinforced Cement Concrete 4.8 M3
63 63 Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 21.06 M3
64 64 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 20.56 M3
65 65 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 180.3 M2
66 66 Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 43.38 M3
67 67 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 2.15 M3
68 68 Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 4.95 M3
69 69 Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc.,Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc., 0.35 MT
70 70 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 30 M3
71 71 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2.5 NO
72 72 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
73 73 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
74 74 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
75 75 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
76 76 Construction of Weir :Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 50.42 M3
77 77 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 14.93 M3
78 78 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 57 M2
79 79 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 104.36 M3
80 80 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 53.3 M3
81 81 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete . 18.75 M3
82 82 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 6.03 M3
83 83 Provision for weep holes charges 1 No
84 84 Provision for Name board charges 1 No
85 85 REJUVENATION OF EDAYAN KULAM MI TANK IN UTHUKULI PANCHAYAT IN MARUNGAPURI BLOCK Clearing the Scrub jungle 7605 M2
86 86 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods,sectioning extra watering and consolidation by power roller including hire chages etc., complete. SOR 2019-20 86(1)+71(B) 5608.6 M3
87 87 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete SOR 2019-20 89 (a) 358.88 M3
88 88 Re-Construction of Sluice: Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick /Stone masonry in cement mortar walls under 3 m high 34.97 M2
89 89 Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Plain Cement Concrete 10.9 M2
90 90 Dismantling,Clearing away and carefully stacking materials useful for re-use for any thickness of walls Reinforced Cement Concrete 4.8 M3
91 91 Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 13.5 M3
92 92 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 18.04 M3
93 93 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 155.1 M2
94 94 Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 37.71 M3
95 95 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 2.15 M3
96 96 Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 4.95 M3
97 97 Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc.,Suplying and fabricating and placing in position of m.s rods (or) RTS for all RCC works as per design given including bending typing and cost of bending tying and cost of binding wire etc., 0.35 MT
98 98 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 30 M3
99 99 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2.5 NO
100 100 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
101 101 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
102 102 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
103 103 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
104 104 Repairs Sluice : Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 1.8 M3
105 105 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 0.9 M3
106 106 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 18.81 M2
107 107 Plain Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 4.05 M3
108 108 Pointing the RR masandry with cm 1:3 mixincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 27.44 M2
109 109 Plastering with cement mortar 1:4mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc 6.71 M3
110 110 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 0.46 M3
111 111 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 30 M3
112 112 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2 m
113 113 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
114 114 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
115 115 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
116 116 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
117 117 Provision for silt removing charges complete 1 No
118 118 Construction of Weir :Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 50.42 M3
119 119 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 14.93 M3
120 120 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 57 M2
121 121 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 104.36 M3
122 122 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 53.3 M3
123 123 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete . 18.75 M3
124 124 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 4.02 M3
125 125 Provision for weep holes charges 1 No
126 126 Provision for Name board charges 1 No
127 127 REJUVENATION OF KATTAYAN KULAM MI TANK IN UTHUKULI PANCHAYAT IN MARUNGAPURI BLOCK Clearing the Scrub jungle 4830.6 M2
128 128 Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods,sectioning extra watering and consolidation by power roller including hire chages etc., complete. SOR 2019-20 86(1)+71(B) 3185.36 M3
129 129 Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete SOR 2019-20 89 (a) 358.88 M3
130 130 Repairs Sluice : Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 1.8 M3
131 131 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 0.9 M3
132 132 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 18.81 M2
133 133 Plain Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 4.05 M3
134 134 Pointing the RR masandry with cm 1:3 mixincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 27.44 M2
135 135 Plastering with cement mortar 1:4mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc 6.71 M3
136 136 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 0.46 M3
137 137 Rough stone dry packing for aprons and revetment including palls for filling and wedging using good quality of new rough stones from approved quarry including conveyance charges including stacking them for premeasurement etc.complete complying with standard specificatios and as directed by the departmental officers. 24 M3
138 138 Fabiricating, Suppling and fixing of 50mm dia screw rod made up M.S round duly machined and fully threaded to suit the head assembly and provided with required holes. Conveying and leading the screw rod to the work site. Fixing the screw rod to the shutter guest plate with req bolt and nuts in proper alignment to the head set including dismantiling the existing damaged screw rod conveying and stocking the section store the screw rod should be painted with two coats ac black paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 2 m
139 139 Fabiricating, Suppling and fixing of Head set assembly medium duty with hexagonal nut (apporxmate 50 kg) made up of cast iron including moulding machining and the hexagonal nut threading to suit the screw rod providing with the threast bearing for smooth opration conveying and leading the head set assembly to the work site fixing the head set assembly to the tob beam by using requied bolt and nut in proper alignment including dismantiling the existing damaged screw rod conveying and stocking the section store the head set assembly supplyed with operating key and the both should be painting with two coat of ac block paint over one coat of red oxide primer. the rate including cost of materials labours charges for all fabricating and hoisting equipements conveyance charges for labour and other including all other taxes etc complete 1 No
140 140 Parches and fixing the guest plate for hold the wooden plug fabricated 8mm MS plate including fabrication oc 40X40 mm L angle with 32 mm dia of length welded with 3/4" in bolt with plate rod etc complete 1 No
141 141 Parches and fixing after reshaping country wood into plug cost including machinary to concocal shap fixing with guest plate etc complete 1 NO
142 142 Parches and fixing bottom catch plate for the wooden plug 6 mm MS plate 10mm dia with fabrication and fixing the wooden plug etc complete 1 No
143 143 Provision for silt removing charges complete 1 No
144 144 Construction of Weir :Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B 50.42 M3
145 145 Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc., 14.93 M3
146 146 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 57 M2
147 147 Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete 104.36 M3
148 148 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks 53.3 M3
149 149 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete . 18.75 M3
150 150 Plain Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 4.02 M3
151 151 Provision for weep holes charges 1 No
152 152 Provision for Name board charges 1 No
153 153 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}\n BI01010001010000000000000515BI01000011120 1 No
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail