}

Outsourcing Of Central Water Supply Installation Alongwith Outsourcing Of Central Water Supply Installation AlongwithDg Set At Age ( I ) ( Af ) Manauri, Manauri, Allahabad-Uttar Pradesh

Military Engineer Services-MES has published Outsourcing Of Central Water Supply Installation Alongwith Outsourcing Of Central Water Supply Installation AlongwithDg Set At Age ( I ) ( Af ) Manauri. Submission Date for this Tender is 06-07-2020. Hand Glove Tenders in Manauri, Allahabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24472180
Corrigendum : Outsourcing Of Central Water Supply Installation Alongwith Outsourcing Of Central Water Supply Installation AlongwithDg Set At Age ( I ) ( Af ) Manauri
Open Tender
Indian
Uttar Pradesh
Manauri, Allahabad
06-07-2020

Tender Details

Outsourcing Of Central Water Supply Installation Alongwith Outsourcing Of Central Water Supply Installation AlongwithDg Set At Age ( I ) ( Af ) Manauri , Providing Services Of 01 ( One ) Fitter General Mechanic ( Fgm ) ( Skilled ) As Pump Operator ( Male Person ) In Each Shifts For Works Like Maintenance And Operations Including Routine Maintenance Of Water Supply Installtion With All Nature Of Dependent Water Services In Given Shift Of Ssq Pump House . The All Connected Work Of Water Supply Installation With Equipments And Services Including Attending Day To Day Maintenance Operations At Site As Directed By The Engineer-In-Charge For All Days Including Saturday/ Sunday/Holiday /Gazzeted Holidays By Deploying Of Persons ( Male ) With Good Character And Discipline , Minimum Qualification Iti With Minimum 03 Years Of Working Experience Or 12Th Pass With Minimum 5 Years Of Experience In A Reputed Firm/Organization For The Trade . ( A ) Timings : Tentative Shift Timings Shall Be As Under ( However It Can Be Changed As Per Direction Issued By Age ( I ) Time To Time ) :- ( I ) 0800 Hrs To 1600 Hrs For Ist Shift Of 08 Hours . ( Ii ) 1600 Hrs To 2400 Hrs For Iind Shift Of 08 Hours . ( Iii ) 2400 Hrs To 0800 Hrs For Iiird Shift Of 08 Hours . Location: Ssq Area Located At 24 Ed Resticted Area - 1 NoNote:- 1 . The Pump House Installation With All Equipment Shall Be Operated By 01 No Fgm In Each Shift Of 08 Hours . 2 . The Pump House Installation Shall Be Run For Three Shift Round The Clock . , Providing Services Of 01 ( One ) Fitter General Mechanic ( Fgm ) ( Skilled ) As Pump Operator ( Male Person ) In Each Shifts For Works Like Maintenance And Operations Including Routine Maintenance Of Water Supply Installations With All Nature Of Dependent Water Services Given In Shift Of Pump House No 3 Of New Project Area . The All Connected Work Of Water Supply Installaion With Equipments And Services Including Attending Day To Day Maintenance Operations At Site As Directed By The Engineer-In-Charge For All Days Including Saturday/ Sunday/Holiday /Gazzeted Holidays Deploying Of Persons ( Male ) With Good Character And Discipline , Minimum Qualification Iti With Minimum 03 Years Of Working Experience In A Reputed Firm/Organization For The Trade . ( A ) Timings : Tentative Shift Timings Shall Be As Under ( However It Can Be Changed As Per Direction Issued By Age ( I ) Time To Time ) :- ( I ) 0800 Hrs To 1600 Hrs For Ist Shift Of 08 Hours . ( Ii ) 1600 Hrs To 2400 Hrs For Iind Shift Of 08 Hours . ( Iii ) 2400 Hrs To 0800 Hrs For Iiird Shift Of 08 Hours . Location: Pump House No 3 At 24 Ed Area - 01 NoNote:- 1 . The Pump House Installations With All Equipments At New Project Area Shall Be Operated By 01 No Fgm In Each Shift Of 08 Hours . 2 . The Pump House Installations Shall Be Run For Three Shifts Round The Clock . , Providing Services Of 01 ( One ) Fitter General Mechanic ( Fgm ) ( Skilled ) As Pump Operator ( Male Person ) In Each Shifts For Works Like Maintenance And Operations Including Routine Maintenance Of Water Purification Installation With All Nature Of Dependent Water Services Given In Shift Of Technical Area Pump House . The All Connected Work Of Water Purification Installation With Equipments And Services Including Attending Day To Day Maintenance Operations At Site As Directed By The Engineer-In-Charge For All Days Including Saturday/ Sunday/Holiday /Gazzeted Holidays By Deploying Of Persons ( Male ) With Good Character And Discipline , Minimum Qualification Iti With Minimum 03 Years Of Working Experience In A Reputed Firm/Organization For The Trades . ( A ) Timings : Tentative Shift Timings Shall Be As Under ( However It Can Be Changed As Per Direction Issued By Age ( I ) Time To Time ) :- ( I ) 0800 Hrs To 1600 Hrs For Ist Shift Of 08 Hours . ( Ii ) 1600 Hrs To 2400 Hrs For Iind Shift Of 08 Hours . Location: Technical Area At 24 Ed - 1 NoNote:- 1 . One No Pump House Installation With All Equipments At Tech Area Shall Be Operated By 01 No Fgm In Each Shift Of 08 Hours . 2 . The Plants Shall Be Run For Two Shifts Only . , Providing Services Of 01 ( One ) Fitter General Mechanic ( Fgm ) ( Skilled ) As Pump Operator ( Male Person ) In Each Shifts For Works Like Maintenance And Operations Including Routine Maintenance Of Water Purification Installation With All Nature Of Dependent Water Services Given In Shift Of Ro Plants At New Project . The All Connected Work Of Water Supply Installation With Equipments And Services Including Attending Day To Day Maintenance Operations At Site As Directed By The Engineer-In-Charge For All Days Including Saturday/ Sunday/Holiday /Gazzeted Holidays By Deploying Of Persons ( Male ) With Good Character And Discipline , Minimum Qualification Iti With Minimum 03 Years Of Working Experience In A Reputed Firm/Organization For The Trade . ( A ) Timings : Tentative Shift Timings Shall Be As Under ( However It Can Be Changed As Per Direction Issued By Age ( I ) Time To Time ) :- ( I ) 0800 Hrs To 1600 Hrs For Ist Shift Of 08 Hours . Location: New Project Ro Plants At 24 Ed- 1 NosNote :- 1 . Ro Plant Installation With All Equipments At New Project Shall Be Operated By 01 No Fgm In Each Shift Of 08 Hours . 2 . The Plants Shall Be Run For One Shift Only . , Notes For Item Nos 1 To 4 :- ( I ) Contractor Shall Adhere To Minimum Wages Act , Workmens Compensation Act , Esi , Epf Etc And Other Relevant Laws . The Payment Of Labourers Shall Be Made Through Personal Banks Accounts /Neft Only And Proper Record Of Payment Shall Be Submitted By The Contractor At The Time Of Payment Of Rars Duly Signed . ( Ii ) The Contractor Shall Provide Minimum One Supervisor To Supervise The Work Of Water Supply Installations Staff Having Minimum Qualification 12Th Class Pass With Knowledge Of Computer & Preparation Of Reports . The Supervisor Shall Report To The Eic/Age ( I ) Daily And Maintain An Attendance Of All The Staff Employed Through Attendence Register . ( Iii ) Cost Of Uniform For The Staff Employed Shall Be Borne By The Contractor . ( Iv ) Tools & Plants Required Forwater Supply Installation Maintenance & Cleaning Of The Premises As As Well As Maintaining Hygen Sanitation As Mentioned In Appendix A Shall Be Provided By Contractor As Required Time To Time And Quoted Unit Rate Shall Be Deemed Included For The Same . ( V ) It Is Contractors Responsibility To Provide Documents Such As Academic & Technical And Insurance Of Each Person Deployed By Contractor . ( Vi ) Cycle Or Any Other Conveyance Required For Supervisor For Supervision Of Installation Shall Also Be Provided By Contractor At His Own Cost . ( Vii ) All Personals Deployed By Contractor Including The Supervisor Will Wear Uniform As Approved By Age ( I ) And An Identity Card Will Be Provided For All The Personals After Due Security Clearances From Security Section Of Station Taken By Contractor . ( Viii ) Reliever For National Holidays/ Sundays Is To Be Provided By Contractor . All T&P For Normal Routine Maintenance Shall Be Provided By Contractor Including Safety Equipments Like Htrubber Hand Gloves , Earth Rod , Safety Shoes & Other Tools Etc . ( Ix ) The Deployed/Hired Man Power Shall Be Highly Skilled For Maintenace & Operator To Installed E/M Assest Safely . ( X ) Penality/Recovery Shallbe Made Against Contractors Dues On Non Attending/Rectying The Given Complaint After 30 Minutes Maximum , @ Rs 300/- Per Hours And For Absent From Duty @ Rs 2000/- Per Day Per Person . Duty Timing & Location Rotation Shall Be Followed As Directed . 08 Hours Working Period Measured As One Day For One Person . Per Calender Month Shall Contained 30 Days Each . ( Xi ) Daily Cleaning Of Equipments Such As Water Supply Installtions , Dg Set , Batteries By Waste Cotton & Sanitary It

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 16-Jun-2020 Corigendum No 01 Date 29-06-2020
2 17-Jun-2020 Corrigendum No 02 Other 29-06-2020
3 29-Jun-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 06-07-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 54000.0 /-
Tender Value
INR 27 Lakhs /-

BOQ Items

Name of Work: OUTSOURCING OF CENTRAL WATER SUPPLY INSTALLTALION ALONGWITH DG SET AT AGE (I) (AF) MANAURI.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Providing services of 01(ONE) Fitter General Mechanic (FGM) (Skilled) as pump operator (male person) in each shifts for works like maintenance and operations including routine maintenance of water supply installtion with all nature of dependent water services in given shift of SSQ PUMP HOUSE. The all connected work of water supply installation with equipments and services including attending day to day maintenance operations at site as directed by the Engineer-in-Charge for all days including SATURDAY/ SUNDAY/HOLIDAY /GAZZETED HOLIDAYS by deploying of persons (Male) with good Character and discipline, minimum qualification ITI with minimum 03 years of working experience or 12th pass with minimum 5 years of experience in a reputed firm/organization for the trade. \n(a) TIMINGS : Tentative shift timings shall be as under (however it can be changed as per direction issued by AGE(I) time to time):-\n(i) 0800 hrs to 1600 hrs for Ist shift of 08 Hours.\n(ii) 1600 hrs to 2400 hrs for IInd shift of 08 Hours.\n(iii) 2400 hrs to 0800 hrs for IIIrd shift of 08 Hours.\nLocation: SSQ Area located at 24 ED resticted area - 1 No\nNote:- \n1. The pump house installation with all equipment shall be operated by 01 No FGM in each shift of 08 hours.\n2. The pump house installation shall be run for three shift round the clock. 11 Per calender \nMonth
2 2 Providing services of 01(ONE) Fitter General Mechanic (FGM) (Skilled) as pump operator (male person) in each shifts for works like maintenance and operations including routine maintenance of water supply installations with all nature of dependent water services given in shift of pump house No 3 of NEW PROJECT AREA. The all connected work of water supply installaion with equipments and services including attending day to day maintenance operations at site as directed by the Engineer-in-Charge for all days including SATURDAY/ SUNDAY/HOLIDAY /GAZZETED HOLIDAYS deploying of persons (Male) with good Character and discipline, minimum qualification ITI with minimum 03 years of working experience in a reputed firm/organization for the trade. \n(a) TIMINGS : Tentative shift timings shall be as under (however it can be changed as per direction issued by AGE(I) time to time):-\n(i) 0800 hrs to 1600 hrs for Ist shift of 08 Hours.\n(ii) 1600 hrs to 2400 hrs for IInd shift of 08 Hours.\n(iii) 2400 hrs to 0800 hrs for IIIrd shift of 08 Hours.\nLocation: Pump house No 3 at 24 ED Area - 01 No\nNote:- \n1. The pump house installations with all equipments at New Project area shall be operated by 01 No FGM in each shift of 08 hours.\n2. The pump house installations shall be run for three shifts round the clock. 11 Per calender month
3 3 Providing services of 01(ONE) Fitter General Mechanic (FGM) (Skilled) as pump operator (male person) in each shifts for works like maintenance and operations including routine maintenance of water purification installation with all nature of dependent water services given in shift of Technical Area pump house. The all connected work of water purification installation with equipments and services including attending day to day maintenance operations at site as directed by the Engineer-in-Charge for all days including SATURDAY/ SUNDAY/HOLIDAY /GAZZETED HOLIDAYS by deploying of persons (Male) with good Character and discipline, minimum qualification ITI with minimum 03 years of working experience in a reputed firm/organization for the trades. \n(a) TIMINGS : Tentative shift timings shall be as under (however it can be changed as per direction issued by AGE(I) time to time):-\n(i) 0800 hrs to 1600 hrs for Ist shift of 08 Hours.\n(ii) 1600 hrs to 2400 hrs for IInd shift of 08 Hours.\nLocation: Technical Area at 24 ED - 1 No\nNote:- \n1. One No pump house installation with all equipments at Tech Area shall be operated by 01 No FGM in each shift of 08 hours.\n2. The plants shall be run for two shifts only. 11 Per calender month
4 4 Providing services of 01(ONE) Fitter General Mechanic (FGM) (Skilled) as pump operator (male person) in each shifts for works like maintenance and operations including routine maintenance of water purification installation with all nature of dependent water services given in shift of RO Plants at New Project. The all connected work of water supply installation with equipments and services including attending day to day maintenance operations at site as directed by the Engineer-in-Charge for all days including SATURDAY/ SUNDAY/HOLIDAY /GAZZETED HOLIDAYS by deploying of persons (Male) with good Character and discipline, minimum qualification ITI with minimum 03 years of working experience in a reputed firm/organization for the trade. \n(a) TIMINGS : Tentative shift timings shall be as under (however it can be changed as per direction issued by AGE(I) time to time):-\n(i) 0800 hrs to 1600 hrs for Ist shift of 08 Hours.\nLocation: New Project RO Plants at 24 ED- 1 Nos\nNote :- \n1. RO Plant installation with all equipments at New Project shall be operated by 01 No FGM in each shift of 08 hours.\n2. The plants shall be run for one shift only. 11 Per calender month
5 4.01 Notes for item Nos 1 to 4 :-\n(i) Contractor shall adhere to minimum wages act, workmen's compensation act, ESI, EPF etc and other relevant laws. The payment of labourers shall be made THROUGH PERSONAL BANKS ACCOUNTS /NEFT only and proper record of payment shall be submitted by the contractor at the time of payment of RAR's duly signed. \n(ii) The contractor shall provide minimum one Supervisor to supervise the work of water supply installations staff having minimum qualification 12th class pass with knowledge of computer & preparation of reports. The supervisor shall report to the EIC/AGE(I) daily and maintain an attendance of all the staff employed through attendence register. \n(iii) Cost of uniform for the staff employed shall be borne by the contractor.\n(iv) Tools & plants required forwater supply installation maintenance & cleaning of the premises as as well as maintaining hygen sanitation as mentioned in Appendix 'A' shall be provided by contractor as required time to time and quoted unit rate shall be deemed included for the same . \n(v) It is contractor's responsibility to provide documents such as academic & technical and Insurance of each person deployed by contractor . \n(vi) Cycle or any other conveyance required for supervisor for supervision of installation shall also be provided by contractor at his own cost.\n(vii) All personals deployed by contractor including the supervisor will wear uniform as approved by AGE(I) and an identity card will be provided for all the personals after due security clearances from security section of station taken by contractor. \n(viii) Reliever for National holidays/ Sundays is to be provided by contractor. All T&P for normal routine maintenance shall be provided by contractor including safety equipments like HTrubber hand gloves, earth rod, safety shoes & other tools etc.\n(ix) The deployed/hired man power shall be highly skilled for maintenace & operator to installed E/M assest safely.\n(x) Penality/Recovery shallbe made against contractor's dues on non attending/rectying the given complaint after 30 minutes maximum, @ Rs 300/- per hours and for absent from duty @ Rs 2000/- per day per person. Duty timing & location rotation shall be followed as directed. 08 hours working period measured as one day for one person. Per calender month shall contained 30 days each.\n(xi) Daily cleaning of equipments such as water supply installtions, DG Set, batteries by waste cotton & sanitary items, 10 mtr wide sourrounding area of pump houses, cleaned by brooming & grass cutting etc.\n(xii) Contractor's quoted rates shall deemed to included for aspects/ provisions as mentioned in para (i) to (xi) of the notes as mentioned above. \n
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail