}

Outsourcing Of Central Ac Plant And Dg Set Installation Under Age ( I ) ( Af ) Manauri, Manauri, Allahabad-Uttar Pradesh

Military Engineer Services-MES has published Outsourcing Of Central Ac Plant And Dg Set Installation Under Age ( I ) ( Af ) Manauri. Submission Date for this Tender is 06-07-2020. Diesel Generators Tenders in Manauri, Allahabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24470881
Corrigendum : Outsourcing Of Central Ac Plant And Dg Set Installation Under Age ( I ) ( Af ) Manauri
Open Tender
Indian
Uttar Pradesh
Manauri, Allahabad
06-07-2020

Tender Details

Outsourcing Of Central Ac Plant And Dg Set Installation Under Age ( I ) ( Af ) Manauri , Providing Services Of 01 ( One ) Refregeration Machanic ( Skilled ) As Ac Plant & Dg Set Operator For Maintenance & Operation Including Routine Maintenance With All Nature Of Dependent Services Given In Shift Of T-60 Ac Plants And Edp ( Photo Firm ) , Ac Plant Including Dg Set Installed For These Plants As Directed By The Engineer-In-Charge For All Days Including Sunday/Holiday /Gazzeted Holidays By Deploying Of Persons ( Male ) With Good Character And Discipline , Minimum Qualification Iti With Minimum 03 Years Of Working Experience Or 12Th Pass With Minimum 05 Years Trade Experience In A Reputed Firm/Organization For Refregeration Mechanic . ( A ) Timings : Tentative Shift Timings Shall Be As Under ( However It Can Be Changed As Per Direction Issued By Age ( I ) Time To Time ) :- ( I ) 0800 Hrs To 1600 Hrs For Ist Shift Of 08 Hours . ( Ii ) 1600 Hrs To 2400 Hrs For Iind Shift Of 08 Hours . ( Iii ) 2400 Hrs To 0800 Hrs For Iiird Shift Of 08 Hours . ( B ) Location/Premises Of Working Place:-At Old Project And Various Installations As Decided By Engineer-In-Charge- 01 No , Notes For Item Nos 1:- ( I ) Contractor Shall Adhere To Minimum Wages Act , Workmens Compensation Act , Esi , Epf Etc And Other Relevant Laws . The Payment Of Labourers Shall Be Made Through Banks Account/Neft Only And Proper Record Of Payment Shall Be Submitted By The Contractor At The Time Of Payment Of Rars Duly Signed . ( Ii ) The Contractor Shall Provide Minimum One Supervisor To Supervise The Work Of Ac Plants Installation Staff Having Minimum Qualification 12Th Class Pass With Knowledge Of Computer & Preparation Of Reports . The Supervisor Shall Report To The Eic/Age ( I ) Daily And Maintain An Attendance Of All The Staff Employed Through Attendence Register . ( Iii ) Cost Of Uniform For The Staff Employed Shall Be Borne By The Contractor . ( Iv ) Tools & Plants Required For Ac Plants Maintenance & Cleaning Of The Premises As As Well As Maintaining Hygen Sanitation As Mentioned In Appendix A Shall Be Provided By Contractor As Required Time To Time And Quoted Unit Rate Shall Be Deemed Included For The Same . ( V ) It Is Contractors Responsibility To Provide Documents Such As Academic & Technical And Insurance Of Each Person Deployed By Contractor . ( Vi ) Cycle Or Any Other Conveyance Required For Supervisor For Supervision Of Installation Shall Also Be Provided By Contractor At His Own Cost . ( Vii ) All Personals Deployed By Contractor Including The Supervisor Will Wear Uniform As Approved By Age ( I ) And An Identity Card Will Be Provided For All The Personals After Due Security Clearances From Security Section Of Station Taken By Contractor . ( Viii ) Reliever For National Holidays/ Sundays Is To Be Provided By Contractor . All T&P For Normal Routine Maintenance Shall Be Provided By Contractor Including Safety Equipments Like Ht Rubber Hand Gloves , Earth Rod , Safety Shoes & Other Tools Etc . ( Ix ) The Deployed/Hired Man Power Shall Be Highly Skilled For Maintenace & Operator To Installed Refg/Dg Set Assest Safely . ( X ) Penality/Recovery Shall Be Made Against Contractors Dues On Non Attending/Rectying The Given Complaint After 30 Minutes Maximum , @ Rs 300/- Per Hours And For Absent From Duty @ Rs 2000/- Per Day Per Person . Duty Timing & Location Rotation Shall Be Followed As Directed . 08 Hours Working Period Measured As One Day For One Person . Per Calender Month Shall Contained 30 Days Each . ( Xi ) Daily Cleaning Of Equipments Such As Ac Plant Installtions , Dg Set , Batteries By Waste Cotton & Sanitary Items , 10 Mtr Wide Sourrounding Area Of Installtions , Cleaned By Brooming & Grass Cutting Etc . ( Xii ) Contractors Quoted Rates Shall Deemed To Included For Aspects/ Provisions As Mentioned In Para ( I ) To ( Xi ) Of The Notes As Mentioned Above .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 16-Jun-2020 Corrigendum No 01 Date 29-06-2020
2 17-Jun-2020 Corrigendum No 02 Other 29-06-2020
3 29-Jun-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 06-07-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 18000.0 /-
Tender Value
INR 9 Lakhs /-

BOQ Items

Name of Work: OUTSOURCING OF CENTRAL AC PLANT AND DG SET INSTALLATION UNDER AGE (I) (AF) MANAURI.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Providing services of 01(ONE) refregeration machanic (Skilled) as AC Plant & DG Set operator for maintenance & operation including routine maintenance with all nature Of dependent services given in shift of T-60 AC Plants and EDP ( Photo firm), AC plant including DG set installed for these plants as directed by the Engineer-in-Charge for all days including SUNDAY/HOLIDAY /GAZZETED HOLIDAYS by deploying of persons (Male) with good Character and discipline, minimum qualification ITI with minimum 03 years of working experience or 12th pass with minimum 05 years trade experience in a reputed firm/organization for refregeration mechanic. \n(a) TIMINGS : Tentative shift timings shall be as under (however it can be changed as per direction issued by AGE(I) time to time):-\n(i) 0800 hrs to 1600 hrs for Ist shift of 08 Hours.\n(ii) 1600 hrs to 2400 hrs for IInd shift of 08 Hours.\n(iii) 2400 hrs to 0800 hrs for IIIrd shift of 08 Hours.\n(b) Location/premises of working place:-\nAt OLD PROJECT and various installations as decided by Engineer-in-Charge- 01 No 11 Per calender \nMonth
2 1.01 Notes for item Nos 1:-\n(i) Contractor shall adhere to minimum wages act, workmen's compensation act, ESI, EPF etc and other relevant laws. The payment of labourers shall be made THROUGH BANKS ACCOUNT/NEFT only and proper record of payment shall be submitted by the contractor at the time of payment of RAR's duly signed. \n(ii) The contractor shall provide minimum one Supervisor to supervise the work of AC Plants installation staff having minimum qualification 12th class pass with knowledge of computer & preparation of reports. The supervisor shall report to the EIC/AGE(I) daily and maintain an attendance of all the staff employed through attendence register.\n(iii) Cost of uniform for the staff employed shall be borne by the contractor.\n(iv) Tools & plants required for AC Plants maintenance & cleaning of the premises as as well as maintaining hygen sanitation as mentioned in Appendix 'A' shall be provided by contractor as required time to time and quoted unit rate shall be deemed included for the same . \n(v) It is contractor's responsibility to provide documents such as academic & technical and Insurance of each person deployed by contractor . \n(vi) Cycle or any other conveyance required for supervisor for supervision of installation shall also be provided by contractor at his own cost.\n(vii) All personals deployed by contractor including the supervisor will wear uniform as approved by AGE(I) and an identity card will be provided for all the personals after due security clearances from security section of station taken by contractor. \n(viii) Reliever for National holidays/ Sundays is to be provided by contractor. All T&P for normal routine maintenance shall be provided by contractor including safety equipments like HT rubber hand gloves, earth rod, safety shoes & other tools etc.\n(ix) The deployed/hired man power shall be highly skilled for maintenace & operator to installed Refg/DG Set assest safely.\n(x) Penality/Recovery shall be made against contractor's dues on non attending/rectying the given complaint after 30 minutes maximum, @ Rs 300/- per hours and for absent from duty @ Rs 2000/- per day per person. Duty timing & location rotation shall be followed as directed. 08 hours working period measured as one day for one person. Per calender month shall contained 30 days each.\n(xi) Daily cleaning of equipments such as AC Plant installtions, DG Set, batteries by waste cotton & sanitary items, 10 mtr wide sourrounding area of installtions, cleaned by brooming & grass cutting etc.\n(xii) Contractor's quoted rates shall deemed to included for aspects/ provisions as mentioned in para (i) to (xi) of the notes as mentioned above. \n\n\n
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail