Public Works Department-PWD has published Improvement/Up Gradation Of Wuyan To Tulbagh Grid Station By Way Of P/L Of 50 Mm Thick Bituminous Macadam And 25 Mm Thick Semidense With 6 Mm Thick Seal Coat ( Wuyan Shar Khrew Ladhoo Pampore Road ) . Submission Date for this Tender is 11-06-2020. Road Work Tenders in wuyan tulbagh Pulwama Jammu And Kashmir. Bidders can get complete Tender details and download the document.
aName of Work: improvement/upgradation of wuyan to tulbagh grid station by way of P/L of 50 mm thick bituminous macadam and 25 mm thick semidense with 6 mm thick seal coat. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified marterial within all lifts and lead upto 1000 meter (by mechanical means) | 1460 | Sqm | |
2 | 2 | Providing, laying, spreading and compacting graded stone spacified grading to wet mix macadam (75 mm) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site for all leads and lifts laying in uniform layers with mechanical paver finisher sub-base/base course and well prepared surface and compacting with vibratory roller of 8-10 tonne capacity to achieve the desired density (clause 406 of MORTH Specifications) | 183.41 | Sqm | |
3 | 3 | Providing and applying tack coat using hot straight run bitumen of grade VG-10 including heating the bitumen with spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road the existing road surface to remove all dirt dust, mud etc finally bromming. (Clause 503 of MoRTH Specification).WBM surface @ 0.75 Kg/Sqm | 2445.5 | Sqm | |
4 | 4 | Providing and laying bituminous macadam 50 mm compacted thick with 100-120 TPH Hot Mix Plant producing an averrage output of 75 tonnes per hour base course with stone agg.of quality size and grading as specified in CPWD specifications and straight run bitumen of grade VG-10 @ 3.3% by weight of total mix including Hot mixing of stone agg. and bitumen in Hot mix plant, transporting mixed material and laying mixed with paver finisher to the required level and grade, rolling with road roller of 8-10 ton capacity to achieve the required compaction and density as per cluse 501.6 and 501.7 (50mm compacted thickness complete) including cost and carriage of all materials involved. (Clause 504 of MORTH Specifications) | 122.27 | Cum | |
5 | 5 | Providing, laying 25mm thick (compacted) semidense bituminous concrete using mineral agg. satisfying the gradation set out in specifications with 4.5 to 5% binder content (by weight of total mix) bitumen of grade VG-10 with the aid of Hot mix plant and paver finisher including rolling with 8-10 Ton capacity to achieve the required compaction and density including cost and carriage of all materials involved.(Clause 508 of MoRTH Specification) | 2445.5 | Sqm | |
6 | 6 | Providing and laying 6mm thick seal coat of premixed fine aggregate (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs of bitumen of grade VG-10 bitumen per cum of fine aggregate (0.768 Kg of bitumen/Sqm) and 0.60 cum of fine aggregate per 100 sqm of road surface incl. rolling and finishing complete including cost and carriage of all materials involved.(Clause 513 of MoRTH Specification) | 2445.5 | Sqm |