Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Testing , Trial Run And Commissioning Of Coal Handling Plant For Dudhichua Ocp Consisting Of All Civil , Structural , Electrical And Mechanical Works As Per Nit A, DUDHICHUA PROJECT-Uttar Pradesh

Northern Coalfields Limited-NCL has published Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Testing , Trial Run And Commissioning Of Coal Handling Plant For Dudhichua Ocp Consisting Of All Civil , Structural , Electrical And Mechanical Works As Per Nit A. Submission Date for this Tender is 05-08-2020. Coal Handling Plant Tenders in DUDHICHUA PROJECT Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24457520
Corrigendum : Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Testing , Trial Run And Commissioning Of Coal Handling Plant For Dudhichua Ocp Consisting Of All Civil , Structural , Electrical And Mechanical Works As Per Nit A
Open Tender
Indian
Uttar Pradesh
DUDHICHUA PROJECT
05-08-2020

Tender Details

Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Testing , Trial Run And Commissioning Of Coal Handling Plant For Dudhichua Ocp Consisting Of All Civil , Structural , Electrical And Mechanical Works As Per Nit As Per Nit

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-Jun-2020 corrI Technical Bid 06-07-2020
2 09-Jun-2020 LINK FOR ATTENDING PREBID THROUGH VC Technical Bid 06-07-2020
3 04-Jul-2020 ADDENDUM Technical Bid 20-07-2020
4 09-Jul-2020 CORRIGENDUM 09072020 Technical Bid 20-07-2020
5 16-Jul-2020 DATE CORRIGENDUM Date 05-08-2020

Key Value

Document Fees
Refer document
EMD
INR 10000000.0 /-
Tender Value
INR 781.63 Crore /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 WORK & SERVICES
2 2 Detailed survey of the area, within the battery limits & submission of reports (Complete work as per Tender document) 1 LS
3 3 Sub soil exploration, field and laboratory testing of samples & submission of reports (Complete work as per Tender document) 1 LS
4 4 Design Engineering Cost
5 5 Preparation and submission of system engineering drawings as per system requirements. 1 LS
6 6 GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works (Complete details of the system) 1 LS
7 7 G.A. & detailed engineering designs and drawings including working and maintenance manuals of (Complete details of the system) : \ni) all individual equipment ( Mechanical & Electricals) \nii) Dust Control & Pressurisation system. \niii) Fire-fighting and plant cleaning system. \niv) Chutes & Liners \nv) Communication system \nvi) Power Supply System\n vii)Illumination system.\n viii) OHE system\nix) Plant control system \nix) Any other system/unit to match the scope of work & requirement\n 1 LS
8 8 Documentation as per tender specification, complete as per scope of works 1 LS
9 9 CIVIL & STRUCTURAL WORKS
10 10 Civil and structural work (Silo, Over ground Bunker, Crushing stations, Conveyor Gantry, Drive & Transfer Houses, Sampler House, etc.)
11 11 Earthwork in cutting in all types of soil and rock 1 LS
12 12 Earthwork in filling 1 LS
13 13 Sand filling 1 LS
14 14 PCC at all levels as per system requirement 1 LS
15 15 RCC (excluding reinforcement) at all levels as per system requirement 1 LS
16 16 Supply, bending, binding and placing of Tor steel in position 1 LS
17 17 Supply, fabrication and erection of structural steel at all levels as per system requirement 1 LS
18 18 Iron profile sheeting at all levels including supply. 1 LS
19 19 Liner as per requirement 1 LS
20 20 Masonary work 1 LS
21 21 Pavement below silo 1 LS
22 22 Modification to existing CHP, Misc. etc. 1 LS
23 23 Developmental work and infra-structure
24 24 CHP Office 1 LS
25 25 Security Office 1 LS
26 26 Substation 1 LS
27 27 Store Shed 1 LS
28 28 Workshop Shed 1 LS
29 29 Store Room 1 LS
30 30 Electrical maintenance room 1 LS
31 31 Pump houses 1 LS
32 32 Car and cycle parking 1 LS
33 33 Landscaping 1 LS
34 34 Water Supply 1 LS
35 35 Ground Water Reservior 1 LS
36 36 Over Head tank 1 LS
37 37 Drainage 1 LS
38 38 Boundary wall 1 LS
39 39 Culvert/Bridge/Tunnel 1 LS
40 40 Road 1 LS
41 41 WBM pavement 1 LS
42 42 OB Slope Stability 1 LS
43 43 C. PLANT & MACHINERY ( SUPPLY)
44 44 C.(a) SUPPLY : MECHANICAL
45 45 CONVEYORS 1 LS
46 46 BELTING 1 LS
47 47 EQUIPMEMT
48 48 Receiving Section Mechanical Equipment 1 LS
49 49 Equipments involved in Secondary Sizing 1 LS
50 50 Mechanical Equipment in Storage Section 1 LS
51 51 Mechanical Equipment at Loading Section 1 LS
52 52 Mechanical Equipment at Transfer house 1 LS
53 53 Mechanical Equipment required for dovetailing in existing system with due modification and installation of total 03 nos. secondary sizers in existing Ph-I & Ph-II CHP 1 LS
54 54 OHE equipment including mechanical, civil and electrical requirements 1 LS
55 55 Other mechanical equipment 1 LS
56 56 Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system , and other misc. equipment/utility for any more item required to complete the project 1 LS
57 57 C.(b) SUPPLY : ELECTRICAL
58 58 Substation-E1
59 59 a) 33 kV Lightning arrestor,Isolator with/without earth switch,outdoor Vacuum Circuit Breaker, outdoor CT & PT, DO fuse etc. As required.\nb) 33/6.6 KV, 5 MVA,ONAN outdoor transformer-2nos. \nc) 6.6 kV Lightning arrestor, Isolators with/without earth switch, outdoor VCB, outdoor CT/PT, DO Fuse etc. as required.\nd) 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\ne) 6.6/0.433 kV, 750 KVA Distribution transformer-2 nos.\nf) 220V Lead Acid Battery complete with Battery Charging unit.-1 no.\ng) 6.6 kV 3 Phase, 3 Wire Switchboard E1-A & E1-B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \nh) 415V,Aluminium Bus-duct as required.\ni) MCC at Substation-E1 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\nj) 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nk)Fire detection, Alarm and Protection system. 1 lot
60 60 Substation-E2
61 61 a) Power receiving arrangement from substation E1 with Lightning Arrester and Isolator with earth switch as required.\nb) 6.6/0.433 kV, 500 KVA Distribution transformer-2nos.\nc) 6.6/0.230 V (L-L), 100 kVALighting Transformer-2nos.\nd) 220V Lead Acid Battery complete with Battery Charging unit.-1 no.\ne) 6.6 kV 3 Phase, 3 Wire Switchboard E2-A & E2-B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \ng) 415V,Aluminium Bus-duct as required.\nh) MCC at Substation-E2 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\ni) 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nj) 6.6 kV Double Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nk) Fire detection, Alarm and Protection system.\n\n\n 1 lot
62 62 Substation-E3
63 63 a) Power receiving arrangement from substation E1 with Lightning Arrester and Isolator with earth switch as required.\nb) 6.6/0.433 kV, 750 KVA Distribution transformer-2nos.\nc) 6.6/0.230 V (L-L), 100 kVA Lighting Transformer-2nos.\nd) 220V Lead Acid Battery complete with Battery Charging unit.-1 no.\ne) 6.6 kV 3 Phase, 3 Wire Switchboard E3-A & E3-B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, metering and protection as required \ng) 415V,Aluminium Bus-duct as required.\nh) MCC at Substation-E3 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\ni) 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nj) 6.6 kV Double Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nk) Fire detection, Alarm and Protection system.\n\n\n 1 lot
64 64 Substation-W1
65 65 a) 33 kV Lightning arrestor,Isolator with/without earth switch,outdoor Vacuum Circuit Breaker, outdoor CT & PT, DO fuse etc. As required.\nb) 33/6.6 KV, 3.15 MVA,ONAN outdoor transformer-2nos. \nc) 6.6 kV Lightning arrestor, Isolators with/without earth switch, outdoor VCB, outdoor CT/PT, DO Fuse etc. as required.\nd) 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\ne) 6.6/0.433 kV, 750 KVA Distribution transformer-2 nos.\nf) 220V Lead Acid Battery complete with Battery Charging unit.-1 no.\ng) 6.6 kV 3 Phase, 3 Wire Switchboard W1-A & W1-B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \nh) 415V,Aluminium Bus-duct as required.\ni) MCC at Substation-W1 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\nj) 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nk)Fire detection, Alarm and Protection system. 1 lot
66 66 Substation-W2
67 67 a) Power receiving arrangement from substation W1 with Lightning Arrester and Isolator with earth switch as required.\nb) 6.6/0.433 kV, 750 KVA Distribution transformer-2nos.\nc) 6.6/0.230 V (L-L), 100 kVALighting Transformer-2nos.\nd) 220V Lead Acid Battery complete with Battery Charging unit.-1 no.\ne) 6.6 kV 3 Phase, 3 Wire Switchboard W2-A & W2-B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \ng) 415V,Aluminium Bus-duct as required.\nh) MCC at Substation-W2 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\ni) 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nj) 6.6 kV Double Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nk) Fire detection, Alarm and Protection system.\n\n\n 1 lot
68 68 Cables
69 69 1) Power Cables\n2)Control & Signalling Cables\n3) Lighting Cables & wires\n4) Communication Cables\n\n 1 LS
70 70 Earthing
71 71 1) Plant Equipment Earthing\n2) Structures Earthing\n3)Earthing for Lightning Protection\n4)Transfromer neutral Earthing 1 LS
72 72 Welding Sockets and Electrical & Diesel Welding Set 1 LS
73 73 PLC System for Control & Automation,Interlocks, Signalling and instrumentation of entire CHP. 1 LS
74 74 Remote and sequence control equipment & Accessories 1 LS
75 75 Cable Trays, Cable Racks, Cable Trenches, Cable Voults etc. 1 LS
76 76 Illumination System and Luminaires, Lighting poles & Towers, Lighting DBs etc. 1 LS
77 77 DG sets for Emergency Power Supply.-5nos. 1 LS
78 78 Exhaust Fan, Ceiling Fan, Air Conditioner, Insulating Mats etc. 1 LS
79 79 Computers and Peripherals 1 LS
80 80 Communication System 1 LS
81 81 CCTV and Camera 1 LS
82 82 Provision for required modification in the existing PH-1 and PH-2 CHP. 1 LS
83 83 Miscellaneous Equipment 1 LS
84 84 C1 . ERECTION, INSTALLATION & COMMISSIONING
85 85 Erection of mechanical equipment 1 Lot
86 86 Erection of electrical equipment 1 Lot
87 87 Erection of other plant and machining etc. 1 Lot
88 88 Trial run, and commissioning of the plant 1 Lot
89 89 Trial run, Testing, and commissioning of the OHE System underneath silo 1 Lot
90 90 C2 . OTHERS ITEM
91 91 Drinking water system consisting of tanks, pipes, valves, taps etc. 1 Lot
92 92 Plant cleaning system 1 As per req.
93 93 Any other item left out for completion of the project 1 LS
94 94 C3 . MAINTENANCE AND TRAINING
95 95 Operation of the plant for five years after commissioning 1 Lot
96 96 Maintenance of the plant for five years after commissioning 1 LS
97 97 Training of the employer personnel as per tender document 1 As per req.
98 98 Total impact of GST for the purpose of CTC 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail