}

Raising Of Block Plantation In Ghmc Open Spaces/Institutions/Lakes Etc In Cir-18,Kz, Ghmc (Estimate-Ii), HYDERABAD-Telangana

Greater Hyderabad Municipal Corporation-GHMC has published Raising Of Block Plantation In Ghmc Open Spaces/Institutions/Lakes Etc In Cir-18,Kz, Ghmc (Estimate-Ii). Submission Date for this Tender is 08-06-2020. Plantation Work Tenders in HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

24453512
Raising Of Block Plantation In Ghmc Open Spaces/Institutions/Lakes Etc In Cir-18,Kz, Ghmc (Estimate-Ii)
Open Tender
Indian
Telangana
HYDERABAD
08-06-2020

Tender Details

Raising Of Block Plantation In Ghmc Open Spaces/Institutions/Lakes Etc In Cir-18,Kz, Ghmc (Estimate-Ii)

Key Value

Document Fees
Refer document
EMD
INR 73318.0 /-
Tender Value
INR 29.32 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Raising of Block Plantation Misc 1.00 Ls 1.00 98.32
Miscellaneous
2 Raising of Block Plantation As per 1.00 Ls 1.00 314207.32
Add GST 12%
3 Raising of Block Plantation 77 (b) 6000.00 100 Nos 505.31 363823.20
Protection, maintenance, tending the plants upkeep the fencing & removal of unwanted growth for a period of 12 months (Watcher to be engaged, Name of the watcher to be reported and payment to be made in the Bank A/c of the Watcher)
4 Raising of Block Plantation 76.0 355.20 Each Tanker 3352.30 1190736.96
Cost and supply of water @ 20 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity (5 trips per day - 25000 Ltrs) total (50 waterings from July 2020 to March 2021) & (24 waterings from April 2021 to June 2021) Total - 74 waterings (Watering schedule/Log book should be maintained mandatorily)
5 Raising of Block Plantation 75 (b) 6000.00 100 Nos 482.81 28968.60
2nd Soil working 10 cms deep using crowbars to a radius of 50 cms around the plant in Oct/Nov
6 Raising of Block Plantation 75 (a) 6000.00 100 Nos 160.94 9656.40
2nd Circular weeding without application of fertilizers to a radius of 50 cms around the plant in Oct/Noc
7 Raising of Block Plantation 74 (b) 6000.00 100 Nos 482.81 28968.60
1st Soil working 10 cms deep using crowbars to a radius of 50 cms around the plant in August /Sept
8 Raising of Block Plantation 74 (a) 6000.00 100 Nos 160.94 9656.40
1st Circular weeding without application of fertilizers to a radius of 50 cms around the plant in August/Sept
9 Raising of Block Plantation 72.0 1200.00 100 Nos 2261.00 27132.00
Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"X10" / 10"x16" bag Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities durin gthe year, the Contractor agency has to be planted to the extent of dead at his own cost and must show 100% survival
10 Raising of Block Plantation 71 (c ) 6000.00 100 Nos (2 dose 293.92 17635.20
Application of chemicals and fertilizers/Neem Cake etc (2 doses)
11 Raising of Block Plantation 71 (a) 240.00 Kg 50.00 12000.00
Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
12 Raising of Block Plantation 70 (b) 6000.00 100 Nos 57.10 3426.00
Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
13 Raising of Block Plantation 70 (a) 120.00 Kg 35.00 4200.00
Cost of Folidol/Lindane dust (10%) @ 20 gms/pit
14 Raising of Block Plantation 69 ( C) 6000.00 Each 28.00 168000.00
cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
15 Raising of Block Plantation 69 (b) 6000.00 100 Nos 2139.20 128352.00
Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil
16 Raising of Block Plantation 68 (b) 6000.00 100 Nos 198.80 11928.00
Internal transporation of Bag plants to planting site
17 Raising of Block Plantation 67 (ii) b 6000.00 100 Nos 10.58 3174.00
Over and above 3 Km lead add following rates per km per 100 Plants = Average 5 Km extra
18 Raising of Block Plantation 67 (i) b 6000.00 100 Nos 542.19 32531.40
Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (8"x10" bag size)
19 Raising of Block Plantation 65 (a) 6000.00 100 Nos 247.46 14847.60
Application of FYM including internal distribution in red soil areas 60 cm pit
20 Raising of Block Plantation 66 (a) 6000.00 100 Nos 2558.73 153523.80
Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
21 Raising of Block Plantation 64 (b) 6000.00 100 Nos 6761.22 405673.20
Digging of pits 0.60 mt X 0.60 mt X 0.60 mt
22 Raising of Block Plantation 63.0 6000.00 100 Nos 69.35 4161.00
Alignment and staking including cost of stakes
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail