Madhyanchal Vidut Vitran Nigam Limited has published Replacement Of Damaged And Pcc/St Pole , Jurjar Conductor And Resagging Of Loose Conductor At Area Of Sub-Division Fesu-1 , Fesu-2 And Ayodhya Under Jurisdiction Of Electricity Distribution Division-Ist , Ayodhya. Submission Date for this Tender is 06-06-2020. Cable Laying Tenders in Ayodhya Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Replacement of Damaged and PCC/ST Pole, Jurjar Conductor and Resagging of loose conductor at area of Sub-Division Fesu-1, Fesu-2 and Ayodhya under Jurisdiction of Electricity Distribution Division-Ist, Ayodhya | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Cartage of following stock material from Store Center Darshan Nagar to work site including loading, unloading and proper Stacking. | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | PCC Pole 8.5 Mtr. Long | BI01010001010000000000000515BI0100001113 | 70 | Nos. |
3 | 1.02 | ST Pole 9 mtr. long | BI01010001010000000000000515BI0100001114 | 20 | Nos. |
4 | 1.03 | ACSR weasel Conductor | BI01010001010000000000000515BI0100001115 | 2 | Kms. |
5 | 1.04 | AB Cable | BI01010001010000000000000515BI0100001116 | 1.5 | Kms. |
6 | 1.05 | Other matching Materials | 1 | M.T. | |
7 | 2 | Fabrication and Errection of Singal Pole Support on 8.5 mtr. PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamps as per RESPO Norms. (Cost of clamps borne by contractor) | 60 | Nos. | |
8 | 3 | Fabrication and Errection of Double Pole Support on 8.5 mtr. PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamps as per RESPO Norms. (Cost of clamps borne by contractor) | 5 | Nos. | |
9 | 4 | Fabrication and Errection of Singal Pole Support on 9.0 mtr. ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamps as per RESPO Norms. (Cost of clamps borne by contractor) | 10 | Nos. | |
10 | 5 | Fabrication and Errection of Double Pole Support on 9.0 mtr. ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamps as per RESPO Norms. (Cost of clamps borne by contractor) | 5 | Nos. | |
11 | 6 | Resagging of loose H.T./L.T. line conductor after opening of binding from L.T. Shackle insulator/ pin insulatorand opening of jumpering and then after tightening of conductor on other same. Requirement of damaged/ free fastener. | 90 | Span | |
12 | 7 | Strenthening of tilted pole after opening of binding from L.T. Shackle insulator and opening of jumpering and then after tightening of conductor . | 40 | Nos. | |
13 | 8 | Stringing, Sagging, binding and jumpering of ACSR Weasel as per RESSPO Norms | 0.68 | Ckt Kms. | |
14 | 9 | Stringing, Sagging, Binding and jumpering of Three Phase AB Conductor with help of all type of Clamp (Cost of Clamp Shall be borne by the Contractor. | 1.5 | Kms. | |
15 | 10 | Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms | 20 | Nos. | |
16 | 11 | Cutting of Tree Brances way of the line | 45 | Job |