Water Resources Department-WRD has published Repairing Of Damaged Banks And Raising Of Unda Aqueduct Wall Of Lmc Of Parwan Lift Scheme. Submission Date for this Tender is 04-06-2020. Canal Construction Tenders in baran Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: Repairing of damaged banks and raising of Unda Aqueduct wall of LMC of Parwan Lift Scheme | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | BI01010001010000000000000515BI0100001112 | 1588.55 | Per Cum |
2 | 2 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering,shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40mm. | BI01010001010000000000000515BI0100001113 | 21.67 | Per Cum |
3 | 3 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering,\nshuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm | BI01010001010000000000000515BI0100001114 | 107.22 | Per Cum |
4 | 4 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | BI01010001010000000000000515BI0100001115 | 526.26 | Per Kg |
5 | 5 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down-stream slope facings of dams and open faces of construction joints etc. | BI01010001010000000000000515BI0100001116 | 247.79 | Per Sqm |
6 | 6 | Extra labour charges for RCC due to obstruction in laying and placingthe reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | BI01010001010000000000000515BI0100001117 | 101.31 | Per Cum |
7 | 7 | Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect Earth / Soil | BI01010001010000000000000515BI0100001118 | 144.14 | Per Cum |
8 | 8 | Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 1.5m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in\nall respect. | BI01010001010000000000000515BI0100001119 | 735.56 | Per Cum |
9 | 9 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | BI01010001010000000000000515BI0100001120 | 975.8 | Per Cum |
10 | 10 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) | BI01010001010000000000000515BI0100001121 | 975.8 | Per Cum |
11 | 11 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5 Masonry work in superstructure | BI01010001010000000000000515BI0100001122 | 7.12 | Per Cum |
12 | 12 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. | BI01010001010000000000000515BI0100001123 | 33.6 | Per Sqm |
13 | 13 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20mm | BI01010001010000000000000515BI0100001124 | 101.77 | Per Sqm |