Rashtriya Chemicals And Fertilizers Limited-RCF has published Dismantling , Fabrication , Erection And Commissioning Of Urea Et-4 , Et-7 And Anp Et- 7 Conveyor Systems In Bagging Plant Of Rcf Tromaby Unit . . Submission Date for this Tender is 03-06-2020. Miscellaneous Fasteners Tenders in MES DEPT ROOM NO 25 ADMIN Maharashtra. Bidders can get complete Tender details and download the document.
Name of Work :Dismantling, fabrication, erection & commissioning of Urea ET-4, ET-7 & ANP ET- 7 conveyor systems in Bagging plant of RCF Tromaby Unit. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | JOB I) - Dismantling, Fabrication, Erection & Commissioning Of ET- 4 Conveyor System Of Urea Bagging Plant In Trombay Unit Of RCF. | |||
2 | 1.1 | Dismantling /Removal of old conveyor structure , frames, rollers, G/B & Motor Foundation, ducts etc of Urea ET-4 as per scope of work | 10 | MT | |
3 | 1.2 | Fabrication, erection and commissioning of conveyor structure, Gearbox & Motor foundation, Head, Tail &Take up pulley structure, transfer chutes of Urea ET- 4 conveyor as per scope of work. | 12 | MT | |
4 | 1.3 | Installation of Head Pulley, Tail pulley, bend pulleys (2 Nos), Take-up Pulley, Snub pulleys (2 Nos), troughing & return frames (90 & 30 respectively) and rollers, Gear box with motor, and load cells etc. of Urea ET-4 conveyor as per scope of work. (Supply & installation of 16 nos. anchor fasteners, size M-16 is in Party scope) | 1 | LUMSUM | |
5 | 1.4 | Fabrication & erection of hand railing & toe guard for Urea ET-4 Conveyor | 600 | METER | |
6 | 2 | JOB II) Dismantling, Fabrication, Erection & Commissioning Of ET- 7 Conveyor System Of Urea Bagging Plant In Trombay Unit Of RCF. | |||
7 | 2.1 | Dismantling /Removal of old conveyor structure , frames, rollers, G/B & Motor Foundation, ducts etc of Urea ET-7 as per scope of work | 10 | MT | |
8 | 2.2 | Fabrication, erection and commissioning of conveyor structure, Gearbox & Motor foundation, Head, Tail &Take up pulley structure, transfer chutes of Urea ET- 7 conveyor as per scope of work. | 12 | MT | |
9 | 2.3 | Installation of Head Pulley, Tail pulley, bend pulleys (2 Nos), Take-up Pulley, Snub pulleys (2 Nos), troughing & return frames (90 & 30 respectively) and rollers, Gear box with motor, and load cells etc. of Urea ET-7 conveyor as per scope of work. (Supply & installation of 16 nos. anchor fasteners, size M-16 is in Party scope) | 1 | LUMSUM | |
10 | 2.4 | Fabrication & erection of hand railing & toe guard for Urea ET-7 Conveyor | 600 | METER | |
11 | 3 | JOB III) Dismantling, Fabrication, Erection & Commissioning Of Approximately 30 Meter Conveyor Stringer & Tail Pulley Structure With Discharge Chute Of ANP ET -7 In ANP Bagging Plant, Trombay Unit Of RCF. | |||
12 | 3.1 | Conveyor Dismantling /Removal of old conveyor structure , frames, rollers, ducts etc. of ANP ET-7 as per scope of work | 5 | MT | |
13 | 3.2 | Fabrication, erection and commissioning of conveyor structure, Tail pulley structure, transfer chutes of ANP ET- 7 conveyor as per scope of work. | 6 | MT | |
14 | 3.3 | Installation of Tail pulley, Snub pulleys, Troughing & return frames (30 & 10 respectively) and rollers etc. of ANP ET-7 conveyor as per scope of work. (Supply & installation of 16 nos. anchor fasteners, size M-16 is in Party scope) | 1 | LUMSUM | |
15 | 3.4 | Fabrication & erection of hand railing & toe guard for ANP ET-7 Conveyor | 120 | METER |