Bharat Sanchar Nigam Limited-BSNL has published Tender For Ug Cable Laying And Allied Works In Am Rural Area Of Jaipur Ssa. Submission Date for this Tender is 09-06-2020. Road Work Tenders in AM Rural Area of Jaipur SSA Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work: UG CABLE LAYING & ALLIED WORKS IN Rural area OF JAIPUR SSA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | TRENCHING:-Excavating trenches of A Type Including back filling, Compacting (after laying the cable(s) and removing excess earth from site (for 100 cm depth) | BI01010001010000000000000515BI0100001115 | ||
2 | 1.01 | In Non Surface Strata | BI01010001010000000000000515BI0100001116 | ||
3 | 1.02 | All kind of soil | BI01010001010000000000000515BI0100001117 | 3490 | Per meter |
4 | 1.03 | Sufaced Strata | BI01010001010000000000000515BI0100001118 | ||
5 | 1.04 | Footpaths | BI01010001010000000000000515BI0100001119 | ||
6 | 1.05 | Tarmac/Asphalt | BI01010001010000000000000515BI0100001120 | 300 | Per meter |
7 | 1.06 | Kharanja | BI01010001010000000000000515BI0100001121 | 100 | Per meter |
8 | 1.07 | Tiled | BI01010001010000000000000515BI0100001122 | 100 | Per meter |
9 | 1.08 | Cement concrete | BI01010001010000000000000515BI0100001123 | 250 | Per meter |
10 | 1.09 | Along Road side | BI01010001010000000000000515BI0100001124 | ||
11 | 1.1 | Tarmac/Asphalt | BI01010001010000000000000515BI0100001125 | 3000 | Per meter |
12 | 1.11 | Cement concrete | BI01010001010000000000000515BI0100001126 | 970 | Per meter |
13 | 1.12 | Road Crossing | BI01010001010000000000000515BI0100001127 | ||
14 | 1.13 | Tarmac/Asphalt | BI01010001010000000000000515BI0100001128 | 1480 | Per meter |
15 | 1.14 | Kharanja | BI01010001010000000000000515BI0100001129 | 50 | Per meter |
16 | 1.15 | Tiled/Cement concrete | BI01010001010000000000000515BI0100001130 | 580 | Per meter |
17 | 2 | Boring | BI01010001010000000000000515BI0100001131 | ||
18 | 2.01 | Road crossing through mechanised horizontal boring (40/65/120 mm Dia.) method The minimum depth of cable pulled/laid will be 100 cm. for more than 18 meter wide road crossings only | BI01010001010000000000000515BI0100001132 | 1800 | Per meter |
19 | 2.02 | Horizontal boring by manual moling of 40/65/110 mm Dia at depth of 100 cm depth. | BI01010001010000000000000515BI0100001133 | 1640 | Per meter |
20 | 3 | Laying & fixing of GI Pipes on bridges & culverts. (The department will supply only GI Pipes in length of approximately 6meters) | BI01010001010000000000000515BI0100001134 | ||
21 | 3.01 | Upto 40 mm dia | BI01010001010000000000000515BI0100001135 | 100 | Per meter |
22 | 3.02 | above 80 mm dia | BI01010001010000000000000515BI0100001136 | 10 | Per meter |
23 | 4 | Cable laying/Recovery/Protection | BI01010001010000000000000515BI0100001137 | ||
24 | 4.01 | Pulling & laying U/G cables in Trenches, boring/molinigs & pipes (The department will supply only U.G.Cables) | BI01010001010000000000000515BI0100001138 | ||
25 | 4.02 | 100/200 Pairs | BI01010001010000000000000515BI0100001139 | 7610 | Per meter |
26 | 4.03 | 400 Pairs | BI01010001010000000000000515BI0100001140 | 3050 | Per meter |
27 | 4.04 | 800 Pairs | BI01010001010000000000000515BI0100001141 | 1570 | Per meter |
28 | 5 | Recovery of old Directly burried cables/Pipes | BI01010001010000000000000515BI0100001142 | ||
29 | 5.01 | Upto 50 Pairs | BI01010001010000000000000515BI0100001143 | 1500 | Per meter |
30 | 5.02 | 100/200 Pairs | BI01010001010000000000000515BI0100001144 | 2150 | Per meter |
31 | 6 | Jointing of cables:- (Straight and Branch Joints) and end to end Testing. | BI01010001010000000000000515BI0100001145 | ||
32 | 6.01 | 100 Pairs | BI01010001010000000000000515BI0100001146 | 205 | Per Joint |
33 | 6.02 | 200 Pairs | BI01010001010000000000000515BI0100001147 | 119 | Per Joint |
34 | 6.03 | 400 Pairs | BI01010001010000000000000515BI0100001148 | 42 | Per Joint |
35 | 6.04 | 800 Pairs | BI01010001010000000000000515BI0100001149 | 30 | Per Joint |
36 | 7 | Pillar work:- Construction /Shifting of new pillar/cabinet of Plinth and earthing for Pillar(with matterial).In construction a cement,sand,concreate plinth with ratio 1:2:4 with plingth painting & making earth including cost of copper wire & G.I Plate | BI01010001010000000000000515BI0100001150 | ||
37 | 7.01 | Mini Pillar up to 400 pairs | BI01010001010000000000000515BI0100001151 | 17 | Per Pillar |
38 | 7.02 | above 400 pairs and up to 1000 pairs | BI01010001010000000000000515BI0100001152 | 18 | Per Pillar |
39 | 7.03 | Above 1000 pairs | BI01010001010000000000000515BI0100001153 | 8 | Per Pillar |
40 | 8 | Erection, Painting and Sign Writing of Pillars | BI01010001010000000000000515BI0100001154 | ||
41 | 8.01 | Upto 400 pairs | BI01010001010000000000000515BI0100001155 | 12 | Per Pillar |
42 | 8.02 | Above 400 pairs | BI01010001010000000000000515BI0100001156 | 14 | Per Pillar |
43 | 9 | Painting of existing cabinet/pillar and sign writing on pillar (with BSNL logo in colour with material A class paint) | BI01010001010000000000000515BI0100001157 | ||
44 | 9.01 | For Mini Pillar (Only painting and sign writing pillar no) | BI01010001010000000000000515BI0100001158 | 17 | Per Pillar |
45 | 9.02 | For Pillar/Cabinet upto 1000 pairs | BI01010001010000000000000515BI0100001159 | 90 | Per Pillar |
46 | 9.03 | For Pillar/Cabinet above1000 pairs | BI01010001010000000000000515BI0100001160 | 12 | Per Pillar |
47 | 9.04 | Termination of Cables on MDF/ Pillars | BI01010001010000000000000515BI0100001161 | 174 | Per 100 Pairs |
48 | 9.05 | Pillar rearrangement by doing straight jumpering including documentation (One jumper means jumpering of one pair from primary side to one pair of distribution side in the pillar) | BI01010001010000000000000515BI0100001162 | 11500 | Per Jumper |
49 | 10 | Other maintenance items (Only for Mtce. tender) | BI01010001010000000000000515BI0100001163 | ||
50 | 10.01 | Excavation pits for cable joints ( In all kind of soil) size of pits (1.2 X 1.2 X 1.2 metre.) | BI01010001010000000000000515BI0100001164 | 605 | Per Pit |
51 | 10.02 | Preparation for cable joints for preparation of cable and testing including opening and closing of joints | BI01010001010000000000000515BI0100001165 | ||
52 | 10.03 | ( 1 ) Up to 100 pairs | BI01010001010000000000000515BI0100001166 | 315 | Per Joint |
53 | 10.04 | ( 2 ) Up to 200 pairs | BI01010001010000000000000515BI0100001167 | 168 | Per Joint |
54 | 10.05 | ( 3 ) Up to 400 pairs | BI01010001010000000000000515BI0100001168 | 73 | Per Joint |
55 | 10.06 | ( 4 ) Above 400 pairs | BI01010001010000000000000515BI0100001169 | 49 | Per Joint |
56 | 11 | Cleaning of pillars inside and outside, removal of posters. | BI01010001010000000000000515BI0100001170 | ||
57 | 11.01 | ( 1 ) Up to 200 pairs | BI01010001010000000000000515BI0100001171 | 38 | Per Pillar |
58 | 11.02 | ( 2 ) Above 200 pairs | BI01010001010000000000000515BI0100001172 | 83 | Per Pillar |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail