}

Dgps Survey And Physical Verification Of Land Of Stations Under The Vsr Region Of Ntpc Dgps Survey And Physical Verification Of Land Of Stations In The Vsr Region Of Ntpc Namely Ntpc Rihand Ntpc Singrauli Ntpc Vindhyachal, EOC Noida Office EOC, SECTOR-24, NOIDA 201301-Uttar Pradesh

National Thermal Power Corporation Limited has published Dgps Survey And Physical Verification Of Land Of Stations Under The Vsr Region Of Ntpc Dgps Survey And Physical Verification Of Land Of Stations In The Vsr Region Of Ntpc Namely Ntpc Rihand Ntpc Singrauli Ntpc Vindhyachal. Submission Date for this Tender is 08-06-2020. DGPS Survey Tenders in EOC Noida Office EOC, SECTOR-24, NOIDA 201301 Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24283219
Corrigendum : Dgps Survey And Physical Verification Of Land Of Stations Under The Vsr Region Of Ntpc Dgps Survey And Physical Verification Of Land Of Stations In The Vsr Region Of Ntpc Namely Ntpc Rihand Ntpc Singrauli Ntpc Vindhyachal
Open Tender
Indian
Uttar Pradesh
EOC Noida Office EOC, SECTOR-24, NOIDA 201301
08-06-2020

Tender Details

Dgps Survey And Physical Verification Of Land Of Stations Under The Vsr Region Of Ntpc Dgps Survey And Physical Verification Of Land Of Stations In The Vsr Region Of Ntpc Namely Ntpc Rihand Ntpc Singrauli Ntpc Vindhyachal , Dgps Survey & Physical Verification:Sig , Area Survey Of Whole Project Area ( Viz . Plant , Townships , Ash Dyke , Railway Corridor , Ash Pipe Corridor Etc . Separately As Per Identification/Location ) , Marking Dgps Co-Ordinates& Levels Of At Interval Of 100 M Or Part Thereof And Corners ( Of Bend 60 Degree Or Less ) Along The Boundary Line & As Per Instructions Of Engineer-In-Charge ( Eic ) , Through DgpsEquipments As Per Specification In Appendix 1 Or Combination Of Dgps And Total Station . To Collect Details Of Khasra / Khatoni Maps From Revenue Authorities And Plot The Same On The Revenue Map ( As Converted Digitally Before Start Of Survey ) . The Same Has To BeModified Putting The Boundary Line Of Area In Occupation , As Also Area In Adverse Possession After Completion Of Survey . These Areas Have To Be Color Coded Seperately On TheBasis Of:1 . Type Of Land Wise ( Private , Govt . , Forest , Departmental , Direct Purchase ) . 2 . Possession ( Land In Possession Of Ntpc , Adverse Possession ) 3 . Utilization Wise ( Main Plant , Ash Dyke , Township Etc . ) . In Addition , Area Chart Capturing The Details Of Following Has To Be Prepared As Per Format Given In Table-A Of Appendix-Ii :1 . Type Of Land Wise ( Private , Govt . , Forest , Departmental , Direct Purchase ) . 2 . Possession ( Land In Possession Of Ntpc , Adverse Possession ) 3 . Utilization Wise ( Main Plant , Ash Dyke , Township Etc . ) . Preparing & Submitting A Comparative Statement Of Land As Per Acquisition Plan & Actual Physical Possession In A Tabular Format & Highlighting Excess/Shortfall/Encroachment Area , And As Per Format Given In Table-B Of Appendix-IiPreparing & Submitting Auto Cad Drawing/Reports & Shape/Kmz Files Etc As Per Technical Specifications/Requirements ( Clause 2 To 11 ) & As Per Instructions Of Engineer-In-Charge ( Eic ) . In Addition All The Survey Details Are To Be Superimposed Upon Latest Google Earth Map Alongwith Kmz Files For Area Of Utilization Wise Viz Main Plant , Ash Dyke , Etc With A CompositeSuperimposed Map For The Entire Project . , Detailed Survey ( Door To Door ) And Report On Land Parcel /Colonies Under Un-Authorized Encroachment As Per Format Given In Table-C Of Appendix-Ii . Marking/Showing The Encroachment Area , If Any , Separately On The Autocad Drawings As Well As On Google Earth Map ( Kmz Files ) . ( Note: Payment Against This Item Shall Be Made For The Area Actually Found To Be Already Encroached , While Carrying Out Survey Against The Above Item & Agreed Upon By Eic ) , Detailed Survey Of Project Area Earmarked , Marking Identification Marks Of All The Existing Visible Structures / Features Like Buildings , Roads , Drains , Pipe-Racks , Stacks , Tanks , Dyke , Water Reservoir , Water Channel , Coal Stock , Stadium , Open Area , Green Area , Electric , Telephone Line With Poles , Sheds , Temples , Ground Coverage , Boundary Walls , Tree , ManholesAnd Any Other Structure Etc In Auto Cad Drawing . Calculating Actual Area Of Plot And Marking Boundary Line And Showing Breakup Total Area As Per Land Use Pattern Viz . Buildings , Parks , Roads , Railway Line , Pipe Corridor , Reservoir , Green Belt , Ash Dyke , Open Space Etc . For The Whole Area , Where Detailed Survey To Be Done As Per Format Given In Table-D Of Appendix-IiTaking Spot Levels/Plinth Levels Of Existing Building , And Height Of Any Other Prominent Structure , Internal And Adjoining Roads Level , Culverts , Manholes Etc & Marking The ReducedLevels On The Survey Drawings/Reports . The Report Should Include Details Of Built-Up Units And Measuring The Plinth Area In Tabular Form And Correlating With The Correspoding Structure Marked In Drawing . , Construction And Installation Of Permanent Reference Pcc Pillars ( 1:2:4 ) ( Size 400X400x750 Mm Depth With Additional Tapering At The Top Upto 150 Mm Above ( 450 Mm BelowGround Level ) ) Of Approved Specifications & Drawings ( Appendix-Iv ) And At Interval Of 100 M And Part Thereof And Corners ( Having Bend Of 60 Degree Or Less ) , Including NecessaryExcavation And Backfill , As Per Direction Of Engineer-In -Charge . These Pillars Shall Be Labeled Permanently With Their Identification Marks , Respective Gps Coordinates AndReduced Levels For Future Use Alonwith Ntpc Name Engraved On It . The Pillars Should Be Painted With Synthetic Enamel . The Pillars Shall Also Be Shown On The SurveyDrawings/Google Earth . ( Note: All Materials & Labour For This Work Shall Be Arranged By The Surveying Agaency ) , Dgps Survey & Physical Verification:Riha , Area Survey Of Whole Project Area ( Viz . Plant , Townships , Ash Dyke , Railway Corridor , Ash Pipe Corridor Etc . Separately As Per Identification/Location ) , Marking Dgps Co-Ordinates& Levels Of At Interval Of 100 M Or Part Thereof And Corners ( Of Bend 60 Degree Or Less ) Along The Boundary Line & As Per Instructions Of Engineer-In-Charge ( Eic ) , Through DgpsEquipments As Per Specification In Appendix 1 Or Combination Of Dgps And Total Station . To Collect Details Of Khasra / Khatoni Maps From Revenue Authorities And Plot The Same On The Revenue Map ( As Converted Digitally Before Start Of Survey ) . The Same Has To BeModified Putting The Boundary Line Of Area In Occupation , As Also Area In Adverse Possession After Completion Of Survey . These Areas Have To Be Color Coded Seperately On TheBasis Of:1 . Type Of Land Wise ( Private , Govt . , Forest , Departmental , Direct Purchase ) . 2 . Possession ( Land In Possession Of Ntpc , Adverse Possession ) 3 . Utilization Wise ( Main Plant , Ash Dyke , Township Etc . ) . In Addition , Area Chart Capturing The Details Of Following Has To Be Prepared As Per Format Given In Table-A Of Appendix-Ii :1 . Type Of Land Wise ( Private , Govt . , Forest , Departmental , Direct Purchase ) . 2 . Possession ( Land In Possession Of Ntpc , Adverse Possession ) 3 . Utilization Wise ( Main Plant , Ash Dyke , Township Etc . ) . Preparing & Submitting A Comparative Statement Of Land As Per Acquisition Plan & Actual Physical Possession In A Tabular Format & Highlighting Excess/Shortfall/Encroachment Area , And As Per Format Given In Table-B Of Appendix-IiPreparing & Submitting Auto Cad Drawing/Reports & Shape/Kmz Files Etc As Per Technical Specifications/Requirements ( Clause 2 To 11 ) & As Per Instructions Of Engineer-In-Charge ( Eic ) . In Addition All The Survey Details Are To Be Superimposed Upon Latest Google Earth Map Alongwith Kmz Files For Area Of Utilization Wise Viz Main Plant , Ash Dyke , Etc With A CompositeSuperimposed Map For The Entire Project . , Detailed Survey ( Door To Door ) And Report On Land Parcel /Colonies Under Un-Authorized Encroachment As Per Format Given In Table-C Of Appendix-Ii . Marking/Showing The Encroachment Area , If Any , Separately On The Autocad Drawings As Well As On Google Earth Map ( Kmz Files ) . ( Note: Payment Against This Item Shall Be Made For The Area Actually Found To Be Already Encroached , While Carrying Out Survey Against The Above Item & Agreed Upon By Eic ) , Detailed Survey Of Project Area Earmarked , Marking Identification Marks Of All The Existing Visible Structures / Features Like Buildings , Roads , Drains , Pipe-Racks , Stacks , Tanks , Dyke , Water Reservoir , Water Channel , Coal Stock , Stadium , Open Area , Green Area , Electric , Telephone Line With Poles , Sheds , Temples , Ground Coverage , Boundary Walls , Tree , ManholesAnd Any Other Structure Etc In Auto Cad Drawing . Calculating Actual Area Of Plot And Marking Boundary L

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-May-2020 BOD EXTENSION Date 08-06-2020
2 28-May-2020 Stop GAP Arrangement Other 08-06-2020

Key Value

Document Fees
INR 900 /-
EMD
INR 100000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail