North Eastern Railways-NER has published Construction Of Cannal Bridge No. 93/A By Open Web Girder (1X61.0 M) At Km 125/1-2 Between Barhni - Pachperwa Stations Of Anand Nagar - Gonda Section In Lucknow Division Of N.E. Railway.. Submission Date for this Tender is 29-04-2020. Bridge Work Tenders in Uttar Pradesh. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item\rCode | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit |
1 | Schedule A-ERECTION AND LAUNCHING OF GIRDER | 15222711.70 | |||||||
2 | 1 | a | 8.81 | MT | 87285.55 | 768985.70 | 0.00 | 768985.70 | Above/\rBelow/Par |
3 | Description:- Fabrication, Transportation, Supplying and Stacking of Side Pathway, inspection ladders & man\rrefuses on O.W.G. for Br. No. 93A (1X61.0 m Span) at CANNAL at Km 125/1-2 between Barhni - Pachperwa\rstations, Anand Nagar - Gonda section of LJN division as per RDSO Drg. No. CBS-0045 (with latest alterations) as\rper standard specification for fabrication of steel bridge girders i.e. B-1/2001 (As per corrected up-to-date) & M.S.\rladders on both side of girders to reach on piers/ abutment as per site conditions with contractor's own labour,\rmaterials, consumables, fuel, tools & plants etc. with initial one coat of ready mixed paint zinc chromate priming to\rIS: 104 followed by one coat of ready mixed paint red oxide zinc chrome priming paint to IS: 2074 and one coat of\rpaint Aluminum to IS:2339 of approved quality as directed by Engineer-in-charge or his representative at site. | ||||||||
4 | 2 | b | 240.00 | MT | 149.33 | 35839.20 | 0.00 | 35839.20 | Above/\rBelow/Par |
5 | Description:- Transportation\rof01spanof61.0mOWGsteelbridgecomponentsfromBridgeWorkshop,\rGorakhpur cantt to site of Br No. 93A at Km 125/1-2 between Barhni - Pachperwa stations of LJN Division of NE\rRailway by contractor's Road Vehicle (Truck/Trailers) as required including proper handling, re-handling, crossing\roftrackobstructions,loading,unloading,stackingatsiteandsecurityarrangementandallincidental\rcharges.Loading, unloading and stacking, lead up to 5 Km. | ||||||||
6 | 3 | c | 1200.00 | MT-Km | 11.25 | 13500.00 | 0.00 | 13500.00 | Above/\rBelow/Par |
7 | Description:- Extra to above item no 2 for additional Beyond 5 Km upto 10 Km. per Km. | ||||||||
8 | 4 | d | 2400.00 | MT-Km | 9.34 | 22416.00 | 0.00 | 22416.00 | Above/\rBelow/Par |
9 | Description:- Extra to above items no 2 &3 for additional Beyond 10 Km upto 20 Km. per Km. | ||||||||
10 | 5 | e | 26400.00 | MT-Km | 7.72 | 203808.00 | 0.00 | 203808.00 | Above/\rBelow/Par |
11 | Description:- Extra to above items no 2, 3 & 4 for additional Beyond 20 Km per additional Km. | ||||||||
12 | f | 240.00 | MT | 43197.50 | 10367400.00 | 0.00 | 10367400.00 | Above/\rBelow/Par |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy