Rural Development Department has published Constructing Popat Sadashiv Jagtap Sarswati To Lohar Doh Palasdeo Talav Road At Rui , Tal Indapur. Submission Date for this Tender is 18-04-2020. Road Work Tenders in PUNE Maharashtra. Bidders can get complete Tender details and download the document.
Name of Work: 25Constructing Popat Sadashiv Jagtap Sarswati to Lohar Doh Palasdeo Talav Road At Rui , Tal Indapur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Item No. 1: Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | BI01010001010000000000000515BI0100001113 | 600 | Square Meter |
2 | 2 | Item No. 2: Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete. (Material obtained from departmental Land) | BI01010001010000000000000515BI0100001114 | 575 | Cubic Meter |
3 | 3 | Item No. 3: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2) mm Aggregate) | BI01010001010000000000000515BI0100001115 | 247.5 | Cubic Meter |
4 | 4 | Item No. 4: Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | BI01010001010000000000000515BI0100001116 | 67.5 | Cubic Meter |
5 | 5 | Item No. 5: Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | BI01010001010000000000000515BI0100001117 | 67.5 | Cubic Meter |
6 | 6 | Item No. 6: Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | BI01010001010000000000000515BI0100001118 | 450 | Square Meter |
7 | 7 | Item No. 7: Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. | BI01010001010000000000000515BI0100001119 | 5 | Running Meter |
8 | 8 | Item No. 8: Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge | BI01010001010000000000000515BI0100001120 | 1 | Number |
9 | 9 | Item No. 9: BASIC TEST OF AGGREGATE. Sieve Analysis. | BI01010001010000000000000515BI0100001121 | 1 | One Test |
10 | 10 | Item No. 10: BASIC TEST OF AGGREGATE. Water Absorption, Specific Gravity.Impact Value Crushing Value. | BI01010001010000000000000515BI0100001122 | 1 | One Test |
11 | 11 | Item No. 11: SOIL / MURUM Sieve Analysis. | BI01010001010000000000000515BI0100001123 | 2 | One Test |
12 | 12 | Item No. 12: SOIL / MURUM Liquid limit & plastic Limit. | BI01010001010000000000000515BI0100001124 | 2 | One Test |
13 | 13 | Item No. 13: Royalty Charges for SOIL. Rate Inclusive of surcharge of 2% (141.34 + 2.82 = 144.16, Say 144.15) | BI01010001010000000000000515BI0100001125 | 690 | Cubic Meter |
14 | 14 | Item No. 14: Royalty Charges for HARD MURUM. Rate Inclusive of surcharge of 2% (141.34 + 2.82 = 144.16, Say 144.15) | BI01010001010000000000000515BI0100001126 | 87.3 | Cubic Meter |