Repair/Maintenance /Servicing Of Dg Sets , Amf Panels And Connected Works At Katari Bagh And Naval Base Kochi, Nava Base Kochi-Kerala

Military Engineer Services-MES has published Repair/Maintenance /Servicing Of Dg Sets , Amf Panels And Connected Works At Katari Bagh And Naval Base Kochi. Submission Date for this Tender is 16-06-2020. Diesel Generators Tenders in Nava Base Kochi Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24139011
Corrigendum : Repair/Maintenance /Servicing Of Dg Sets , Amf Panels And Connected Works At Katari Bagh And Naval Base Kochi
Indian
Kerala
Nava Base Kochi
16-06-2020

Tender Details

Repair/Maintenance /Servicing Of Dg Sets , Amf Panels And Connected Works At Katari Bagh And Naval Base Kochi

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Apr-2020 Critical Date Changes Date 20-04-2020
2 21-Apr-2020 Corrigendum_2 Date 05-05-2020
3 05-May-2020 Corrigendum_4 Date 11-05-2020
4 11-May-2020 Corrigendum_5 Date 18-05-2020
5 19-May-2020 Corrigendum_6 Date 25-05-2020
6 26-May-2020 Corrigendum_7 Date 29-05-2020
7 29-May-2020 Corrigendum_8 Date 05-06-2020
8 05-Jun-2020 Corrigendum_9 Date 12-06-2020
9 12-Jun-2020 Corrigendum_19 Date 16-06-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 80000.0 /-
Tender Value
INR 40 Lakhs /-

BOQ Items

Name of Work : REPAIR/MAINT/SERVICING OF DG SETS, AMF PANELS AND CONNECTED WORKS AT KATARI BAGH AND NAVAL BASE KOCHI
Sl. No. Item Description Item Code / Make Quantity Units
1 1 M & L "B" check, Servicing and cleaning of DG set of capacity up to 50 KVA complete all as specified. 20 Each Job
2 2 M & L "B" check, Servicing and cleaning of DG set of capacity 60 to 82.50 KVA complete all as specified. 8 Each Job
3 3 M & L "B" check, Servicing and cleaning of DG set of capacity 100 to 160 KVA complete all as specified. 13 Each Job
4 4 M & L "B" check, Servicing and cleaning of DG set of capacity 200 to 250 KVA complete all as specified. 8 Each Job
5 5 M & L "B" check, Servicing and cleaning of DG set of capacity 320 KVA complete all as specified. 6 Each Job
6 6 M & L "B" check, Servicing and cleaning of DG set of capacity 400 to 437.50 KVA complete all as specified. 3 Each Job
7 7 M & L "B" check, Servicing and cleaning of DG set of capacity 500 KVA complete all as specified. 5 Each Job
8 8 M & L "B" check, Servicing and cleaning of DG set of capacity 625 KVA complete all as specified.\n 5 Each Job
9 9 M & L "B" check, Servicing and cleaning of DG set of capacity 1250 KVA complete all as specified.\n 5 Each Job
10 10 Scope of work for item No. 1 to 9 shall be as under :-\n(a) Replacing oil filters \n(b) Cleaning of air filters \n(c) Checking of fan belt all nut bolt, etc \n(d) Top up the engine oil and radiator coolent. \n(e) Replace unserviceable PVC fuel indication tube \n(f) Top up the distilled water in the battery if required.\n(g) Replace unserviceable hose pipe as required at site\n(h) Replacing the primary, secondary and bye-pass fuel filters\n(j) Cleaning the radiator by using water blower/vacuume cleaner.\n(k) Draining out unserviceable engine oil from engine, refill with new oil.\n(l) Supply and replacing unserviceable "D" clamp, nut bolt, washers, etc.\n(m) Tools for the repairs and safety of the mechanic/engineer shall be at contractor's risk.\n(n) Supply and replacing unserviceable battery terminals and chrochodoile clamp as required at site\n(o) Cleaning all sludge/deposits in the oil sump and removal of dust deposited on DG set and its surroundings.\nNote :- \n(i) Distilled water, Engine oil and radiater coolent if any will be measured and paid separately.\n(ii) All spares and parts used other than mentioned above shall be measured and paid separately and all spares shall be recommended by manufacturer of the respective DG set and shall be purchased from authorised dealer of OEM.\n(iii) Servicing shall be caarried out through authorised dealer of OEM ie., manufacturer of the respective DG set and submit the servicing job card of manufacturer while claiming payment duly signed by user and dealer/OEM.\n(iv) Certificate of guarantee showing replaced parts duing servicing and paid voucher from OEM/dealer should be submitted while claiming payment.
11 11 Supply only Radiator coolent coil suitable for DG set upto 50KVA capacity as per existing make & model complete all as specified. 2 Each
12 12 Supply only Radiator coolent coil suitable for DG set 60 to 200 KVA capacity as per existing make & model complete all as specified. 1 Each
13 13 Supply only Radiator coolent coil suitable for DG set 250 to 437.5 KVA capacity as per existing make & model complete all as specified. 1 Each
14 14 Supply only Radiator coolent coil suitable for DG set 500 to 625 KVA capacity as per existing make & model complete all as specified. 1 Each
15 15 M & L Servicing radiator assembly of DG Set upto 50 KVA capacity by removing the radiator from its base, taken to workshop, opening into parts, sort out and replace unserviceable items, cleaning the channels, cooling coils, repairs to blocked fins including necessary gas welding works, removing dust by using hot blower, reassembling and refitting the radiator on its original base including transportation of radiator from work shop to site complete all as per the direction of the Engr-in-Charge. 4 Each Job
16 16 M & L Servicing radiator assembly of DG Set 60 to 82.50 KVA capacity by removing the radiator from its base, taken to workshop, opening into parts, sort out and replace unserviceable items, cleaning the channels, cooling coils, repairs to blocked fins including necessary gas welding works, removing dust by using hot blower, reassembling and refitting the radiator on its original base including transportation of radiator from work shop to site complete all as per the direction of the Engr-in-Charge. 3 Each Job
17 17 M & L Servicing radiator assembly of DG Set 100 to 200 KVA capacity by removing the radiator from its base, taken to workshop, opening into parts, sort out and replace unserviceable items, cleaning the channels, cooling coils, repairs to blocked fins including necessary gas welding works, removing dust by using hot blower, reassembling and refitting the radiator on its original base including transportation of radiator from work shop to site complete all as per the direction of the Engr-in-Charge. 2 Each Job
18 18 M & L Servicing radiator assembly of DG Set 250 to 437.50 KVA capacity by removing the radiator from its base, taken to workshop, opening into parts, sort out and replace unserviceable items, cleaning the channels, cooling coils, repairs to blocked fins including necessary gas welding works, removing dust by using hot blower, reassembling and refitting the radiator on its original base including transportation of radiator from work shop to site complete all as per the direction of the Engr-in-Charge. 2 Each Job
19 19 M & L Servicing radiator assembly of DG Set 500 to 625 KVA capacity by removing the radiator from its base, taken to workshop, opening into parts, sort out and replace unserviceable items, cleaning the channels, cooling coils, repairs to blocked fins including necessary gas welding works, removing dust by using hot blower, reassembling and refitting the radiator on its original base including transportation of radiator from work shop to site complete all as per the direction of the Engr-in-Charge. 1 Each Job
20 20 S & F in repair Solonoid coil suitable for DG Set 500 to 625 KVA capacity as per existing type and model complete all as specified. 2 Each
21 21 S & F in repair Solonoid coil suitable for DG Set 200 to 437.50 KVA capacity as per existing type and model complete all as specified. 2 Each
22 22 S & F in repair Solonoid coil suitable for DG Set 50 to 160 KVA capacity as per existing type and model complete all as specified. 6 Each
23 23 S & F in repair Filter assembly suitable for DG Set 250 KVA capacity as per existing type and model complete all as specified. 8 Each
24 24 S & F in repair Filter assembly suitable for DG Set 320 KVA capacity as per existing type and model complete all as specified. 2 Each
25 25 S & F in repair Filter assembly suitable for DG Set 400 to 625 KVA capacity as per existing type and model complete all as specified. 2 Each
26 26 M & L Taking down water pump assembly of DG sets upto 62.5 KVA capacity from its existing position, opening into parts, overhauling the same at workshop with replacement of water pump repair kit, ball bearing (1No) (Make SKF/NBC), gasket seal, oil seal and re-assembling and re-fixing on the base including to and fro conveyance charge from site to workshop and back complete all as specified. 4 Each
27 27 M & L Taking down water pump assembly of DG sets 75 to 160 KVA capacity from its existing position, opening into parts, overhauling the same at workshop with replacement of water pump repair kit, ball bearing (1No) (Make SKF/NBC), gasket seal, oil seal and re-assembling and re-fixing on the base including to and fro conveyance charge from site to workshop and back complete all as specified. 2 Each
28 28 M & L Taking down water pump assembly of DG sets 200 to 625 KVA capacity from its existing position, opening into parts, overhauling the same at workshop with replacement of water pump repair kit, ball bearing (1No) (Make SKF/NBC), gasket seal, oil seal and re-assembling and re-fixing on the base including to and fro conveyance charge from site to workshop and back complete all as specified. 2 Each
29 29 M & L Taking down 12/24 Volts Dynamo suitable for DG set of any capacity from the existing position, shifting to the work shop , opening into parts, cleaning to sort out the unserviceable parts, replace by new one, rewinding and varnishing, heating of coil, reassembling and re-fixing to its base including to and fro conveyance charge from site to workshop and back complete all as specified. 5 Each Job
30 30 M & L Dismantling carefully fuel injection pump (FIP) upto 6 cylinders engine of DG set and transporting to workshop, opening into parts, for maintenance, servicing, overhauling, tuning and calibration , adjustment of nozzle pressure and other controls, replacement of unserviceable spares, re-assembling, re-fixing the FIP on its original position including to and fro conveyance charge from site to workshop and back complete all as specified. 2 Each Job
31 31 M & L Dismantling carefully fuel injection pump (FIP) upto 12 cylinders engine of DG set and transporting to workshop, opening into parts, for maintenance, servicing, overhauling, tuning and calibration , adjustment of nozzle pressure and other controls, replacement of unserviceable spares, re-assembling, re-fixing the FIP on its original position including to and fro conveyance charge from site to workshop and back complete all as specified. 3 Each Job
32 32 M & L Taking down 24 volt self starter assembly of DG set, from the existing position, and transporting to workshop, opening in to parts, sort out the unserviceable items like carbon bush, pinion, armature, carbon brush holder, etc. and replace the same with new one including rewinding of field coils, re-assembling and re-fixing the same in its original position, testing with entire satisfaction of Enfineer-in-Charge including to and fro conveyance charge from site to workshop and back complete all as specified. 2 Each
33 33 M & L Taking down 12 volt self starter assembly of DG set, from the existing position, and transporting to workshop, opening in to parts, sort out the unserviceable items like carbon bush, pinion, armature, carbon brush holder, etc. and replace the same with new one including rewinding of field coils, re-assembling and re-fixing the same in its original position, testing with entire satisfaction of Enfineer-in-Charge including to and fro conveyance charge from site to workshop and back complete all as specified. 2 Each
34 34 Supply only hose pipe set with clamps suitable for 20 KVA to 125 KVA capacity DG sets as per existing type and size complete all as specified. 2 Each Set
35 35 Supply only hose pipe set with clamps suitable for 150 KVA to 320 KVA capacity DG sets as per existing type and size complete all as specified. 2 Each Set
36 36 Supply only hose pipe set with clamps suitable for 400 KVA to 625 KVA capacity DG sets as per existing type and size complete all as specified. 2 Each Set
37 37 M & L Dismantling the alternator of DG set from its base by using chain and pulley after removing the coupling with the engine, removing all nut, bolt with washer and all electrical connections of the alternator, shifting the alternator to work shop by crane and vehicle, opening into parts, checking all winding like main stator/rotor winding, exciter stator/rotor winding. Rewinding the main rotor and exciter rotor by using the "F" class insulation and existing gauge and type of magnet wire which was on the original motor, varnishing, heating, drying, greasing the bearings including replacement of unserviceable bearings, Re-fixing the complete including connection to the terminal box of the alternator at work shop and shifting the same to the site, Fixing the alternator to its base carefully by using chain and pulley, connecting it with existing engine including checking the alignment of alternator with the engine, connecting all electrical connections of the alternator and testing the DG set on "OFF/FULL LOAD", matching to the existing range of RPM of the engine out put voltage 415 volt and testing complete all as per the direction of the Engr-in-charge. 400 Per KVA
38 38 M & L Preparing surfaces of DG set canopy/complete body/LT panel board and applying painting two coats of superior quality synthetic enamel paint using spray gun (Area of painting not exceeding 3 sqm) including writing of incoming/outgoing feeder with letters, MES/SM Nos etc complete all as specified. 10 Each Job
39 39 M & L Taking down unserviceable heat insulation from exhaust piping and providing new heat insulation to exhaust pape using 50 mm thick mineral wool inside the container & upto the exhaust stack. The insulation shall be cladded/ covered with 24G aluminium sheet. Pipe length shall be maximum up to 12 Mtr long from engine including necessary welding works, cladding works with wire mesh and aluminium foil, replace unserviceable supporting MC, angle iron 50 mm X 50 mm X 6 mm , suitable size flange, nut, bolt and washers as required including weather cowl complete all as specified. 2 Each Job
40 40 M & L Dismantling exhaust manifold from the engine, detect the smoke leak, clean the manifold including welding works, replacement of unserviceable spares, packing, bellows, nut, bolt, washers, insulators, etc. reassembling and refixing on its base, testing by running the DG set NO LOAD/FULL LOAD complete all as specified. 2 Each Job
41 41 Attending any electrical or mechanical complaints of DG set up to 50 KVA capacity including AMF panel and rectifying with spare parts, if it minor nature, where no major spares are required and suggesting remedial measures if major complaints complete all as secified. 30 Each Job
42 42 Attending any electrical or mechanical complaints of DG set 60 to 160 KVA capacity including AMF panel and rectifying with spare parts, if it minor nature, where no major spares are required and suggesting remedial measures if major complaints complete all as secified. 30 Each Job
43 43 Attending any electrical or mechanical complaints of DG set 200 to 320 KVA capacity including AMF panel and rectifying with spare parts, if it minor nature, where no major spares are required and suggesting remedial measures if major complaints complete all as secified. 30 Each Job
44 44 Attending any electrical or mechanical complaints of DG set 400 to 625 KVA capacity including AMF panel and rectifying with spare parts, if it minor nature, where no major spares are required and suggesting remedial measures if major complaints complete all as secified. 20 Each Job
45 45 NOTE FOR ITEM NO. 41 TO 44 :- \n(i) The Mechanic/Engineer shal attend the complaints with in 48 hrs from the tele message/call from the Engineer-in-Charge or JE including Sunday and holiday.\n(ii) The rate quoted deem to include the cost of minor spares upto Rs 500 required to rectify the complaint. In this regard Accepting Officer's decision is final\n(iii) Major spares required for rectifying the complaint shall be measured and paid separately.\n(iv) Tools for the repairs and safety of the mechanic/Engineer shall be at contractor's risk.\n(v) The contractor is bound to send the Mechanic/Engineer within 4 hurs during the VIP/VVIP visit to attend the complaints if any without fail otherwise a penalty of Rs 500.00 shall be recovered per hour upto 24 hours and Rs 1000.00 above 24 hours.\n(vi) If the contractor failed to attend the complaint within 48 hours, a penalty of Rs 500.00 per hour shall be recovered.
46 46 S & F Power start controller suitable for DG set upto 125 KVA capacity with all engine safety system both mannual and auto start, reset functions with suitable oil pressure sensor, high water temperature safety, over speed regulator safety, earth fault safety, low and high AC voltage safety, internal wiring including taking down old unserviceable power start controller complete all as specified. 3 Each
47 47 S & F Power start controller suitable for DG set 150 to 320 KVA capacity with all engine safety system both mannual and auto start, reset functions with suitable oil pressure sensor, high water temperature safety, over speed regulator safety, earth fault safety, low and high AC voltage safety, internal wiring including taking down old unserviceable power start controller complete all as specified. 2 Each
48 48 S & F Power start controller suitable for DG set 400 to 625 KVA capacity with all engine safety system both mannual and auto start, reset functions with suitable oil pressure sensor, high water temperature safety, over speed regulator safety, earth fault safety, low and high AC voltage safety, internal wiring including taking down old unserviceable power start controller complete all as specified. 1 Each
49 49 S & F in repair One meter long battery lead with stranded copper conductor of 200 Amp DC rating maximum upto 2 run x 1 mtr with brass terminals on both end complete all as specified. 10 Each Job
50 50 S & F in repair Residential type silencer suitable for 150 to 320 KVA capacity DG Set as per existing type and model complete all as specified. 2 Each Set
51 51 S & F in repair Flexible pipe as per existing type and make complete all as specified. 4 Each
52 52 S & F in repair Water temperature gauge as per existing type and make complete all as specified. 4 Each
53 53 S & F in repair Oil temperature gauge as per existing type and make complete all as specified. 5 Each
54 54 S & F in repair Exhaust bellow as per existing type and make complete all as specified. 12 Each
55 55 S & F in repair Radiator cap as per existing type and make complete all as specified. 8 Each
56 56 S & F Digital type, three phase LED Voltmeter including taking down old unserviceable voltmeter complete all as specified. 6 Each
57 57 S & F Digital type, three phase LED Ammeter including taking down old unserviceable Ammeter complete all as specified. 6 Each
58 58 S & F Digital type, three phase LED Multi function meter including taking down old unserviceable multi function meter complete all as specified. 2 Each
59 59 S & F Analog type Ammeter, range 0 - 1400 Amp, class 1.5 including taking down old unserviceable Ammeter complete all as specified. 5 Each
60 60 S & F Analog type Voltmeter, range 0 - 600 Volts, class 1.5 including taking down old unserviceable voltmeter complete all as specified. 5 Each
61 61 S & F Instrumentation selector switch upto 16 Amp including taking down old unserviceable instrumentation selector switch complete all as specified. 5 Each
62 62 S & F LED indicator lamp ( Red, Yellow, Amber, Green) including taking down old unserviceable indicator lamp complete all as specified. 8 Each
63 63 S & F LED indicator lamp ( Blue / white ) including taking down old unserviceable indicator lamp complete all as specified. 8 Each
64 64 S & F in repair Standard push button, flush head, any colour complete all as specified. 5 Each
65 65 S & F in repair AMF controller, three phase, 50 Hz, AC, auto/manual/test/off mode with necessary display complete all as specified. 2 Each
66 66 S & F in repair Fan belt as per existing size and type of the DG set, complete all as specified. 3 Each
67 67 S & F in repair Flexible pipe inlet as per existing size and type, complete all as specified. 3 Each
68 68 Supply and replacing storage battery with maintenance free (SMF) self charging, heavy duty battery, sealed, factory charged with in-built SMPS battery charger suitable for 160 to 625 KVA rating complete all as specified.\nMake : HBL (X-CELL) / Cummins / Excide 10 Each
69 69 Supply and replacing storage battery with maintenance free (SMF) self charging, heavy duty battery, sealed, factory charged with in-built SMPS battery charger suitable for upto 150 KVA rating complete all as specified.\nMake : HBL (X-CELL) / Cummins / Excide 10 Each
70 70 S & F in replacement Battery charger 12/24 volt suitable for DG set of capacity upto 50 KVA complete all as specified. 2 Each
71 71 S & F in replacement Battery charger 12/24 volt suitable for DG set of capacity 62.5 to 200 KVA complete all as specified. 2 Each
72 72 S & F in replacement Battery charger 12/24 volt suitable for DG set of capacity 250 to 437.5 KVA complete all as specified. 2 Each
73 73 S & F in replacement Battery charger 12/24 volt suitable for DG set of capacity 500 to 625 KVA complete all as specified. 2 Each
74 74 S & F in replacement Battery charger 12/24 volt suitable for DG set of capacity 1250 KVA complete all as specified. 1 Each
75 75 Supply only Fleet cool HD heavy duty coolant concentrate ultimate protection for increase engine life complete all as specified.\n Make : Fleet guard /Servo 300 Ltrs
76 76 Supply only Engine oil approved by Manufacturer or recommended by GE\n 1575 Ltrs
77 77 S & F in replacement MX321 MK2 AVRs unit of alternator for DG set upto 75KVA capacity as per existing type and model omplete all as specified. 2 Each
78 78 S & F in replacement MX341 MK2 AVRs unit of alternator for DG set 100 to 320 KVA capacity as per existing type and model omplete all as specified. 2 Each
79 79 S & F in replacement MX342 MK2 AVRs unit of alternator for DG set 400 to 625 KVA capacity as per existing type and model omplete all as specified. 1 Each
80 80 S & F MCCB, Three Pole, 63 Amp having breaking capacity of 25 kA, 415 volt AC with thermal magnetic release range 50 - 63 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
81 81 S & F MCCB, Three Pole, 100 Amp having breaking capacity of 25 kA, 415 volt AC with thermal magnetic release range 80-100 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
82 82 S & F MCCB, Three Pole, 125 Amp having breaking capacity of 25 kA, 415 volt AC with thermal magnetic release range 100-125 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
83 83 S & F MCCB, Three Pole, 160 Amp having breaking capacity of 25 kA, 415 volt AC with thermal magnetic release range 125-160 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
84 84 S & F MCCB, Three Pole, 200 Amp having breaking capacity of 25 kA, 415 volt AC with thermal magnetic release range 160-200 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
85 85 S & F MCCB, Three Pole, 250 Amp having breaking capacity of 25 kA, 415 volt AC with thermal magnetic release range 200-250 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
86 86 S & F MCCB, Four Pole, 400 Amp having breaking capacity of 35 kA, 415 volt AC with thermal magnetic release range 320-400 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
87 87 S & F MCCB, Four Pole, 630 Amp having breaking capacity of 35 kA, 415 volt AC with thermal magnetic release range 500-630 Amp with spreader including taking down old unserviceable MCCB complete all as specified. 1 Each
88 88 S & F in repair MCB SP upto 6 Amp, C-curve, 415 volt AC , having breaking capacity 10 kA complete all as specified. 10 Each
89 89 S & F in repair MCB SP 6 - 32 Amp, C-curve, 415 volt AC, having breaking capacity 10 kA complete all as specified. 11 Each
90 90 S & F in repair MCB DP 6 - 32 Amp, C-curve, 415 volt AC, having breaking capacity 10 kA complete all as specified. 10 Each
91 91 S & F in repair MCB 4P, 40 Amp, C-curve, 415 volt AC, having breaking capacity 10 kA complete all as specified. 1 Each
92 92 S & F in repair MCB 4P, 63 Amp, C-curve, 415 volt AC, having breaking capacity 10 kA complete all as specified. 1 Each
93 93 S & F in repair MCB TPN, 100 Amp, C-curve, 415 volt AC having breaking capacity 10 kA complete all as specified. 1 Each
94 94 S & F in repair Power contactor, three pole, 115 Amp MNX type, complete all as specified. 1 Each
95 95 S & F in repair Power contactor, three pole, 150 Amp MNX type, complete all as specified. 1 Each
96 96 S & F in repair Power contactor, three pole, 185 Amp MNX type, complete all as specified. 1 Each
97 97 S & F in repair Power contactor, three pole, 225 Amp MNX type, complete all as specified. 1 Each
98 98 S & F in repair Power contactor, three pole, 265 Amp MNX type, complete all as specified. 1 Each
99 99 S & F in repair Power contactor, three pole, 330 Amp MNX type, complete all as specified. 1 Each
100 100 S & F in repair Power contactor, three pole, 400 Amp MNX type, complete all as specified. 1 Each
101 101 S & F in repair Power contactor, three pole, 500 Amp MNX type, complete all as specified. 1 Each
102 102 S & F in repair Onload change over switch, in sheet steel enclosure, 200 Amp, 415 volt AC complete all as specified. 1 Each
103 103 S & F in repair Onload change over switch, in sheet steel enclosure, 400 Amp, 415 volt AC complete all as specified. 1 Each
104 104 S & F in repair Onload change over switch, in sheet steel enclosure, 630 Amp, 415 volt AC complete all as specified. 1 Each
105 105 S & F in repair Onload change over switch, in sheet steel enclosure, 800 Amp, 415 volt AC complete all as specified. 1 Each
106 106 S & F in repair Automatic/Manual Transfer swith, in sheet steel enclosure, with all control, 400 Amp, AC, 415 Volt AC, IS/IEC : 60947-6-1, Four Pole, 50 Hz complete all as specified. 1 Each
107 107 S & F in repair Automatic/Manual Transfer swith, in sheet steel enclosure, with all control, 630 Amp, AC, 415 Volt AC, IS/IEC : 60947-6-1, Four Pole, 50 Hz complete all as specified. 1 Each
108 108 M & L Overhauling of DG set engine, 15 KVA to 50 KVA capacity, comprising of the following work services of :- \n 1 Each Job
109 109 (a) Disconnection of LT cable from cable end box by unscrewing nuts and bolts.\n(b) Disconnection of Engine from alternater.\n(c) Strip the complete Engine carefully, taking out the spare parts.\n(d) Draining out the unservicable engine oil from the engine.\n(e) Cleaning all sludges / deposits in the oil sump and removal off the site.\n(f) Carry out necessary lathe work, cylinder head repairing, boring,etc\n(g) Replacing of unserviceable components by new one as directed.\nNote: New components required for replacement shall be measured and paid for separately as 'Supply only'.\n(h) Calibration of FIP \n(j) Inject calibration\n(k) Servicing of radiator and water pump\n(l) Fed Pump Servicing\n(m) Re- assemblying the engine including replacement of complete gasket kit.\n(n) Checking for alignment after connecting with alternater.\n(o) Refixing cable with suitable size nuts, bolts and washers.\n(p) Testing the DG set "NO LOAD" and "FULL LOAD"\n(q) Re-assembling of all parts, spray painting to DG set, testing, ensuring the rated RPM of the DG set and output voltage 415 volts etc complete. \n(r) Removing the silencer mainfold, opening, cleaning the muflers, necessary gas welding work, reassembling and refitting the same to its base.\n(s)Dismantling the exhaust manifold, cleaning,replacing gasket,unserviceable bellows including necessary welding works.\nNote :-\n(i) Engn-in-Charge shall attend the workshop or at site during strip inspection and assess the requirement of the work.\n(ii) The items of work mentioned here-in-after are tentative and may vary as per site requirement as assessed by the Engn-in-Charge after strip inspection and the contractor shall have no claim on that account.\n(iii) Servicing shall be caarried out through authorised dealer of OEM ie., manufacturer of the respective DG set and submit the servicing job card of manufacturer while claiming payment duly signed by user and dealer/OEM.\n(iv) Certificate of guarantee showing replaced parts duing servicing and paid voucher from OEM/dealer should be submitted while claiming payment.\n
110 110 M & L Overhauling of DG set engine, 62.5 KVA to 200 KVA capacity, comprising of the following work services of :- \n 1 Each Job
111 111 (a) Disconnection of LT cable from cable end box by unscrewing nuts and bolts.\n(b) Disconnection of Engine from alternater.\n(c) Strip the complete Engine carefully, taking out the spare parts.\n(d) Draining out the unservicable engine oil from the engine.\n(e) Cleaning all sludges / deposits in the oil sump and removal off the site.\n(f) Carry out necessary lathe work, cylinder head repairing, boring,etc\n(g) Replacing of unserviceable components by new one as directed.\nNote: -New components required for replacement shall be measured and paid for separately as 'Supply only'.\n(h) Calibration of FIP \n(j) Inject calibration\n(k) Servicing of radiator and water pump\n(l) Fed Pump Servicing\n(m) Re- assemblying the engine including replacement of complete gasket kit.\n(n) Checking for alignment after connecting with alternater.\n(o) Refixing cable with suitable size nuts, bolts and washers.\n(p) Testing the DG set "NO LOAD" and "FULL LOAD"\n(q) Re-assembling of all parts, spray painting to DG set, testing, ensuring the rated RPM of the DG set and output voltage 415 volts etc complete. \n(r) Removing the silencer mainfold, opening, cleaning the muflers, necessary gas welding work, reassembling and refitting the same to its base.\n(s)Dismantling the exhaust manifold, cleaning,replacing gasket,unserviceable bellows including necessary welding works.\nNote :-\n(i) Engn-in-Charge shall attend the workshop or at site during strip inspection and assess the requirement of the work.\n(ii) The items of work mentioned here-in-after are tentative and may vary as per site requirement as assessed by the Engn-in-Charge after strip inspection and the contractor shall have no claim on that account.\n(iii) Servicing shall be caarried out through authorised dealer of OEM ie., manufacturer of the respective DG set and submit the servicing job card of manufacturer while claiming payment duly signed by user and dealer/OEM.\n(iv) Certificate of guarantee showing replaced parts duing servicing and paid voucher from OEM/dealer should be submitted while claiming payment.\n
112 112 M & L Overhauling of DG set engine, 250 KVA to 437.5 KVA capacity, comprising of the following work services of :- \n 1 Each Job
113 113 (a) Disconnection of LT cable from cable end box by unscrewing nuts and bolts.\n(b) Disconnection of Engine from alternater.\n(c) Strip the complete Engine carefully, taking out the spare parts.\n(d) Draining out the unservicable engine oil from the engine.\n(e) Cleaning all sludges / deposits in the oil sump and removal off the site.\n(f) Carry out necessary lathe work, cylinder head repairing, boring,etc\n(g) Replacing of unserviceable components by new one as directed.\nNote: New components required for replacement shall be measured and paid for separately as 'Supply only'.\n(h) Calibration of FIP \n(j) Inject calibration\n(k) Servicing of radiator and water pump\n(l) Fed Pump Servicing\n(m) Re- assemblying the engine including replacement of complete gasket kit.\n(n) Checking for alignment after connecting with alternater.\n(o) Refixing cable with suitable size nuts, bolts and washers.\n(p) Testing the DG set "NO LOAD" and "FULL LOAD"\n(q) Re-assembling of all parts, spray painting to DG set, testing, ensuring the rated RPM of the DG set and output voltage 415 volts etc complete. \n(r) Removing the silencer mainfold, opening, cleaning the muflers, necessary gas welding work, reassembling and refitting the same to its base.\n(s) Dismantling the exhaust manifold, cleaning,replacing gasket,unserviceable bellows including necessary welding works.\nNote :-\n(i) Engn-in-Charge shall attend the workshop or at site during strip inspection and assess the requirement of the work.\n(ii) The items of work mentioned here-in-after are tentative and may vary as per site requirement as assessed by the Engn-in-Charge after strip inspection and the contractor shall have no claim on that account.\n(iii) Servicing shall be caarried out through authorised dealer of OEM ie., manufacturer of the respective DG set and submit the servicing job card of manufacturer while claiming payment duly signed by user and dealer/OEM.\n(iv) Certificate of guarantee showing replaced parts duing servicing and paid voucher from OEM/dealer should be submitted while claiming payment.\n
114 114 M & L Overhauling of DG set engine, 500 KVA to 1250 KVA capacity, comprising of the following work services of :- \n 1 Each Job
115 115 (a) Disconnection of LT cable from cable end box by unscrewing nuts and bolts.\n(b) Disconnection of Engine from alternater.\n(c) Strip the complete Engine carefully, taking out the spare parts.\n(d) Draining out the unservicable engine oil from the engine.\n(e) Cleaning all sludges / deposits in the oil sump and removal off the site.\n(f) Carry out necessary lathe work, cylinder head repairing, boring,etc\n(g) Replacing of unserviceable components by new one as directed.\nNote: New components required for replacement shall be measured and paid for separately as 'Supply only'.\n(h) Calibration of FIP \n(j) Inject calibration\n(k) Servicing of radiator and water pump\n(l) Fed Pump Servicing\n(m) Re- assemblying the engine including replacement of complete gasket kit.\n(n) Checking for alignment after connecting with alternater.\n(o) Refixing cable with suitable size nuts, bolts and washers.\n(p) Testing the DG set "NO LOAD" and "FULL LOAD"\n(q) Re-assembling of all parts, spray painting to DG set, testing, ensuring the rated RPM of the DG set and output voltage 415 volts etc complete. \n(r) Removing the silencer mainfold, opening, cleaning the muflers, necessary gas welding work, reassembling and refitting the same to its base.\n(s)Dismantling the exhaust manifold, cleaning,replacing gasket,unserviceable bellows including necessary welding works.\nNote :-\n(i) Engn-in-Charge shall attend the workshop or at site during strip inspection and assess the requirement of the work.\n(ii) The items of work mentioned here-in-after are tentative and may vary as per site requirement as assessed by the Engn-in-Charge after strip inspection and the contractor shall have no claim on that account.\n(iii) Servicing shall be caarried out through authorised dealer of OEM ie., manufacturer of the respective DG set and submit the servicing job card of manufacturer while claiming payment duly signed by user and dealer/OEM.\n(iv) Certificate of guarantee showing replaced parts duing servicing and paid voucher from OEM/dealer should be submitted while claiming payment.\n
116 116 M & L Topping up fuel in DG sets located at various locations, Naval Base, Kochi. \nNote :-\n(a) Fuel should be collected from MES store Yard or Petrol pump located inside Naval Base, Kochi.\n(b) Vehicle, tools, equipments like hose, pump, funnel etc and container should be arranged by the contractor for fuel collection and topping up.\n(c) After topping up, signature should be obtained from DG set incharge/User. 50 Each Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail