}

Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And Foot Valve In Workshop Of Enm ( M ) During Monsoon At Dudhichua Project Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And FootValve In Workshop Of Enm, Dudhichua Project, NCL-Uttar Pradesh

Northern Coalfields Limited-NCL has published Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And Foot Valve In Workshop Of Enm ( M ) During Monsoon At Dudhichua Project Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And FootValve In Workshop Of Enm. Submission Date for this Tender is 10-04-2020. Pump Supply Tenders in Dudhichua Project, NCL Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24129651
Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And Foot Valve In Workshop Of Enm ( M ) During Monsoon At Dudhichua Project Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And FootValve In Workshop Of Enm
Open Tender
Indian
Uttar Pradesh
Dudhichua Project, NCL
10-04-2020

Tender Details

Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And Foot Valve In Workshop Of Enm ( M ) During Monsoon At Dudhichua Project Repairing And Overhauling Of Ht Pump Set Including Nrvs , Sluice Valve And FootValve In Workshop Of Enm ( M ) During Monsoon At Dudhichua Project

Key Value

Document Fees
Refer document
EMD
INR 3091.0 /-
Tender Value
INR 2.47 Lakhs /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Repairing and overhauling of HT pump set including NRV's, Sluice valve and foot valve in workshop of E&M(M) during monsoon.\n\nScope of work- Cleaning of all equipment (motor, pump and valves etc.) Dismantling of all equipment and minor repairing of it's part then assembly of above equipment. Fixing of motor and pump on base with alignment work prior shifting in Mines and helping in all other work that are related to repairing and overhauling of above equipment To do the above work contractor has to ensure availability of minimum un-skilled 04 man power per day. 123 days
2 2 Total impact of GST for the purpose of CTC 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail