Kerala Water Authority-KWA has published Deposit Work Kummil Grama Panchayath Annual Plan 2018 19 Maintenance And Pipe Line Extension To Oonnamkallu Kushavoorkonam And Kalluthery Kumbalam. Submission Date for this Tender is 06-05-2020. Pipe Laying Tenders in Kummil Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-Apr-2020 | Date extension | Date | 05-05-2020 |
2 | 05-May-2020 | Date extension. | Date | 06-05-2020 |
Name of Work:Deposit Work - Kummil Grama Panchayath- Annual Plan - 2018 - 19 - Maintenance and Pipe line extension to Oonnamkallu - Kushavoorkonam and Kalluthery - kumbalam | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | WORKING CHARGES | BI01010001010000000000000515BI0100001113 | ||
2 | 1.01 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil (Ref. Item No. 2.10.1 of DSR) | BI01010001010000000000000515BI0100001114 | 280 | cum |
3 | 1.02 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | BI01010001010000000000000515BI0100001115 | 45 | cum |
4 | 1.03 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | BI01010001010000000000000515BI0100001116 | 7.5 | cum |
5 | 1.04 | Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009) | BI01010001010000000000000515BI0100001117 | 200 | metre |
6 | 1.05 | Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes." | BI01010001010000000000000515BI0100001118 | 650 | metre |
7 | 1.06 | Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore | BI01010001010000000000000515BI0100001119 | 50 | metre |
8 | 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001120 | 7.5 | cum |
9 | 1.08 | Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete. | BI01010001010000000000000515BI0100001121 | 6 | Nos |
10 | 1.09 | Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001122 | 3 | Leak |
11 | 1.1 | Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting,cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete. | BI01010001010000000000000515BI0100001123 | 3 | Leak |
12 | 1.11 | Leak rectification work in 63 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | BI01010001010000000000000515BI0100001124 | 3 | Leak |
13 | 1.12 | "Conveying and fixing C.I. sluice valves (with cap) by providing complete with bolts, nuts, rubber insertions etc. excluding the cost of valve (the tail pieces if required will be paid separately) :80 mm diameter. Class I"Observed Data derived from item no.18.31.of DAR | BI01010001010000000000000515BI0100001125 | 1 | Nos |
14 | 1.13 | Leak rectification work in 75 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | BI01010001010000000000000515BI0100001126 | 3 | Leak |
15 | 1.14 | Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | BI01010001010000000000000515BI0100001127 | 3 | Leak |
16 | 1.15 | Supplying and fixing RCC precast Street fountain post including earthwork excavation in all kind of soil for exposing the main, boring the main, supplying and fitting saddle piece, 20mm brass ferrule , bend, valve ,union, 20mm ASTM pipe, 15 mm PTMT/ waste not tap including cutting threading laying and jointing 20mm GI pipe and specials for giving connection to the SF including labour charges cost and conveyance of all materials etc. complte. | BI01010001010000000000000515BI0100001128 | 4 | No |
17 | 1.16 | Charges for interconnecting the existing line<br> | BI01010001010000000000000515BI0100001129 | 2 | No |
18 | 2 | COST OF MATERIALS | BI01010001010000000000000515BI0100001130 | ||
19 | 2.01 | Supply of PVC Pipe, 6kg/cm2, 90mm Dia. | BI01010001010000000000000515BI0100001131 | 650 | metre |
20 | 2.02 | Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm. | BI01010001010000000000000515BI0100001132 | 1 | No |
21 | 2.03 | Note: GST @ 12% of bill amount will be paid additionally. | BI01010001010000000000000515BI0100001133 |