Military Engineer Services-MES has published Manning And Operation To Sewage System At Mil Station Sangrur Under Ge South Patiala As Per Tender Document. Submission Date for this Tender is 07-04-2020. Sewerage Construction Tenders in Mil Stn Sangrur Punjab. Bidders can get complete Tender details and download the document.
Name of Work: MANNING AND OPERATION TO SEWAGE SYSTEM AT MIL STATION SANGRUR UNDER GE SOUTH PATIALA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Rendering services of Sewage treatment plant (STP) installed at sangrur including operation of standby DG Set in two shifts (each shift of 08 hours) including sundays & holidays by deploying One operator per shift. \nNotes : - (i) The estmate rate under Column no 05 inserted by the MES based on minimum fair wages prevailing as on the date of publish of tender for Sangrur station and considering other statuory provisions like EPF, ESIC, GST, Labour cess and OHC. Quoted rate by the bidders if found below the estimated rate shall be termed as NON BONAFIDE BID and to be rejected during evaluation of bids.\n(ii) In case minimum fair wage, EPF, ESIC, GST and Labour cess changed before the end date of submission of bid, the estimated rate under column no 5 shall be deemed ammended as per revised statutory provisions and note no 1 above shall stand acordingly.\n(iii) The rate quotated by the contactor shall be deemed included for safe custody of the installation during the contract period.\n(iv) Diesel & Lubricating oil will be issued by Deptt. as and when reqd, but contractor shall collect the same from AGE E/M(P) store yard at his own arrangement.\n(v) All motor, pump shall be oiled/greased once in month & this record of maintenance will be prepared and will be submitted to Sub Div.\n(vi) Recording & maintenance of log sheet of installation, duty roster etc shall maintained by the contractor.\n\n | 660 | Per Shift \nof 8 Hrs | |
2 | 2 | Rendering services of Booster no 1, 2 & 3 at sangrur including operation of standby DG Set in two shifts (each shift of 08 hours) including sundays & holidays by deploying One operator per shift. \nNotes : - (i) The estmate rate under Column no 05 inserted by the MES based on minimum fair wages prevailing as on the date of publish of tender for Sangrur station and considering other statuory provisions like EPF, ESIC, GST, Labour cess and OHC. Quoted rate by the bidders if found below the estimated rate shall be termed as NON BONAFIDE BID and to be rejected during evaluation of bids.\n(ii) In case minimum fair wage, EPF, ESIC, GST and Labour cess changed before the end date of submission of bid, the estimated rate under column no 5 shall be deemed ammended as per revised statutory provisions and note no 1 above shall stand acordingly.\n(iii) The rate quotated by the contactor shall be deemed included for safe custody of the installation during the contract period.\n(iv) Diesel & Lubricating oil will be issued by Deptt. as and when reqd, but contractor shall collect the same from AGE E/M(P) store yard at his own arrangement.\n(v) All motor, pump shall be oiled/greased once in month & this record of maintenance will be prepared and will be submitted to Sub Div.\n(vi) Recording & maintenance of log sheet of installation, duty roster etc shall maintained by the contractor.\n\n | 660 | Per Shift \nof 8 Hrs | |
3 | 3 | Conducting of BOD Test of Raw water / treated water effluent from industrial research and development, Thapar university Patiala, complete all as directed by engineer in charge / thapar university. | 1 | Each Test | |
4 | 4 | Conducting of COD Test of Raw water / treated water effluent from industrial research and development, Thapar university Patiala, complete all as directed by engineer in charge / thapar university. | 1 | Each Test | |
5 | 5 | Conducting of MPN Test of Raw water / treated water effluent from industrial research and development, Thapar university Patiala, complete all as directed by engineer in charge / thapar university. | 1 | Each Test | |
6 | 6 | Conducting of TKN Test of Raw water / treated water effluent from industrial research and development, Thapar university Patiala, complete all as directed by engineer in charge / thapar university. | 1 | Each Test | |
7 | 7 | Conducting of TSS Test of Raw water / treated water effluent from industrial research and development, Thapar university Patiala, complete all as directed by engineer in charge / thapar university. | 1 | Each Test | |
8 | 8 | Conducting of T.P Test of Raw water / treated water effluent from industrial research and development, Thapar university Patiala, complete all as directed by engineer in charge / thapar university. | 1 | Each Test |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy