Manning And Operation Comprehensive Maintenance And Repair Replacement Of Central Air Conditioning Plant And Cold Storage At Bv Yard And Doom Hall Manning And Operation Of Electric Supply Installation At Various Location And Water Supply Installati, GE (NW) KUNJALI, COLABA MUMBAI-Maharashtra

Military Engineer Services-MES has published Manning And Operation Comprehensive Maintenance And Repair Replacement Of Central Air Conditioning Plant And Cold Storage At Bv Yard And Doom Hall Manning And Operation Of Electric Supply Installation At Various Location And Water Supply Installati. Submission Date for this Tender is 10-04-2020. Air Conditioner Tenders in GE (NW) KUNJALI, COLABA MUMBAI Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

24114509
Manning And Operation Comprehensive Maintenance And Repair Replacement Of Central Air Conditioning Plant And Cold Storage At Bv Yard And Doom Hall Manning And Operation Of Electric Supply Installation At Various Location And Water Supply Installati
Open Tender
Indian
Maharashtra
GE (NW) KUNJALI, COLABA MUMBAI
10-04-2020

Tender Details

Manning And Operation Comprehensive Maintenance And Repair Replacement Of Central Air Conditioning Plant And Cold Storage At Bv Yard And Doom Hall Manning And Operation Of Electric Supply Installation At Various Location And Water Supply Installati

Key Value

Document Fees
INR 1000 /-
EMD
INR 140350.0 /-
Tender Value
INR 76.90 Lakhs /-

BOQ Items

Name of Work : MANNING AND OPERATION COMPREHENSIVE MAINTENANCE AND REPAIR/REPLACEMENT OF CENTRAL AIR CONDITIONING PLANT AND COLD STORAGE AT BV YARD AND DOOM HALL, MANNING AND OPERATION OF ELECTRIC SUPPLY INSTALLATION AT VARIOUS LOCATION AND WATER SUPPLY INSTALLATION AND CERTAIN OTHER WORKS AT KUNJALI(P) RAFIYA MANJIL & PCDA(N) UNDER GE (NW) KUNJALI, COLABA MUMBAI
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Manning and operation of walk in chiller/ freezer (Cold Storage) running round the clock in three shift including Sunday and Holiday (i.e 0600 To 1400 Hrs , 1400 To 2200 Hrs & 2200 To 0600 Hrs in Three Shift) in B.V Yard at Colaba including taking care from any pilferage, theft or damage, cleaning etc complete for the following all as directed:-\n(a) Walk in chiller with air cooled split type chiller refrigeration unit each capacity 10,000 BTU per hr (Working 02 Nos and 01 No stand by total Three Nos) or scroll hermatic compressor based non CFC R22 refrigerent inside room temperature 2º C To 8ºC suitable for product load 10MT.\n(b) Walk in chiller with air cooled split type chiller refrigeration unit each capacity 15,000 BTU per hr.(Working 02Nos. and 01 No Stand by total Three Nos.) or scroll hermaticaiiy compressor based non CFC R22 refrigerent inside room temperature -4ºC to +4ºC suitable for product load 10MT.\n(c) Walk in chiller with air cooled split type chiller refrigeration unit each capacity 30,000 BTU per hr.(Working 02Nos. and 01 No Stand by Total Three Nos.) or scroll hermatically compressor based non CFC R404a refrigerent inside room temperature -18ºC to -23ºC suitable for product load 10MT.\n\n\n\n\n\n 33 Per shift/ Per month
2 2 Comprehensive maintenance of walk in chiller / freezer (Cold Storage) installed in B.V Yard main bldg. round the clock including painting of platform of unit with stair case replacement of lights in cool and cold room, repairs of doors, lock etc complete for the following specification. (a) Air cooled split type refregeration unit of capacity 30000 BTU/Hrs. sealed compressure based on CFC-R 404 a gas maintaining temperature -18ºC To -23ºC, RH 50% of cool room No. 1 of size 6.55 x 5.75 x 3.9M. (b) Refrigerantion unit -03 Nos (c) Compressor- 03 Nos (d) Air cooled split type refregeration unit of capacity 10000BTU/Hrs and maintaining temp 2ºC to 8ºC for cool room of size 11.5 x 5.95 x 3.9M. (e) Refrigeration unit - 03 Nos (f) Compressor - 03 Nos (g) Air cooled split type refregeration unit of capacity 15000BTU/Hrs.and maintaining temp -4ºC to +4ºC for cool room of size 6.55 x 5.75 x 3.9M. (h) Refrigeration unit -03 Nos (j)Compressor - 03 Nos 11 Per Month
3 3 Comprehensive maintenance of Central AC Plant of capacity 14TR X 2Nos.comprising of following equipment mentioned below complete all as specified and directed by Engineer-in-Charge at Doom Hall (a) Compressor model ACCEL SMC 4-65 -2 Nos (b) Compressor motor 15HP-02Nos. (c) Condenser water pump set mono block 5HP-02Nos. (d) Air handling unit with blower motor -01No. (e) FRP Cooling tower with CT Fan- 01No. (f) Electrical control panel cubical type floor mounted complete with main switch, MCCBs, MCB's, voltmeter, Ammeter, auto matic star delta starter for compressors, AHU, pumps, CT fans, condenser etc. complete-01 Set. (g) Control devices such as expansion valve, thermostat solenoid valves, HP/ LP/ OP cut outs with panel board installed gauges-01Set (h) Digit type thermometer-01Set (j) Air supply duct with grill diffusers, dampers and pre heater & re heater back of each complete-01Set (k) Condenser MS piping 50/40mm dia with valves, pressure gauge, temperature gauge, complete-01Set. 11 Per Month
4 4 Pumping down and transfer existing refrigerant gas of compressor complete for overhauling of compressor, reciprocating type type open type Model No SMC- 4-65 Make : ACCEL 14 Ton capacity and dismantling complete, assembly & replacing of minor unserviceable parts including matching of crank shaft, boring polishing etc. replacing of gaskets packing reassembly and recharging of pumped down refrigerant & topping up if required maintain the required standing pressure charging of compressor oil complete testing for smooth functioning etc complete all as specified and directed by Engineer-in-Charge at Doom Hall.\nNote: Major spare parts, compressor oil and refrigerant for topping up will be measured and paid seperately under relevant items here in after as 'supply only'. Labour charges are deemed to be included in the quoted unit rate for this item. 2 Each Job
5 5 Supply only the following items for compressor reciprocating model SMC- 4-65 Make : ACCEL at Doom Hall
6 5.01 Piston 2 Each
7 5.02 Piston rings 4 Each
8 5.03 Oil rings 2 Each
9 5.04 Connecting rod bearing half section 2 Each
10 5.05 Main end bearing with washer 2 Each
11 5.06 Liner assembly 1 Each
12 5.07 Gudgeon pin bush 2 Each
13 5.08 Rocker arm frame 2 Each
14 5.09 Rocker arm 2 Each
15 5.1 Loading unloading ring 1 Each
16 5.11 Suction valve retaining plate 2 Each
17 5.12 Suction reeds 2 Each
18 5.13 Discharge reeds 2 Each
19 5.14 Oil filter inner 2 Each
20 5.15 Suction strainer 1 Each
21 5.16 Oil regulating valve 2 Each
22 5.17 Discharge valve retaining plate 2 Each
23 5.18 Crank Shaft 1 Each
24 5.19 Oil pump Assembly 1 Each
25 5.2 Connecting rod 1 Each
26 6 Rewinding of unserviceable electric motor 3 phase 50 Hz 415volt of following capacity pump set complete comprising as under :-\n(i) Disconnecting & removing the electric motor from installed position including, loading, unloading and transporting to approved workshop.\n(ii) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class 'F' insulation.\n(iii) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continously to check the RPM etc. to the satisfactory performance etc. complete.\nNote :- Any damage caused during handling/repairing shall be made good without any extra cost to department.\n
27 6.01 5.0 HP condenser water motor 1 Each Job
28 6.02 15HP compressor motor 1 Each Job
29 6.03 10 HP AHU blower motor 1 Each Job
30 7 Over hauling of Monoblock pump set after removing from the base plate, disconnecting from pipe line, dismantling the pump set, replacing unserviceable gland packing, gun metal bush bearing water seal applying grease etc. complete and reassembling the pump set connecting with pipe line reconnection of electric supply, including buts bolts, gaskets etc. complete testing of pumps for smooth functioning 5.0 HP condenser water motor complete all as specified and directed. 1 Each Job
31 8 Over hauling of compressor motors, AHU (blower motor) after disconnecting electric supply connection, base nut bolts and removing from base plate & transporting to workshop & back complete opening, pully, end cover plate replacing defective bearing greasing complete and refixing old existing location and reconnection of electric supply including necessary level and alignment, buts bolts, gaskets etc complete with following capacity of motors:-
32 8.01 15HP compressor motor 1 Each Job
33 8.02 10 HP AHU blower motor 1 Each Job
34 9 Taking down old unserviceable shaft seal assembly complete and supply and fix new shaft seal assembly suitable for central AC Plant of model SMC4-65/ ACCEL at Doom Hall all as directed by Engineer-in-Charge 1 Each
35 10 Material and labour for HVE-16 expansion valve of AC plant capacity 14TR including taking down unserviceable valve complete all as specified and directed by Engineer-in-Charge at Doom hall. Make : Sporlon or equivalent 1 Each
36 11 Pumping down the plant to preserve the existing in refrigerant gas & leak testing of plant by charging of nitrogen gas in to entire plant & monitoring for 24hrs to find the leakages, rectification of leak by brazing & replacement of necessary gasket packing wherever required including copper tubes of suitable size vacumising of the plant by vacum pump & keeping 24hrs for pressure testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning complete all as specified & as directed by Engineer-in-Charge. 1 Each Job
37 12 Dismantling of AHU carefully with top panel and side panel unserviceable pedastal bearings, shafts, motor and blower assembling, materialising and machineing the shaft, replacement of existing size of bearings reassembling the new pedastal bearing shaft blower assembly and electric motor and top / side panel in original position with new nut for smooth running all as specified and directed by Engineer-in-Charge at Doom Hall. 1 Each Job
38 13 Material and labour for disconnecting condenser for descaling, plugging them & providing of 15mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than flush with fresh water mixed with sodium carbonate tubes and cleaning with nylonbrush after closing the end covers, circulating diluted acid solution as specified above, to maintaine PH value as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure of capacity 2x14 TR plant complete all as specified & directed by Engineer-in-Charge. 2 Each Job
39 14 Removing the unserviceable liquid line valve of size 5/8mm dia from the liquid line after pumping down the compressor & supply and fixing new liquid line valve 15mm dia including connected works as required for smooth functioning of AC plants complete all as specified and directed by Engineer-in-Charge 1 Each Job
40 15 Supply and charge refrigerant R-22 Gas ISI marked. 120 Kg.
41 16 Replacement of Compressor Oil with new Compressor oil of Frizol 68 all as specified and directed by Engineer-in-Charge. 50 Ltrs.
42 17 Removing old unserviceable discharge valve 5/8mm dia and supply and fix new discharge valve of size 5/8mm dia suitable for R-22 gas discharge line all as specified & directed. Make : Castle 1 Each
43 18 Supply and fix in replacement of unserviceable / wornout 'V' belt of compressor of size B-90, AHU belt size of A-82 etc complete all as specified and directed.Make : fenner Dunlop, Nurlon or equivalent as approved 4 Each
44 19 Taking down old unserviceable AHU pre filter and supply and fix new pre filters efficiency 90% down to particular size of 10 micron double knitted twisted polymer fabric (washable) rated with press drop of 6 mm WC, including aluminium anodized frame work of 16 SWG to be mounted in AHU filter assembly size (625 x 475 x 50) mm at boat pool complete all as specified and directed. Make:DYNA/ASPAWYMAN/MHP as approved 10 Each
45 20 Replacement of unserviceable 2KW Heater strip for AC plant complete all as specified and directed. 2 Each
46 21 Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 100 mm dia complete all as specified and directed. 5 RM
47 22 Taking down old existing MS pipes, supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of sizes 80 mm dia complete all as specified and directed. 5 RM
48 23 Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes 100 mm dia complete all as specified and directed. 5 RM
49 24 Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 80 mm dia complete all as specified and directed. 5 RM
50 25 Taking down old existing GI pipes, supply, lay and welding GI pipes medium grade with all fittings laid in floors or fixed to walls and ceilings etc. sizes of 50 mm dia complete all as specified and directed. 5 RM
51 26 Supply and fix in replacement power contactors MNX type, three phase, 415V all as specified and directed by Engineer-in-Charge :- Make: L&T Cat No. MNX 40 or equivalent of Siemens/GE/Legrand 2 Each
52 27 Supply and fix in replacement power contactors MNX type, three phase, 415V all as specified and directed by Engineer-in-Charge :- Make: L&T Cat No. MNX 32 or equivalent of Siemens/GE/Legrand 2 Each
53 28 Supply and fix in replacement power contactors, three phase, 415V all as specified and directed by Engineer-in-Charge :-Make: L&T Cat No. MNX 25or equivalent of Siemens/GE/Legrand 2 Each
54 29 Supply and fix in replacement Auxliary contactors 1NO+1NC three phase, 415V all as specified and directed by Engineer-in-Charge :- Make: L&T / Siemens/GE/Legrand 2 Each
55 30 Removing the unserviceable solenoid valve 5/8" flare from the liquid line and supply and fix new solenoid valve 5/8" suitable for AC plant of various capacities complete with all as specified and as directed by Engineer-in-Charge 1 Each
56 31 Removing the unserviceable pressure gauges HP/LP/OP from existing position and supply and fixing new pressure gauge of capacity 0 to 30Kg. / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge 2 Each
57 32 Removing the unserviceable water pressure gauges from water line & supplying and fixing new water meter up to pressure 7Kg. / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge 4 Each
58 33 Material and labour for scraping cleaning & preparation of external surface & painting complete installation of 14 x 2 TR (28TR capacity) including compressor, motor, piping, cooling tower, condensor, AHU & panel board etc with two coats of synthetic enamel paint over a coat of primer as per direction on colour code as given including writing SM & MES numbers complete all as per specified & as directed by Engineer-in-Charge at Doom Hall AC Plant 1 Each Job
59 34 Material & Labour for HP/LP cut out of AC Plant MP-15 Including taking down old one complete all as specified and directed. Make:- Indofoss or equivalent as approved by GE. 1 Each
60 35 Material and labour for MP-55 oil pressure cut out controls for compressor including taking down old one complete all as specified and directed.. Make: MP 55 Indofoss or equivalent. 1 Each
61 36 Removing of old unserviceable heating coil as per suitable dia and liquid length with super lone insulation over the pipe for drainage of cold room all as directed by Engineer-in-Charge. 4 Each
62 37 Material and labour for digital thermometer for temperature suitable for cold room after removing old unserviceable thermometer. 3 Each
63 38 Material and labour for LP/HP Cut out of cold room after removing to unserviceable LP/HP cut out complete all as specified and directed. Make : Donfoss or equivalent as approved by GE. 3 Each
64 39 Replacement of running capacitor 36 MFD/45 MFD after removing old unserviceable running capacitor make : Usha/ Siemens/ Epcos 5 Each
65 40 Replacement of old unserviceable thermostat with new thermostat suitable(-)18 deg C to (-) 23deg C cold storage plant complete all as specified and directed. 2 Each
66 41 Removing old unserviceable pilot solenoid valve assembly and providing new pilot solenoid valve assembly for cold room complete all as specified and directed. 2 Each
67 42 Material and labour for replacement of old unserviceable temprature indicator complete all as specified and directed. 3 Each
68 43 Replacement of old unserviceable liquid line filter with new liquid line filter complete all as specified and directed. Make: Danfoss or equivalent as approved by GE. 2 Each
69 44 Material and labour for replacement of old unserviceable Filter drier complete all as specified and directed. 3 Each
70 45 Material and labour for expansion valve suitable for -18degC to -23degC after removing unserviceable expansion valve in cold room complete all as specified and directed. Make :- Danfoss or equivalent as approved by GE. 2 Each
71 46 Supply and fix single phase preventor complete all as specified and directed. Make: Minilec or equivalent as approved by GE. 2 Each
72 47 Replacement of starting capacitor 120MFD after removing old unserviceable capacitor complete all as specified and directed. 5 Each
73 48 Removing old unserviceable timer/ supply and fix new timer of same make and capacity all as directed by Engineer-in- Charge. 2 Each
74 49 Removing old unserviceable over load relay assembly and supply fixing new overload relay assembly of 9-15 Amps same make and capacity all as directed.Make: L & T or its equivalent 2 Each
75 50 Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) as per IS 13095 of size 80mm bore .Make: AUDCO/SANT/SIR as approved. 1 Each
76 51 Ditto - as per item No 50 above but 65 mm bore. 1 Each
77 52 Ditto - as per item No 50 above but 50 mm bore. 1 Each
78 53 Supply and fix in repairs Gate Valve of 40 mm Bore complete all as specified and directed. Make: HM//L&T/kirloskar as approved. 1 Each
79 54 Supply and fix in repairs Pot Strainer of 80 mm Bore suitable for Cooling tower pipi line complete all as specified and directed. Make: Kirloskar/Hammer/L&T as approved. 1 Each
80 55 Supply and fix flexible cord type Drain line Silicon Heater with insulation 60watt for cold room complete all as specified and directed. 5 Each
81 56 Pumping down plant to pressure the existing refrigerant gas and leak testing of plant by charging of Nitrogen gas in to entire plant and monitoring for 24hrs to find the leakages rectification of leak by brazing & replacement of gasket packing including vacumizing of the plant by vaccum pump and keep up 24hrs. for testing including rectification of leakage if any finally recharging of gas to the plant to maintain the standard pressure complete test complete all as specified and directed.
82 56.01 Cold room refrigerant unit 5TR Capacity 1 Each Job
83 56.02 Cold room refrigerant unit 3TR Capacity 1 Each Job
84 56.03 Cool room refrigerant unit 2TR Capacity 1 Each Job
85 57 Removing old unserviceable compressor from the unit after disconnecting electrical wiring and piping connection with nuts and bolts complete supply, install and testing new sealed compressor of following capacity and connecting pipe line including piping, brazing and electirc connection for cold storage at B.V yard complete all as specified and directed.
86 57.01 Refrigerant unit of Compressor 5TR Capacity 2 Each
87 57.02 Refrigerant unit of Compressor 3TR Capacity 2 Each
88 57.03 Refrigerant unit of Compressor 2TR Capacity 2 Each
89 58 Removing the worn out control wiring complete, rewiring with suitable copper conductor cable replacing the lugs starter to compressor motor, fan motor timer HP/LP cut , thermostat complete interlock wiring, checking the complete function of timer, heaters, relays, HP/LP cut outs, thermostat cut out and inter lock wiring system, testing on load and all wiring shall be mounted on cable tray of size 200mmx50mm. all as specified and directed for cold storage of following capacity:-
90 58.01 Refrigerant unit of 5TR Capacity 1 Each Job
91 58.02 Refrigerant unit of 3TR Capacity 1 Each Job
92 58.03 Refrigerant unit of 2TR Capacity 1 Each Job
93 59 Gas charging with R-404a gas with connecting accessories 120 Kg.
94 60 Removing old unserviceable condensor coil fan motor with blade assembly and providing new condensor coil fan motor with blade complete suitable for cold room outdoor unit of capacity 2tr/3tr/5tr complete all as specified and directed. 6 Each
95 61 Removing old unserviceable cooling coil fan motor with blade assembly and providing new cooling coil fan motor with blade complete suitable for cold room indoor unit of capacity 2tr/3tr/5tr complete all as specified and directed. 6 Each
96 62 Taking out old unserviceable condensor and supply & fix new condensor made out of copper pipe and aluminium fins suitable for cold/ cool room including gas charging, leakage checking and testing complete all as specified and directed. 1 Each
97 63 Supply and errect factory fabricated rectangular square duct made out of 24 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal the longitudinal joints with and including approved sealant complete all as specified and directed by Engineer-in-Charge. 10 Sqm
98 64 Taking down old unserviceable insulation from any surface and supply and fix nitrile rubber insulation of one layer of 19mm thickness sticking on surface by using approved adhesive and sealing the joints by weather proof tape all as directed by Engineer-in-Charge. 10 Sqm
99 65 Manning and operation electrical receiving substation 11KV/ 440 Volts at INS ANGRE power house by employing below mentioned man power in two shifts per day including Sunday / Holidays:\n(i) Skilled Electrician-01No. Per shift.\nNote: Shift Timing is as under:-\n(a) First shift: 0600hrs. To 1400hrs.\n(b) Second shift : 14.00hrs. To 2200 hrs. 22 Per shift/ per month
100 66 Manning and operation of electrical receiving substation 11KV/ 440 Volts at FMU power house by employing below mentioned man power in two shifts per day including Sunday / Holidays:-\n(i) Skilled Electrician-01No. Per shift.\nNote: Shift Timings are as under:-\n(a) First shift: 0600hrs. To 1400hrs.\n(b) Second shift : 14.00hrs. To 2200 hrs.\n 22 Per shift/ per month
101 67 Manning and operation electrical receiving substation 11KV/ 440 Volts at NCML power house by employing below mentioned man power in one shift per day including Sunday / Holidays:-\n(i) Skilled Electrician-01No. Per shift.\nNote: Shift Timing is as under:-\nFirst shift: 0900hrs. To 1700hrs. 11 Per shift / per month
102 68 Manning and operation electrical receiving substation 11KV/ 440 Volts at NMRL power house by employing below mentioned man power in one shift per day including Sunday / Holidays:-\n(i) Skilled Electrician-01No. Per shift.\nNote: Shift Timing is as under:-\nFirst shift: 0900hrs. To 1700hrs. 11 Per shift / per month
103 69 Manning and operation of water supply installation consisting of electrically operated pump sets of any type & capacity -02 Nos at INS Kunjali pump house (for fresh water) including taking care of any pilfrage/damage and cleaning of pumps/pump house/ pump house sorrounding daily in two shifts from 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs including sunday and holiday all as specified and directed by Engineer-in-Charge. 22 Per shift/ per month
104 70 Manning and operation of water supply installation consisting of electrically operated pump sets of any type & capacity -02 Nos at Rafiya Manzil Pump house (for fresh water) including taking care of any pilfrage/damage and cleaning of pumps/pump house/ pump house sorrounding daily in two shifts from 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs including Sunday and Holiday all as specified and directed by Engineer-in-Charge. 22 Per shift / per month
105 71 Manning and operation of water supply installation consisting of electrically operated pump sets of any type and capacity -06 No at PCDA (Navy) Pump house (for fresh water) including taking care of from any pilfrage/damage and cleaning of pumps/pump house/ pump house sorrounding daily in one shift from 0900 hrs to 1700 hrs including sunday and holiday all as specified and directed by Engineer-in-Charge. 22 Per shift / per month
106 72 Supply only CALCIUM HYPO CHLORITE high strength calcium based granular disinfectant packed in 45 Kg each plastic drum for chlorination of water/Water treatment. \nMake :Declibac/Sree Rayalaseema/Potter&Watts as approved 900 Kgs
107 73 S&F in repair sluice valves flanged end, cast iron body, flanged and drilled and non rising type brass spindle with nut, long body, class P N 16, conforing to IS 14846 of 2000 for following sizes including all flange joint with rubber or fiber board, bolts, nuts and washers complete including pumping out accumulated water all as specified and directed of make: sant/kirloskar/ kartar( ISI marked ) of following size. \n
108 73.01 200 mm bore 2 Each
109 73.02 150 mm bore 2 Each
110 73.03 100 mm bore 3 Each
111 73.04 80 mm bore 3 Each
112 74 Supply and fix in repairs in existing line, gun metal gate valve with iron wheel head screwed both ends for iron pipe including fittings i.e. union, socket etc complete all as specified of following sizes :- Make : HM/Zoloto/Leader ( ISI marked )
113 74.01 40 mm bore 5 Each
114 74.02 50 mm bore 4 Each
115 74.03 80 mm bore 2 Each
116 74.04 25 mm bore 3 Each
117 75 Supply/Fixing in repair/replacement of steel water tubing, galvanised, Medium grade with all fittings in shafts such as nipple, union, socket, elbow, bends &,laid in trenches, with all fitting including taking down existing rusted pipes for the following sizes all as directed and specified
118 75.01 20 mm bore 20 RM
119 75.02 25 mm bore 30 RM
120 75.03 40 mm bore 40 RM
121 75.04 50 mm bore 50 RM
122 75.05 80 mm bore 60 RM
123 75.06 100 mm bore 80 RM
124 76 Supply and fixing Cast iron foot valves flanged ends swing type operation with rubber seat AS PER IS :4038 of folliwing sizes
125 76.01 200 mm bore 1 Each
126 76.02 150 mm bore 1 Each
127 76.03 100 mm Bore 1 Each
128 77 Supply and fix in repair brass float valve (ISI marked) high pressure with polythelene float (flat) and fly nut complete screwed for GI pipe 50 mm bore including necessary GI fittings such as elbow, reducer, nipple etc including make threading etc complete all as specified and directed. Make : Satyam/Techno/Prayag. 5 Each
129 78 Supply and fix in repair brass float valve (ISI marked) high pressure with polythelene float (flat) and fly nut complete screwed for GI pipe 40 mm bore including necessary GI fittings such as elbow, reducer, nipple etc including make threading etc. complete all as specified and directed. Make : Satyam/Techno/Prayag. 5 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail