Up Gradation Of 66Kv Substation Karunagappally To 110 Kv - Constructing Earthmat And Equipment Foundation Up Gradation Of 66 Kv Substation Karunagappally To 110 Kv - Constructing Earth Mat And Equipment Foundation, Karunagappally-Kerala

Kerala State Electricity Board-KSEB has published Up Gradation Of 66Kv Substation Karunagappally To 110 Kv - Constructing Earthmat And Equipment Foundation Up Gradation Of 66 Kv Substation Karunagappally To 110 Kv - Constructing Earth Mat And Equipment Foundation. Submission Date for this Tender is 24-04-2020. Substation Tenders in Karunagappally Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

24104904
Corrigendum : Up Gradation Of 66Kv Substation Karunagappally To 110 Kv - Constructing Earthmat And Equipment Foundation Up Gradation Of 66 Kv Substation Karunagappally To 110 Kv - Constructing Earth Mat And Equipment Foundation
Open Tender
Indian
Kerala
Karunagappally
24-04-2020

Tender Details

Up Gradation Of 66Kv Substation Karunagappally To 110 Kv - Constructing Earthmat And Equipment Foundation Up Gradation Of 66 Kv Substation Karunagappally To 110 Kv - Constructing Earth Mat And Equipment Foundation

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 08-Apr-2020 Date Extension Date 24-04-2020

Key Value

Document Fees
INR 2975 /-
EMD
INR 50000.0 /-
Tender Value
INR 28.60 Lakhs /-

BOQ Items

Name of Work: Up gradation of 66 kV Substation, Karunagappally to 110 kV - Constructing Earth mat and Equipment foundation
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge. All kinds of soil\n 1650 m2
2 2 Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 cm in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m.as per the direction of Dept. Officers at site 380 m3
3 3 Extra for additional lift of 1.5m or part there of in excavation / banking excavated or stacked earth. for all kinds of soil. 5 m3
4 4 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) 5 m3
5 5 Cutting 32 mm MS rod (supplied departmentally) in required length etc complete as per the direction of the departmental officers. 550 Nos.
6 6 Bending 32 mm or nearest size M.S rods (supplied departmentally) for crossing cable trenches / foundation / risers etc. 350 Nos.
7 7 Driving down the ground electrode upto a depth of 3m from the already taken earth pit as directed by the departmental officers. 80 Nos.
8 8 Laying of earth mat of required size as specified using 40/32/25mm MS rod (supplied departmentally) including levelling lowering and placing in trenches, complete as per the direction of departmental officers. 205 Qtl
9 9 Welding of overlapping joints for mat,riser lap joints with 32/25mm MS rod (supplied departmentally) placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers. 450 Nos.
10 10 Welding the nodal points (cross joints ) in the trenches at two sides to a thickness of 6mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers. 1100 Nos.
11 11 Welding the ground electrode with the main electrode , after cleaning the surface neatly. Charges includes cost of low hydrogen content DC electrodes (No. E7018), hire charges of DC arc welding set, tools and plants, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers. 80 Nos.
12 12 Providing and laying in position cement concrete 1:4:8, nominal size grade excluding the cost of centering and shuttering-for foundation of walls, flooring etc ,as per the direction of Dept. Officers at site 30 m3
13 13 Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. 500 m2
14 14 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars 6500 kg
15 15 Stub setting of C1 & C2 columns in lines and levels by using template before pouring concrete in foundation with departmentally supplied stubs and removing the template after the expiry of the predetermined time 1 Set
16 16 Fixing Charges for foundation bolt in lines and levels using dept. supplied foundation bolt for all type structures including all charges for fixing and removing the template etc. complete as directed by the departmental officers at site. 100 Set
17 17 Providing and laying in position reinforced cement concrete 1:1.5:3 using 20 mm broken stone excluding the cost of centering, shuttering, finishing and reinforcement etc all work upto plinth level complete. 100 m3
18 18 Plastering with cement mortar 1:4, 12mm thick one coat floated hard and trowelled smooth including cost of cement, watering curing etc complete as per the direction of the dept: officer at site 150 m2
19 19 Back filling with available excavated earth in trenches,plinth,sides of foundation etc in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m 280 m3
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail