Western Railway-WR has published Laying And Linking Of Bg For Main And Loop Lines In Section/Yards, Transportation Of P.Way Materials, Dismantling Of Existing Bg Track, Through Rail Renewal, Regrading And Other Incidental Miscellaneous Works Between Laxmibai Nagar (Incl.) To Dewas(Incl.). Submission Date for this Tender is 13-04-2020. Dismantling Work Tenders in Madhya Pradesh. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |
---|---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item\rCode | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit | |
1 | Schedule A-SCHEDULE 'A' - NS ITEMS - P.WAY WORK | 153198800.40 | Above/\rBelow/Par | |||||||
2 | 1 | NS1 | 5250.00 | Per Track\rMetre | 128.00 | 672000.00 | AT Par | 672000.00 | ||
3 | ItemDescription:- Dismantling of existing BG track both main and loops consisting of 90R /52kg /60kg Rail\rsections laid on ST/CST/Wooden/PRC sleepers of varying density other than turn outs but including trap points\rwhich shall be treated as ordinary track etc. complete as per direction of Engineer in charge and as per special\rconditions of contract. NOTE: (a) Dismantling of switch expansion joints, level crossing including dismantling road\rsurface along with check rails, glued joints, block joints, guard rails on bridges etc. are included under this item and\rshall be paid as ordinary track.(b)The rate includes stacking of the released rails, sleepers (other than wooden\rsleepers) at stations as directed by engineer-in-charge for which no seperate payment shall be made.Payment for\rtransportation of wooden sleepers shall be made under relevant NS item. (c) All fittings and wooden sleepers shall\rbe transported to Sr. Section Engineer (C) P.Way's godown for which seperate payment shall be made. | |||||||||
4 | 2 | NS2 | 20.00 | Set | 13526.00 | 270520.00 | AT Par | 270520.00 | ||
5 | Item Description:- Dismantling existing BG points and crossings assembly complete of any rail sections laid on all\rtypes of sleepers layout including leading and stacking of all dismantled materials at suitable locations in station\ryard from where it has been dismantled as directed by Engineer in charge. The item also includes transportation\rof released materials to nominated depot except transportation of released rails and sleepers, which will be paid\rseparately if transported to any other location / yard as mentioned in the conditions. (1 In 12 Turn outs) | |||||||||
6 | 3 | NS3 | 17.00 | Set | 7379.00 | 125443.00 | AT Par | 125443.00 | ||
7 | Item Description:- Dismantling existing BG points and crossings assembly complete of any rail sections laid on all\rtypes of sleepers layout including leading and stacking of all dismantled materials at suitable locations in station\ryard from where it has been dismantled as directed by Engineer in charge. The item also includes transportation\rof released materials to nominated depot except transportation of released rails and sleepers, which will be paid\rseparately if transported to any other location / yard as mentioned in the conditions. (1 In 8-1/2 Turn outs) | |||||||||
8 | 4 | NS4 | 130000.00 | cum | 149.00 | 19370000.00 | AT Par | 19370000.00 | ||
9 | ItemDescription:- Picking up of stone ballast from Railway stack and leading the same including spreading\runiformly on BG/MG formation as per BG /MG standard profile as per IRPWM and LWR manual including dressing\rand boxing etc. complete with a lead up to 100 M including crossing of track. | |||||||||
10 | NS5 | 23982.00 | cum | 14.00 | 335748.00 | AT Par | 335748.00 |