Department Of Materials Management-DOMM has published Triennial Contract For Clearance And Transportation Of Undertaking Materials. Submission Date for this Tender is 25-05-2020. Lifting Equipment Tenders in MMD Kussara Mazgaon Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Mar-2020 | POSTPONEMENT OF TENDER I | Date | 20-04-2020 |
2 | 20-Apr-2020 | Postponement of Tender II | Date | 04-05-2020 |
3 | 05-May-2020 | Postponement of Tender III | Date | 18-05-2020 |
4 | 20-May-2020 | POSTPONEMENT OF TENDE V | Date | 25-05-2020 |
Name of Work: Triennial Contract for Clearance & Transportation of Undertaking’s Materials | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | PS1: Clearance, Transportation & Delivery of materials/ equipments without use of Crane, Forklift, etc.\nequipments without use of Crane, Forklift, etc. | |||
2 | 2 | Within Mumbai City upto Mahim & Sion: | |||
3 | 3 | Weight upto 500 Kgs. | Item-1.1.1 | 10 | Per Load |
4 | 4 | Weight above 500Kg. but upto 1000Kg. | Item-1.1.2 | 10 | Per Load |
5 | 5 | Weight above 1000Kgs. | Item-1.1.3 | 10 | MT |
6 | 6 | Within Brihan-Mumbai Municipal limit upto Dahisar & Mulund: | |||
7 | 7 | Weight upto 500 Kgs. | Item-1.2.1 | 10 | Per Load |
8 | 8 | Weight above 500Kg. but upto 1000Kg. | Item-1.2.2 | 10 | Per Load |
9 | 9 | Weight above 1000Kgs. | Item-1.2.3 | 300 | MT |
10 | 10 | PS2: Clearance, Transportation & Delivery of materials/equipments with the use of Crane, Forklift, etc. The tenderer should quote their rates by considering the requirement of minimum 4 skilled labourers for each allocated job in this Schedule. | |||
11 | 11 | Within Mumbai City upto Mahim & Sion: | |||
12 | 12 | Weight upto 0.5 MT | Item-2.1.1 | 400 | Per Load |
13 | 13 | Weight above 0.5 MT upto 1 MT | Item-2.1.2 | 500 | Per Load |
14 | 14 | Weight above 1 MT upto 3 MT | Item-2.1.3 | 400 | MT |
15 | 15 | Weight above 3 MT upto 5 MT | Item-2.1.4 | 450 | MT |
16 | 16 | Weight above 5 MT upto 10 MT | Item-2.1.5 | 200 | MT |
17 | 17 | Weight above 10 MT upto 20 MT | Item-2.1.6 | 20 | MT |
18 | 18 | Weight above 20 MT upto 30 MT | Item-2.1.7 | 20 | MT |
19 | 19 | Weight above 30 MT | Item-2.1.8 | 20 | MT |
20 | 20 | Within Brihan-Mumbai Municipal limit upto Dahisar & Mulund: | |||
21 | 21 | Weight upto 0.5 MT | Item-2.2.1 | 100 | Per Load |
22 | 22 | Weight above 0.5 MT upto 1 MT | Item-2.2.2 | 200 | Per Load |
23 | 23 | Weight above 1 MT upto 3 MT | Item-2.2.3 | 400 | MT |
24 | 24 | Weight above 3 MT upto 5 MT | Item-2.2.4 | 300 | MT |
25 | 25 | Weight above 5 MT upto 10 MT | Item-2.2.5 | 200 | MT |
26 | 26 | Weight above 10 MT upto 20 MT | Item-2.2.6 | 20 | MT |
27 | 27 | Weight above 20 MT upto 30 MT | Item-2.2.7 | 20 | MT |
28 | 28 | Weight above 30 MT | Item-2.2.8 | 20 | MT |
29 | 29 | PS3: Hiring of Skilled/Unskilled Labourers for Shifting, Loading/Unloading, Stacking, etc. | |||
30 | 30 | Hiring of skilled/unskilled labourers for material handling: | |||
31 | 31 | Hiring of Skilled Labourers for Shifting, Loading/\nUnloading, Stacking, etc. | Item-3.1.1 | 500 | Per Labour Per Shift |
32 | 32 | Hiring of Unskilled Labourers for Shifting, Loading/\nUnloading, Stacking, etc. | Item-3.1.2 | 500 | Per Labour Per Shift |
33 | 33 | PS4: Examination/Survey of Consign The tenderer should quote their rates by considering the requirement of minimum 4 unskilled labourers for each allocated job in this Schedule | |||
34 | 34 | Examination/Survey of Consign | |||
35 | 35 | Examination/Survey of Consign\nUnloading, Stacking, etc. | Item-4.1.1 | 2 | Per Package/Unit |
36 | 36 | PS5: Loading/Unloading, shifting & stacking of materials | |||
37 | 37 | For work carried out within premises of the Undertaking with The use of Crane/Forklift,etc.with 4 skilled labourers: | |||
38 | 38 | Weight upto 0.5 MT | Item-5.1.1 | 10 | Per Load |
39 | 39 | Weight above 0.5 MT upto 1 MT | Item-5.1.2 | 10 | Per Load |
40 | 40 | Weight above 1 MT upto 3 MT | Item-5.1.3 | 15 | MT |
41 | 41 | Weight above 3 MT upto 5 MT | Item-5.1.4 | 200 | MT |
42 | 42 | Weight above 5 MT upto 10 MT | Item-5.1.5 | 100 | MT |
43 | 43 | Weight above 10 MT upto 20 MT | Item-5.1.6 | 10 | MT |
44 | 44 | Weight above 20 MT upto 30 MT | Item-5.1.7 | 10 | MT |
45 | 45 | Weight above 30 MT | Item-5.1.8 | 10 | MT |
46 | 46 | For Transport of Scrap/Unserviceable Material of the Undertaking with 4 unskilled labourers without use of Crane/Forklift,etc. | |||
47 | 47 | Transport of Scrap / Unserviceable Material of Undertaking to Oshiwara Scrap Yard (Shifting, Loading / Unloading/Stacking, etc.) but within Mumbai Limit with Goods Vehicle of Minimum 10T capacity | Item-5.2.1 | 1000 | Job/Trip |
48 | 48 | Transport of Scrap/Unserviceable equipments like Power Transformers, Switchgears, RMUs, VCBs, etc. of Undertaking to Anik Scrap Yard/Dharavi Depot (Shifting/Loading/Unloading/Stacking, etc. with The use of Crane/Forklift ) but within Mumbai Limit with 4 skilled labourers: | |||
49 | 49 | Weight upto 0.5 MT | Item-5.3.1 | 100 | Per Load |
50 | 50 | Weight above 0.5 MT upto 1 MT | Item-5.3.2 | 200 | Per Load |
51 | 51 | Weight above 1 MT upto 3 MT | Item-5.3.3 | 100 | MT |
52 | 52 | Weight above 3 MT upto 5 MT | Item-5.3.4 | 100 | MT |
53 | 53 | Weight above 5 MT upto 10 MT | Item-5.3.5 | 100 | MT |
54 | 54 | Weight above 10 MT upto 20 MT | Item-5.3.6 | 10 | MT |
55 | 55 | Weight above 20 MT upto 30 MT | Item-5.3.7 | 10 | MT |
56 | 56 | Weight above 30 MT | Item-5.3.8 | 10 | MT |
57 | 57 | Transport of Scrap Tyres and other unserviceable materials like wooden planks, etc. to Anik Scrap Yard/Dharavi Depot with 4 unskilled labourers: | |||
58 | 58 | Transport of Scrap Tyres and other unserviceable materials like wooden planks, etc. to Anik Scrap Yard/Dharavi Depot \nUnloading, Stacking, etc. | Item-5.4.1 | 700 | Per Trip |
59 | 59 | Transport of New/Serviceable Tyres, Tubes & Flaps from Wadala Tyre Godown to Tyre Section at Dadar Central Workshop with 4 unskilled labourers without The use of Crane/Forklift,etc : | |||
60 | 60 | Transport of New/ Serviceable Tyres, Tubes & Flaps from Wadala Tyre Godown to Tyre Section at Dadar Central W/Shop | Item-5.5.1 | 200 | Per Trip |
61 | 61 | Transport of New/Serviceable materials like Office Furniture, Barricades, HDPE Pipes, Other Equipments, Accessories from one place to other with Goods Vehicle having minimum 10T capacity with 4 unskilled labourers without use of Crane/Forklift,etc.: | |||
62 | 62 | Transport of New/ Serviceable materials like Office Furniture, Barricades, HDPE Pipes, Other Equipments, Accessories from one place to other with Goods Vehicle having minimum 10T capacity\n | Item-5.6.1 | 20 | Per Trip |
63 | 63 | PS6: Distribution of Lubricating Oils, Greases, Engine Coolants from Oil Store at Dadar Central Workshop to various depots of the Undertaking by providing Material Lorries with proper door locking arrangement and with/without labour for loading, unloading, shifting & stacking at appropriate places (For loading of Lubricating drums/Engine Coolant drums, Diesel Forklift with operator will be provided at Oil Shed located at Dadar Central Workshop on Free of Cost basis) The tenderer should quote their rates by considering the requirement of minimum 3 skilled labourers for each allocated job in this Schedule. | |||
64 | 64 | Loading/Unloading, Shifting & Stacking of Lubricating Oil Drums, Grease Drums, Engine Coolant Drums from Oil Store at Dadar Workshop to any two depots located in a single zone: | |||
65 | 65 | Transport of Engine Lubricant Drums or Engine Coolant Drums from Oil Shed located at Dadar Central Workshop to any two depots located in City Zone in a single trip including 3 skilled labourers for material handling | Item-6.1.1 | 150 | Per Trip |
66 | 66 | Transport of Engine Lubricant Drums or Engine Coolant Drums from Oil Shed located at Dadar Central Workshop to any two depots located in Central Suburb Zone in a single trip including 3 skilled labourers for material handling | Item-6.1.2 | 150 | Per Trip |
67 | 67 | Transport of Engine Lubricant Drums or Engine Coolant Drums from Oil Shed located at Dadar Central Workshop to any two depots located in Western Suburb Zone in a single trip including 3 skilled labourers for material handling | Item-6.1.3 | 150 | Per Trip |
68 | 68 | Transport of Engine Lubricant Drums or Engine Coolant Drums from Oil Shed located at Dadar Central Workshop to any two depots located in Eastern Suburb Zone in a single trip including 3 skilled labourers for material handling | Item-6.1.4 | 150 | Per Trip |
69 | 69 | Transport of Engine Lubricant Drums or Engine Coolant Drums from Oil Shed located at Dadar Central Workshop to any two depots located in North Western Suburb Zone in a single trip including 3 skilled labourers for material handling | Item-6.1.5 | 150 | Per Trip |
70 | 70 | Transport of Engine Lubricant Drums or Engine Coolant Drums from Oil Shed located at Dadar Central Workshop to any two depots located in North Eastern Suburb Zone in a single trip including 3 skilled labourers for material handling | Item-6.1.6 | 150 | Per Trip |
71 | 71 | PS7: Clearance, Transportation of materials outside mumbai limits with the use of Crane, Forklift, etc : The tenderer should quote their rates by considering the requirement of minimum 4 skilled labourers for each allocated job in this Schedule. | |||
72 | 72 | Transporting material upto Navi Mumbai: | |||
73 | 73 | Weight upto 0.5 MT | Item-7.1.1 | 10 | Per Load |
74 | 74 | Weight above 0.5 MT upto 1 MT | Item-7.1.2 | 10 | Per Load |
75 | 75 | Weight above 1 MT upto 3 MT | Item-7.1.3 | 10 | MT |
76 | 76 | Weight above 3 MT upto 5 MT | Item-7.1.4 | 10 | MT |
77 | 77 | Weight above 5 MT upto 10 MT | Item-7.1.5 | 10 | MT |
78 | 78 | Weight above 10 MT upto 20 MT | Item-7.1.6 | 10 | MT |
79 | 79 | Weight above 20 MT upto 30 MT | Item-7.1.7 | 10 | MT |
80 | 80 | Weight above 30 MT | Item-7.1.8 | 10 | MT |
81 | 81 | Transporting material upto Thane: | |||
82 | 82 | Weight upto 0.5 MT | Item-7.2.1 | 10 | Per Load |
83 | 83 | Weight above 0.5 MT upto 1 MT | Item-7.2.2 | 10 | Per Load |
84 | 84 | Weight above 1 MT upto 3 MT | Item-7.2.3 | 10 | MT |
85 | 85 | Weight above 3 MT upto 5 MT | Item-7.2.4 | 10 | MT |
86 | 86 | Weight above 5 MT upto 10 MT | Item-7.2.5 | 10 | MT |
87 | 87 | Weight above 10 MT upto 20 MT | Item-7.2.6 | 10 | MT |
88 | 88 | Weight above 20 MT upto 30 MT | Item-7.2.7 | 10 | MT |
89 | 89 | Weight above 30 MT | Item-7.2.8 | 10 | MT |
90 | 90 | PS8: Removal of machines/collapsed material like High Mast Poles etc./Towing of vehicles met with accidents/toppled Double Decker Buses & Transformer Oil Filtration Plant, etc. The tenderer should quote their rates by considering the requirement of minimum 4 skilled labourers for each allocated job in this Schedule.\n | |||
91 | 91 | Removal of machines/collapsed material like High Mast Poles with The use of Crane/Forklift etc : | |||
92 | 92 | Upto 4 Hrs. | Item-8.1.1 | 2 | Job |
93 | 93 | Upto 8 Hrs. | Item-8.1.2 | 2 | Job |
94 | 94 | Towing of vehicles met with accidents/toppled Double Decker Buses with The use of Crane/Forklift, etc : | |||
95 | 95 | Upto 2 Hrs. | Item-8.2.1 | 2 | Job |
96 | 96 | Upto 4 Hrs. | Item-8.2.2 | 2 | Job |
97 | 97 | Upto 6 Hrs. | Item-8.2.3 | 2 | Job |
98 | 98 | Upto 8 Hrs. | Item-8.2.4 | 2 | Job |
99 | 99 | Towing of Transformer Oil Filtration Plant with use of Jeep equipped with Towing hook: | |||
100 | 100 | Upto 2 Hrs. | Item-8.3.1 | 100 | Job |
101 | 101 | Upto 4 Hrs. | Item-8.3.2 | 100 | Job |
102 | 102 | PS9: Shifting of Street Lighting Poles with Loading/Unloading activity \nThe tenderer should quote their rates by considering the requirement of minimum 4 skilled labourers for each allocated job in this Schedule.\n | |||
103 | 103 | Loading and/or Unloading & Shifting from one place to other place: | |||
104 | 104 | 1 No. Pole | Item-9.1.1 | 20 | Job |
105 | 105 | 2 No. Poles | Item-9.1.2 | 20 | Job |
106 | 106 | 3 No. Poles | Item-9.1.3 | 20 | Job |
107 | 107 | 4 No. Poles | Item-9.1.4 | 20 | Job |
108 | 108 | 5 No. Poles | Item-9.1.5 | 20 | Job |
109 | 109 | 6 Nos. to 10 Nos. Poles | Item-9.1.6 | 20 | Job |
110 | 110 | 11 Nos. to 15 Nos. Poles | Item-9.1.7 | 20 | Job |
111 | 111 | 16 Nos. to 20 Nos. Poles | Item-9.1.8 | 20 | Job |
112 | 112 | 21 Nos. to 30 Nos. Poles | Item-9.1.9 | 20 | Job |
113 | 113 | Over and Above 30 Nos. Poles | Item-9.1.10 | 20 | Job |
114 | 114 | Loading and/or Unloading & Shifting from one/many place to many/one place or many places to many places: \n | |||
115 | 115 | 1 No. Pole | Item-9.2.1 | 20 | Job |
116 | 116 | 2 No. Poles | Item-9.2.2 | 20 | Job |
117 | 117 | 3 No. Poles | Item-9.2.3 | 20 | Job |
118 | 118 | 4 No. Poles | Item-9.2.4 | 20 | Job |
119 | 119 | 5 No. Poles | Item-9.2.5 | 20 | Job |
120 | 120 | 6 Nos. to 10 Nos. Poles | Item-9.2.6 | 20 | Job |
121 | 121 | 11 Nos. to 15 Nos. Poles | Item-9.2.7 | 20 | Job |
122 | 122 | 16 Nos. to 20 Nos. Poles | Item-9.2.8 | 20 | Job |
123 | 123 | 21 Nos. to 30 Nos. Poles | Item-9.2.9 | 20 | Job |
124 | 124 | Over and Above 30 Nos. Poles | Item-9.2.10 | 20 | Job |
125 | 125 | Planting/Removal of Poles by using Crane/Labour: | |||
126 | 126 | Upto 4 Hrs. | Item-9.3.1 | 50 | Job |
127 | 127 | Upto 8 Hrs. | Item-9.3.2 | 15 | Job |
128 | 128 | PS10: Loading/unloading, stacking of material received from the Undertaking's suppliers with Crane, Forklift, etc. \nThe tenderer should quote their rates by considering the requirement of minimum 4 skilled labourers for each allocated job in this Schedule. \n | |||
129 | 129 | Loading and/or Unloading & Stacking job of single unit of material by using Labour/Forklift/Crane: | |||
130 | 130 | Weight upto 0.5 MT | Item-10.1.1 | 10 | Per Load |
131 | 131 | Weight above 0.5 MT upto 1 MT | Item-10.1.2 | 10 | Per Load |
132 | 132 | Weight above 1 MT upto 3 MT | Item-10.1.3 | 10 | MT |
133 | 133 | Weight above 3 MT upto 5 MT | Item-10.1.4 | 10 | MT |
134 | 134 | Weight above 5 MT upto 10 MT | Item-10.1.5 | 10 | MT |
135 | 135 | Weight above 10 MT upto 20 MT | Item-10.1.6 | 10 | MT |
136 | 136 | Weight above 20 MT upto 30 MT | Item-10.1.7 | 10 | MT |
137 | 137 | Weight above 30 MT | Item-10.1.8 | 10 | MT |
138 | 138 | Loading and/or Unloading & Stacking job of more units of material by using Labour/Forklift/Crane: | |||
139 | 139 | Weight upto 0.5 MT | Item-10.2.1 | 10 | Per Load |
140 | 140 | Weight above 0.5 MT upto 1 MT | Item-10.2.2 | 10 | Per Load |
141 | 141 | Weight above 1 MT upto 3 MT | Item-10.2.3 | 10 | MT |
142 | 142 | Weight above 3 MT upto 5 MT | Item-10.2.4 | 10 | MT |
143 | 143 | Weight above 5 MT upto 10 MT | Item-10.2.5 | 10 | MT |
144 | 144 | Weight above 10 MT upto 20 MT | Item-10.2.6 | 10 | MT |
145 | 145 | Weight above 20 MT upto 30 MT | Item-10.2.7 | 10 | MT |
146 | 146 | Weight above 30 MT | Item-10.2.8 | 10 | MT |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail