Indian Institute Of Management-IIMA has published Design , Supply , Installation , Testing And Commissioning Of 50Kwp Rooftop Grid Connected Solar Pv System On Turnkey Basis With Five Years ( 1 Plus 5 ) Cmc On Below Locations .. Submission Date for this Tender is 27-04-2020. Solar Power Plants Tenders in INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD Gujarat. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Mar-2020 | Corrigendum-1 | Date | 18-04-2020 |
2 | 31-Mar-2020 | Date-Corrigendum-2 | Date | 27-04-2020 |
Name of Work: <Design, Supply, Installation, Testing & Commissioning of 50kWp rooftop grid connected solar PV system on turnkey basis with Five Years (1+5) CMC. 1.) 30kWp at roof of CIIE Building – New Campus 2.) 20kWp at roof of RJM Library Building – Heritage Campus> | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | A. SITC of 20kWp\nDesign, Supply, Installation, Testing & Commissioning of 20kWp rooftop grid connected solar PV system on turnkey basis & one year all-in-all comprehensive warranty, maintenance & servicing, at Vikram Sarabhai Library, Main Campus, IIM-A. (Detailed scope of work as per the Annexure-C of the NIT Document). | 1 | ||
2 | 1.01 | Supply of all the required material including PV modules, mounting structures, Invertors, AC DC Cables, maintenance free earthing, Solar Meter, Fire extinguishers, lighting arrestors.WMS,RMS etc. | 2 | 1 | Lot |
3 | 1.02 | Installation, Testing & Commissioning of the complete system. | 3 | 1 | Lot |
4 | 2 | B. SITC of 30kWp\nDesign, Supply, Installation, Testing & Commissioning of 30kWp rooftop grid connected solar PV system on turnkey basis & one year all-in-all comprehensive warranty, maintenance & servicing, at CIIE Building, New Campus, IIM-A. (Detailed scope of work as per the Annexure-C of the NIT Document). | 4 | ||
5 | 2.01 | Supply of all the required material including PV modules, mounting structures, Invertors, AC DC Cables, maintenance free earthing, Solar Meter, Fire extinguishers, lighting arrestors,RMS etc. (W/O WMS) | 5 | 1 | Lot |
6 | 2.02 | Installation, Testing & Commissioning of the complete system. | 6 | 1 | Lot |
7 | 3 | C.CMC of 20kWp\nAll-in-all comprehensive warranty, maintenance & servicing for 20kWp rooftop grid connected solar PV system sytem at Vikram Sarabhai Library, Main Campus, IIM-A. including supply of necessary spare parts, after the end of Year-1 (Defect Liability Period). | 7 | ||
8 | 3.01 | For Year-2 | 8 | 1 | Year |
9 | 3.02 | For Year-3 | 9 | 1 | Year |
10 | 3.03 | For Year-4 | 10 | 1 | Year |
11 | 3.04 | For Year-5 | 11 | 1 | Year |
12 | 3.05 | For Year-6 | 12 | 1 | Year |
13 | 4 | D. CMC of 30kWp\nAll-in-all comprehensive warranty, maintenance & servicing for 30kWp rooftop grid connected solar PV system sytem at CIIE Building, New Campus, IIM-A including supply of necessary spare parts, after the end of Year-1 (Defect Liability Period). | 13 | ||
14 | 4.01 | For Year-2 | 14 | 1 | Year |
15 | 4.02 | For Year-3 | 15 | 1 | Year |
16 | 4.03 | For Year-4 | 16 | 1 | Year |
17 | 4.04 | For Year-5 | 17 | 1 | Year |
18 | 4.05 | For Year-6 | 18 | 1 | Year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail