Military Engineer Services-MES has published Maintenance And Repair To Air Conditioners Water Coolers Refrigerators And Other Connected Items At Worli Powai Mankhurd At Mumbai. Submission Date for this Tender is 12-05-2020. Air Conditioner Tenders in M Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Mar-2020 | 8469AMENDMENTINDATE | Date | 01-04-2020 |
2 | 30-Mar-2020 | 8469AMENDMENTTODATE | Date | 17-04-2020 |
3 | 15-Apr-2020 | 8469AMENDMENTINDATE3 | Date | 05-05-2020 |
4 | 05-May-2020 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 12-05-2020 |
Name of Work:- MAINTENANCE AND REPAIR TO ACs, WATER COOLERS, REFRIGERATORS AND OTHER CONNECTED ITEMS AT WORLI, POWAI, MANKHURD AT MUMBAI. c | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Material and labour for checking the split type air conditioner/window type air conditioner/water cooler /Refrigerator/Deep Freezer of any tyep/capacity situated at any height/place for the serviceability and minor repair at site grill tightening, valve tightening, tightening of anchor fastners, secure cable connections/PVC piping,voltage stabilizer connections etc complete all as specified. Notes:- Tools, Tapes, nuts are deemed in quoted rates | Material and labour for checking the split type air conditioner/window type air conditioner/water cooler /refrigerator for the serviceability and minor repair at site grill tightening, valve tightening, tightening of anchor fastners, secure cable connections/PVC piping,voltage stabilizer connections, complete all as specified. Notes:- Tools, Tapes, nuts are deemed in quoted rates | 82 | Job |
2 | 2 | Taking out window type air conditioner for servicing and overhauling at wksp of capacity 1.5/2.0 TR of any make/type after disconnecting of electric connection, removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blower and also including carrying out servicing,overhauling and charging of refrigerant gas and testing including fixing back in its original location complete all as specified and directed. | Taking out window type air conditioner for servicing and overhauling at wksp of capacity 1.5/2.0 TR of any make/type after disconnecting of electric connection, removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blower and also including carrying out servicing,overhauling and charging of refrigerant gas and testing including fixing back in its original location complete all as specified and directed. | 14 | Job |
3 | 3 | Taking out split type air conditioner (both indoor and outdoor units) for servicing and overhauling at wksp of capacity 1.5/2.0 TR of any make/type after disconnecting refrigerant pipes, drain pipe and electric connection, removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blower and also including carrying out servicing, overhauling and connecting of refrigerant pipe,drain pipe and charging of refrigerant gas and testing including fixing back in its original location complete all as specified and directed. | Taking out split type air conditioner (both indoor and outdoor units) for servicing and overhauling at wksp of capacity 1.5/2.0 TR of any make/type after disconnecting refrigerant pipes, drain pipe and electric connection, removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blower and also including carrying out servicing, overhauling and connecting of refrigerant pipe,drain pipe and charging of refrigerant gas and testing including fixing back in its original location complete all as specified and directed. | 65 | Job |
4 | 4 | Taking out Refrigerator for servicing and overhauling upto 345 ltr capacity of any make/type after disconnecting of electric connection and cleaning all the components, checking and replacing the spares like relay, capacitors, thermostat,fused bulb and also including carrying out servicing, overhauling and charging of refrigerant gas and testing complete all as specified and directed. | Taking out Refrigerator for servicing and overhauling upto 345 ltr capacity of any make/type after disconnecting of electric connection and cleaning all the components, checking and replacing the spares like relay, capacitors, thermostat,fused bulb and also including carrying out servicing, overhauling and charging of refrigerant gas and testing complete all as specified and directed. | 12 | Job |
5 | 5 | Taking out water cooler for servicing and overhauling upto150 ltr capacity of any make/type after disconnecting of electric connection, removing dust by using blower and cleaning all the components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, PVC pipes, push cock/liftcock, float valves etc and also including carrying out servicing,overhauling and charging of refrigerant gas and testing and fixing back in its original location complete all as specified and directed.Note for item Nos.2 to 5 :- (i) Spares will be measured and paid separately as supply only. (ii) Refrigerant gas will be measured and paid separately as supply only. | Taking out water cooler for servicing and overhauling upto150 ltr capacity of any make/type after disconnecting of electric connection, removing dust by using blower and cleaning all the components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, PVC pipes, push cock/liftcock, float valves etc and also including carrying out servicing,overhauling and charging of refrigerant gas and testing and fixing back in its original location complete all as specified and directed.Note for item Nos.2 to 5 :- (i) Spares will be measured and paid separately as supply only. (ii) Refrigerant gas will be measured and paid separately as supply only. | 12 | Job |
6 | 6 | Supply and fix hermetically sealed compressor of window type air conditioner of 1.5 TR capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. \nMake :Voltas/Hitachi/Tecumseh/Kirloskar/LG/Blue Star | Supply and fix hermetically sealed compressor of split type air conditioner of 1.5 TR capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. Make : Voltas/Hitachi/Tecumseh/Kirloskar/LG/Blue Star | 6 | Each |
7 | 7 | Supply and fix hermetically sealed compressor of split type air conditioner of 1.5 TR capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. Make :Voltas/Hitachi/Tecumseh/Kirloskar/LG/Blue Star | Supply and fix hermetically sealed compressor of split type air conditioner of 2.0 TR capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. Make:Voltas/Hitachi/Tecumseh/Kirloskar/LG/Blue Star | 18 | Each |
8 | 8 | Supply and fix hermetically sealed compressor of split type air conditioner of 2.0 TR capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. \n Make :Voltas/Hitachi/Tecumseh/Kirloskar/LG/Blue Star | Supply and fix hermetically sealed compressor of Refrigerator upto 180 litres capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. \nMake: Voltas/Kelvinator/Tecumseh/Kirloskar/Usha/Godrej | 16 | Each |
9 | 9 | Supply and fix hermetically sealed compressor of Refrigerator 210 to 345 litres capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. \nMake: LG/Voltas/Kelvinator/Tecumseh/Kirloskar/Usha/Godrej | Supply and fix hermetically sealed compressor of Refrigerator 210 to 345 litres capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. \nMake: LG/Voltas/Kelvinator/Tecumseh/Kirloskar/Usha/Godrej | 4 | Each |
10 | 10 | Supply and fix hermetically sealed compressor for water cooler 20/40 Litres capacity including initial filling of refrigerant gas to the required pressure and testing, including removing the old unserviceable compressor complete all as specified and directed \nMake : Voltas/Blue Star /Tecumseh/Kirloskar/Usha. | Supply and fix hermetically sealed compressor for water cooler 20/40 Litres capacity including initial filling of refrigerant gas to the required pressure and testing, including removing the old unserviceable compressor complete all as specified and directed Make: Voltas/Blue Star /Tecumseh/Kirloskar/Usha. | 5 | Each |
11 | 11 | Supply and fix hermetically sealed compressor for water cooler 40/80 litres capacity including initial filling of refrigerant gas to the required pressure and testing, including removing the old unserviceable compressor complete all as specified and directed. \nMake : Voltas/Blue Star /Tecumseh/Kirloskar/Usha. | Supply and fix hermetically sealed compressor for water cooler 40/80 litres capacity including initial filling of refrigerant gas to the required pressure and testing, including removing the old unserviceable compressor complete all as specified and directed. Make: Voltas/Blue Star/Tecumseh/Kirloskar/Usha | 5 | Each |
12 | 12 | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering,flaring work with nut, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in split type air conditioner upto 2 TR capacity and testing complete all as specified and directed | Supply and fix hermetically sealed compressor for water cooler 120/150 litre capacity including initial filling of refrigerant gas to the required pressure and testing, including removing the old unserviceable compressor complete all as specified and directed. Make: Voltas/Blue Star/Tecumseh/Kirloskar/Usha \n | 16 | Job |
13 | 13 | Leak testing the complete gas circulating system with dry nitrogen &evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in window type air conditioner upto 2 TR capacity and testing complete all as specified and directed. | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering,flaring work with nut, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in split type air conditioner upto 2 TR capacity and testing complete all as specified and directed | 12 | Job |
14 | 14 | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in water cooler upto 80 litres cooling capacity and testing complete all as specified and directed. | Leak testing the complete gas circulating system with dry nitrogen &evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in window type air conditioner upto 2 TR capacity and testing complete all as specified and directed. | 4 | Job |
15 | 15 | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in Refrigerator/Deep freezer upto 345 ltr capacity and testing complete all as specified and directed. Note for item Nos .12 to 15 :- Refrigerant gas will be measured and paid separately as supply only. | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in water cooler upto 80 litres cooling capacity and testing complete all as specified and directed. | 4 | Job |
16 | 16 | Replacing the corroded portion of the water cooler upto 150 ltr capacity of any type/ make and providing the same gauge sheet in corroded portion by bending/welding, soldering and painting the replaced portion to match with existing colour and also providing base support legs complete all as specified and directed. | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in water cooler 120/150 litres cooling capacity and testing complete all as specified and directed. | 5 | Job |
17 | 17 | Material and labour for spray painting to water coolers upto 150 ltr capacity of any type /make with two coats of synthetic enamel paint over one coat of red oxide primer after preparation of surfaces and including removing dents complete all as specified and directed. | Leak testing the complete gas circulating system with dry nitrogen & evacuate and rectifying/arresting leakage by cutting, soldering, jointing of refrigerant tubing and charging of refrigerant gas to the required pressure in Refrigerator/Deep freezer upto 345 ltr capacity and testing complete all as specified and directed. Note for item Nos .12 to 17 :- Refrigerant gas will be measured and paid separately as supply only. | 7 | Job |
18 | 18 | Replacing the corroded outer casing with base plate of the window type air conditiner of capacity upto 2 TR of any type/ make and supply and fix outer casing complete with base plate made out of GI sheet suitable to window type air conditioner of capacity upto 2 TR complete all as specified and directed. | Replacing the corroded portion of the water cooler upto 150 ltr capacity of any type/ make and providing the same gauge sheet in corroded portion by bending/welding, soldering and painting the replaced portion to match with existing colour and also providing base support legs complete all as specified and directed. | 5 | Job |
19 | 19 | Supply and fix in repair MS wall bracket prefabricated, duly painted suitable for fixing of out door unit of split type Air Conditioner with necessary nuts, bolts & washers and removing old unserviceable items and making good disturbed surfaces to match with the existing complete all as specified and directed | Material and labour for spray painting to water coolers upto 150 ltr capacity of any type /make with two coats of synthetic enamel paint over one coat of red oxide primer after preparation of surfaces and including removing dents complete all as specified and directed. | 8 | Set of Two |
20 | 20 | Supply and fix in repair voltage stabilizer 10 Amps, single phase, 240 volts, AC, 50 Hz of working range 170 volts - 270 volts, time delay 3 minutes +/-2.5%, wall mounting type, complete all as specified and directed Make :-V-guard Model No VG 400AC or equivalent Model of Make Capri/Vintech as approved by the GE. | Replacing the corroded outer casing with base plate of the window type air conditiner of capacity upto 2 TR of any type/ make and supply and fix outer casing complete with base plate made out of GI sheet suitable to window type air conditioner of capacity upto 2 TR complete all as specified and directed. | 8 | Each |
21 | 21 | Supply and fix in repair voltage stabilizer 12.5 Amps, single phase, 240 volts, AC,50 Hz of working range 170 volts - 270 volts, time delay 3 minutes +/-2.5%, wall mounting type, complete all as specified and directed. \nMake : V-guard Model No VG 500 AC or equivalent Model of make Capri/Vintech as approved by the GE. | Supply and fix in repair indoor unit of the split type air conditioner 1.5 TR capacity having 3 Star Rating complete with all accessories such as installation plate with screws, blower motor, swing motor, filters and PCB etc duly prewired and including reconnecting of existing refrigerant piping, electrical connections, drain pipe etc, and testing including removing old unserviceable items complete all as specified and directed.Make: Carrier/LG/Hitachi/Blue star/Voltas. | 8 | Each |
22 | 22 | Supply and fix in repair sheet metal enclosure with 2 pin earth plug and socket including MCB, SP, 20 to 32 Amps, 10 KA 'C' series and also including removing old unserviceable items all as specified and directed.\n | Supply and fix in repair outdoor unit of the split type air conditioner 1.5 TR capacity, having 3 Star Rating complete with all accessories such as hermetically sealed compressor, condenser unit, capacitors, relays, fan motor, duly prewired and including reconnecting of existing refrigerant gas piping, electrical connections, etc and testing including removing old unserviceable items complete all as specified and directed. Make: Carrier/LG/Hitachi/Blue star/Voltas. | 8 | Each |
23 | 23 | Supply only relay assembly suitable for window type / split type air conditioner 1.5/2.0 TR capacity complete all as specified and directed. \nMake:-Arvind/Usha/Ranutral | Supply and fix in repair indoor unit of the split type air conditioner 2 TR capacity having 3 Star Rating complete with all accessories such as installation plate with screws, blower motor, swing motor, filters and PCB etc duly prewired and including reconnecting of existing refrigerant piping, electrical connections, drain pipe etc, and testing including removing old unserviceable items complete all as specified and directed.Make: Carrier/LG/Hitachi/Blue star/Voltas. | 5 | Each |
24 | 24 | Removing the unserviceable 3 pin industrial plug top and supply and fix new 3 pin industrial plug top, ISI marked suitable for industrial metal clad socket, single phase, 240 volts,20 Amps including connecting complete all as specified and directed | Supply and fix in repair outdoor unit of the split type air conditioner 2 TR capacity, having 3 Star Rating complete with all accessories such as hermetically sealed compressor, condenser unit, capacitors, relays, fan motor, duly prewired and including reconnecting of existing refrigerant gas piping, electrical connections, etc and testing including removing old unserviceable items complete all as specified and directed. Make: Carrier/LG/Hitachi/Blue star/Voltas. | 6 | Each |
25 | 25 | Removing the old unserviceable copper cable after disconnecting electrical connections and supply and fix PVC insulated,sheathed,multistandard,1100 volts grade copper conductor cable of size 2.5 sqmm;3 core complete all as specified and directed.Make:- Finolex/Havells/Plaza/Polycab | Supply and fix in repair MS wall bracket prefabricated, duly painted suitable for fixing of out door unit of split type Air Conditioner with necessary nuts, bolts & washers and removing old unserviceable items and making good disturbed surfaces to match with the existing complete all as specified and directed | 65 | RM |
26 | 26 | Supply only starting capacitor 60-80 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | Supply and fix in repair voltage stabilizer 10 Amps, single phase, 240 volts, AC, 50 Hz of working range 170 volts - 270 volts, time delay 3 minutes +/-2.5%, wall mounting type, complete all as specified and directed Make:-V-guard Model No VG 400AC or equivalent Model of Make Capri/Vintech as approved by the GE. | 15 | Each |
27 | 27 | Supply only starting capacitor 80-100 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | Supply and fix in repair voltage stabilizer 12.5 Amps, single phase, 240 volts, AC,50 Hz of working range 170 volts - 270 volts, time delay 3 minutes +/-2.5%, wall mounting type, complete all as specified and directed. \nMake : V-guard Model No VG 500 AC or equivalent Model of make Capri/Vintech as approved by the GE. | 18 | Each |
28 | 28 | Supply only starting capacitor 100-120 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | Supply only relay assembly suitable for window type / split type air conditioner 1.5/2.0 TR capacity complete all as specified and directed. \nMake:-Arvind/Usha/Ranutral | 8 | Each |
29 | 29 | Supply only running capacitor 25 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | Supply only starting capacitor 60-80 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | 14 | Each |
30 | 30 | Supply only running capacitor 36 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | Supply only starting capacitor 80-100 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | 12 | Each |
31 | 31 | Supply only running capacitor 45 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | Supply only starting capacitor 100-120 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | 6 | Each |
32 | 32 | Supply only blower fan motor for window type air conditioner upto 2 TR capacity complete all as specified and directed. Make : American Universal/ AUE or equivalent ISI marked as approved by the GE. | Supply only running capacitor 25 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | 7 | Each |
33 | 33 | Supply only blower fan blade upto 2 TR window type air conditioner complete all as specified and directed. \n | Supply only running capacitor 36 mfd complete all as specified and directed. Make : Concap/Keltron/Asian/Tesla | 7 | Each |
34 | 34 | Supply only selector switch push button type suitable for window type AC upto 2.0 TR capacity complete all as specified and directed.\nMake : Fedderlloyd/Arco/Usha/Voltas/Rotar Switch. | Supply and fix hermetically sealed compressor of window type air conditioner of 1.5 TR capacity including initial filling of refrigerant gas to the required pressure and testing including removing old unserviceable compressor complete all as specified and directed. Make: LG/Voltas/Hitachi/Tecumseh/Kirloskar/LG/Blue Star. | 6 | Each |
35 | 35 | Supply only selector switch rotary type suitable for window type AC upto 2.0 TR capacity complete all as specified and directed.\nMake : Fedderlloyd/Arco/Usha/Voltas/Rotar Switch.\n | Supply only blower fan motor for window type air conditioner upto 2 TR capacity complete all as specified and directed. Make : American Universal/ AUE or equivalent ISI marked as approved by the GE. | 6 | Each |
36 | 36 | Supply and fix over load protector for window type air conditioner upto 2.0 TR capacity including removing old unserviceable item and testing etc \nMake: USHA/ RANUTRAL | Supply only blower fan blade upto 2 TR window type air conditioner complete all as specified and directed. \n | 6 | Each |
37 | 37 | Supply only thermostat switch for window type / Split type AC any type make upto 2 TR capacity complete all as specified and directed. \nMake: INDOFOSS/ RANUTRAL | Supply only selector switch push button type suitable for window type AC upto 2.0 TR capacity complete all as specified and directed.\nMake : Fedderlloyd/Arco/Usha/Voltas/Rotar Switch. | 7 | Each |
38 | 38 | Supply only thermostat switch for Refrigerator of any capacity complete all as specified and directed.Make: INDOFOSS/ RANUTRAL. | Supply only selector switch rotary type suitable for window type AC upto 2.0 TR capacity complete all as specified and directed.\nMake : Fedderlloyd/Arco/Usha/Voltas/Rotar Switch.\n | 5 | Each |
39 | 39 | Supply only thermostat switch for Water Cooler of any capacity complete all as specified and directed. Make: INDOFOSS/ RANUTRAL | Supply and fix over load protector for window type air conditioner upto 2.0 TR capacity including removing old unserviceable item and testing etc \nMake: USHA/ RANUTRAL | 5 | Each |
40 | 40 | Supply only refrigerant gas suitable for Air conditioners/water cooler/Deep freezers/Refrigerator complete all as specified and directed. Make: Mafron or equivalent makes as approved by the GE. | Supply only thermostat switch for window type / Split type AC any type make upto 2 TR capacity complete all as specified and directed. \nMake: INDOFOSS/ RANUTRAL | 67 | Kg |
41 | 41 | Supply only contactor, AC, 230 volts ,50Hz, suitable for split/Window ACs upto 2.00 TR capacity complete all as specified and directed.\n | Supply only thermostat switch for Refrigerator of any capacity complete all as specified and directed.Make: INDOFOSS/ RANUTRAL. | 10 | Each |
42 | 42 | Taking down remote control PCB board from indoor unit of split type AC of 1.5/2.0 TR capacity and checking the electronic circuit and rectifying the defects by replacing the defective components with new ones and testing complete all as specified and directed. | Supply only thermostat switch for Water Cooler of any capacity complete all as specified and directed. Make: INDOFOSS/ RANUTRAL | 12 | Each |
43 | 43 | Removing the old unserviceable swing motor of any type and supply and fix new swing motor of 1.5/2.0 TR capacity split type ACs complete all as specified and directed. | Supply only refrigerant gas suitable for Air conditioners/water cooler/Deep freezers complete all as specified and directed. Make: Mafron or equivalent makes as approved by the GE. | 7 | Each |
44 | 44 | Supply & fix blower drum suitable for split type ACs upto 1.5/ 2.0 TR capacity including removing old unserviceable item and testing complete all as specified and directed. | -ditto- all as per item No. 43 above but for refrigerator\n | 5 | Each |
45 | 45 | Supply and fix blower motor suitable for split type AC 1.5/2.0 TR capacity including removing old unserviceable item and testing complete all as specified and directed. | Supply only contactor, AC, 230 volts ,50Hz, suitable for split/Window ACs upto 2.00 TR capacity complete all as specified and directed.\n | 5 | Each |
46 | 46 | Taking out old unserviceable grill cover and supply and fix plastic or acrylic grill cover for window type AC upto 2.0 ton capacity of various makes etc complete all as specified and directed. | Taking down remote control PCB board from indoor unit of split type AC of 1.5/2.0 TR capacity and checking the electronic circuit and rectifying the defects by replacing the defective components with new ones and testing complete all as specified and directed. | 5 | Each |
47 | 47 | Supply only fan capacitor 4 mfd complete all as specified and directed.Make : ASIAN/ KEL/Epcos \n | Removing the old unserviceable swing motor of any type and supply and fix new swing motor of 1.5/2.0 TR capacity split type ACs complete all as specified and directed. | 12 | Each |
48 | 48 | Supply only fan capacitor 6 mfd complete all as specified and directed.\nMake : ASIAN/ KEL/Epcos | Supply & fix blower drum suitable for split type ACs upto 1.5/ 2.0 TR capacity including removing old unserviceable item and testing complete all as specified and directed. | 8 | Each |
49 | 49 | Removing the old acoustic padding and supply and fix new acoustic ('U' form) padding with all packing material for refrigerant tubing from outdoor unit to indoor unit all as specified and directed. | Supply and fix blower motor suitable for split type AC 1.5/2.0 TR capacity including removing old unserviceable item and testing complete all as specified and directed. | 30 | Job |
50 | 50 | Taking out the unserviceable air filter and supply and fix new filter cleanable indigenous of suitable size for the split type ACs of 1.5/2.0 TR capacity complete all as specified and directed. | Taking out old unserviceable grill cover and supply and fix plastic or acrylic grill cover for window type AC upto 2.0 ton capacity of various makes etc complete all as specified and directed. | 12 | Each |
51 | 51 | Taking out the old unserviceable PVC drain pipe from wall at any height and including its fittings and supply and fix new PVC pipe 25 mm dia, ISI marked including bends, tees, elbows, sockets, saddles, etc for condensed water complete all as directed. | Supply only fan capacitor 4 mfd complete all as specified and directed. \nMake: Asian/ KEL/Epcos | 50 | RM |
52 | 52 | Taking out the old unserviceable PVC drain pipe from wall at any height and including its fittings and supply and fix new PVC pipe 40 mm dia, ISI marked including bends, tees, elbows, sockets, saddles, etc for condensed water complete all as directed. | Supply only fan capacitor 6 mfd complete all as specified and directed.\nMake: ASIAN/ KEL/Epcos | 50 | RM |
53 | 53 | Taking out the old unserviceable capillary tube and supply and fix new capillary tube with strainer for the split type ACs 1.5/2 TR capacity complete all as specified and directed. | Removing the old acoustic padding and supply and fix new acoustic ('U' form) padding with all packing material for refrigerant tubing from outdoor unit to indoor unit all as specified and directed. | 8 | Each |
54 | 54 | Taking out the unserviceable condenser fan motor by disconnecting all electrical connections and supply and fix new condenser fan motor for split ACs upto 2.0TR Capacity and testing complete all as specified and directed | Taking out the unserviceable air filter and supply and fix new filter cleanable indigenous of suitable size for the split type ACs of 1.5/2.0 TR capacity complete all as specified and directed. | 12 | Each |
55 | 55 | Disconnecting and taking out the old unserviceable copper tubing and supply and fix copper tube of size 3/8" dia including necessary soldering, flaring work and jointing testing in between indoor to outdoor units of split type AC's complete all as directed | Taking out the old unserviceable PVC drain pipe from wall at any height and including its fittings and supply and fix new PVC pipe 25 mm dia, ISI marked including bends, tees, elbows, sockets, saddles, etc for condensed water complete all as directed. | 26 | RM |
56 | 56 | All as per item No 55 above but size of copper tube 1/2" dia complete all as specified and directed | Taking out the old unserviceable PVC drain pipe from wall at any height and including its fittings and supply and fix new PVC pipe 40 mm dia, ISI marked including bends, tees, elbows, sockets, saddles, etc for condensed water complete all as directed. | 15 | RM |
57 | 57 | All as per item No 55 above but size of copper tube 1/4" dia complete all as specified and directed | Taking out the old unserviceable capillary tube and supply and fix new capillary tube with strainer for the split type ACs 1.5/2 TR capacity complete all as specified and directed. | 15 | RM |
58 | 58 | Removing the old unserviceable defective hand remote control for split AC and supply and fix new hand remote control with 2 Nos batteries and testing complete all as specified and directed | Taking out the unserviceable condenser fan motor by disconnecting all electrical connections and supply and fix new condenser fan motor for split ACs upto 2.0TR Capacity and testing complete all as specified and directed | 6 | Each |
59 | 59 | Removing old unserviceable condenser coil assembly from window type and split type air conditioner upto 2 TR capacity supply and fix copper condenser coil assembly with all accessories suitable to existing make/type and testing complete all as specified and directed. | Disconnecting and taking out the old unserviceable copper tubing and supply and fix copper tube of size 3/8" dia including necessary soldering, flaring work and jointing testing in between indoor to outdoor units of split type AC's complete all as directed | 6 | Each |
60 | 60 | Removing old unserviceable cooling coil assembly from window type and split type air conditioner upto 2 TR capacity supply and fix copper cooling coil assembly with all accessories suitable to existing make/type and testing complete all as specified and directed. | All as per item No 60 above but size of copper tube 1/2" dia complete all as specified and directed | 7 | Each |
61 | 61 | Removing old unserviceable 2-3 way refrigerant control valve from splity air conditioner outdoor unit after evacuating of refrigrant gas and supply and fix 2-3 way valve suitable for split type ACs of capacity upto 2 TR and testing complete all as specified and directed. | All as per item No 60 above but size of copper tube 1/4" dia complete all as specified and directed | 7 | Each |
62 | 62 | Dismantling of the split type air conditioner of capacity 1.5/2.0 TR from the existing position and shifting the same to the new altered location, complete indoor and outdoor units, refrigerant tubing, MS stand, stablizer and cable etc and testing complete all as specified and directed | Removing the old unserviceable copper cable after disconnecting electrical connections and supply and fix PVC insulated,sheathed,multistandard,1100 volts grade copper conductor cable of size 2.5 sqmm;3 core complete all as specified and directed.Make:- Finolex/Havells/Plaza/Polycab | 8 | Each |
63 | 63 | Supply and fix in repairs PVC connecting pipe of 15 mm bore with brass nuts and washers at both ends of length n.exc. 60 cms for connecting of water coolers complete all as specified and directed | Removing the old unserviceable defective hand remote control for split AC and supply and fix new hand remote control with 2 Nos batteries and testing complete all as specified and directed | 4 | Each |
64 | 64 | Supply and fix fan motor for water cooler upto 150 Ltrs capacity & testing including removing old unserviceable item complete all as specified and directed.\n\nSchedule of Credit:- Rs 50,440.00 | Supply and fix in repairs PVC connecting pipe of 15 mm bore with brass nuts and washers at both ends of length n.exc. 60 cms for connecting of water coolers complete all as specified and directed | 5 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail