Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Shifting Of Motors Rotors Stators And Replacement Of Bearings Of Various Motors And Laying Dressing Tagging Making End Termination Making Straight Through Joint And Removal Of Old Cable Of Unit No 7 C Tps Kasimpur. Submission Date for this Tender is 25-04-2020. Bearings Tenders in Office of the SE OMC-IV DTPS Kasimpur Aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 08-Apr-2020 | Date Extension 3 | Date | 25-04-2020 |
Name of Work: Shifting of Motors/Rotors/Stators and replacement of bearings of various motors & Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | JOB1:-Shifting of Motors/\nRotors/Stators and replacement of bearings of various motors.\n(A) Motor of capacity upto 25-60KW | BI01010001010000000000000515BI0100001110 | ||
2 | 1.01 | 2.Opening & tightening of foundation bolt. | BI01010001010000000000000515BI0100001112 | 1 | No |
3 | 1.02 | 3. Removal & insertion of coupling | BI01010001010000000000000515BI0100001113 | 1 | No |
4 | 1.03 | 4. Opening & reassembling of motor driving end cover | BI01010001010000000000000515BI0100001188 | 1 | No |
5 | 1.04 | 5.Opening & reassembling of motor non driving end cover | BI01010001010000000000000515BI0100001115 | 1 | No |
6 | 1.05 | 6.Replacement of DE side bearing | BI01010001010000000000000515BI0100001189 | 1 | No |
7 | 1.06 | 7.Replacement of NDE side bearing | BI01010001010000000000000515BI0100001117 | 1 | No |
8 | 1.07 | 8.Shifting of Stator | BI01010001010000000000000515BI0100001190 | 1 | No |
9 | 1.08 | 9.Shifting of Rotor | BI01010001010000000000000515BI0100001119 | 1 | No |
10 | 1.09 | 10. Repairing of stator holes and finishing the foundation | BI01010001010000000000000515BI0100001120 | 1 | No |
11 | 1.1 | 11. Shifting of complete motor | BI01010001010000000000000515BI0100001121 | 1 | No |
12 | 1.11 | 12. Dismantling of motor | BI01010001010000000000000515BI0100001122 | 1 | No |
13 | 1.12 | 13 . Assembling of motor | BI01010001010000000000000515BI0100001191 | 1 | No |
14 | 2 | JOB1:-Shifting of Motors/\nRotors/Stators and replacement of bearings of various motors. (B)Motor of capacity upto 61-110KW. | BI01010001010000000000000515BI0100001124 | ||
15 | 2.01 | 2.Opening & tightening of foundation bolt. | BI01010001010000000000000515BI0100001192 | 1 | No |
16 | 2.02 | 3. Removal & insertion of coupling | BI01010001010000000000000515BI0100001126 | 1 | No |
17 | 2.03 | 4. Opening & reassembling of motor driving end cover | BI01010001010000000000000515BI0100001193 | 1 | No |
18 | 2.04 | 5.Opening & reassembling of motor non driving end cover | BI01010001010000000000000515BI0100001127 | 1 | No |
19 | 2.05 | 6.Replacement of DE side bearing | BI01010001010000000000000515BI0100001194 | 1 | No |
20 | 2.06 | 7.Replacement of NDE side bearing | BI01010001010000000000000515BI0100001128 | 1 | No |
21 | 2.07 | 8.Shifting of Stator | BI01010001010000000000000515BI0100001129 | 1 | No |
22 | 2.08 | 9.Shifting of Rotor | BI01010001010000000000000515BI0100001130 | 1 | No |
23 | 2.09 | 10. Repairing of stator holes and finishing the foundation | BI01010001010000000000000515BI0100001131 | 1 | No |
24 | 2.1 | 11. Shifting of complete motor | BI01010001010000000000000515BI0100001132 | 1 | No |
25 | 2.11 | 12. Dismantling of motor | BI01010001010000000000000515BI0100001133 | 1 | No |
26 | 2.12 | 13 . Assembling of motor | BI01010001010000000000000515BI0100001123 | 1 | No |
27 | 3 | JOB1:-Shifting of Motors/\nRotors/Stators and replacement of bearings of various motors. (C)Motor of capacity upto 111-200KW | BI01010001010000000000000515BI0100001134 | ||
28 | 3.01 | 2.Opening & tightening of foundation bolt. | BI01010001010000000000000515BI0100001136 | 1 | No |
29 | 3.02 | 3. Removal & insertion of coupling | BI01010001010000000000000515BI0100001137 | 1 | No |
30 | 3.03 | 4. Opening & reassembling of motor driving end cover | BI01010001010000000000000515BI0100001138 | 1 | No |
31 | 3.04 | 5.Opening & reassembling of motor non driving end cover | BI01010001010000000000000515BI0100001139 | 1 | No |
32 | 3.05 | 6.Replacement of DE side bearing | BI01010001010000000000000515BI0100001140 | 1 | No |
33 | 3.06 | 7.Replacement of NDE side bearing | BI01010001010000000000000515BI0100001141 | 1 | No |
34 | 3.07 | 8.Shifting of Stator | BI01010001010000000000000515BI0100001142 | 1 | No |
35 | 3.08 | 9.Shifting of Rotor | BI01010001010000000000000515BI0100001143 | 1 | No |
36 | 3.09 | 10. Repairing of stator holes and finishing the foundation | BI01010001010000000000000515BI0100001144 | 1 | No |
37 | 3.1 | 11. Shifting of complete motor | BI01010001010000000000000515BI0100001145 | 1 | No |
38 | 3.11 | 12. Dismantling of motor | BI01010001010000000000000515BI0100001146 | 1 | No |
39 | 3.12 | 13 . Assembling of motor | BI01010001010000000000000515BI0100001147 | 1 | No |
40 | 4 | JOB1:-Shifting of Motors/\nRotors/Stators and replacement of bearings of various motors. (D)Motor of capacity above 200 KW | BI01010001010000000000000515BI0100001148 | ||
41 | 4.01 | 1.Rotation of complete motor on its foundation | BI01010001010000000000000515BI0100001149 | 1 | No |
42 | 4.02 | 2.Opening & tightening of foundation bolt. | BI01010001010000000000000515BI0100001150 | 1 | No |
43 | 4.03 | 3. Removal & insertion of coupling | BI01010001010000000000000515BI0100001151 | 1 | No |
44 | 4.04 | 4. Opening & reassembling of motor driving end cover | BI01010001010000000000000515BI0100001152 | 1 | No |
45 | 4.05 | 5.Opening & reassembling of motor non driving end cover | BI01010001010000000000000515BI0100001153 | 1 | No |
46 | 4.06 | 6.Replacement of DE side bearing | BI01010001010000000000000515BI0100001154 | 1 | No |
47 | 4.07 | 7.Replacement of NDE side bearing | BI01010001010000000000000515BI0100001155 | 1 | No |
48 | 4.08 | 8.Shifting of Stator | BI01010001010000000000000515BI0100001156 | 1 | No |
49 | 4.09 | 9.Shifting of Rotor | BI01010001010000000000000515BI0100001157 | 1 | No |
50 | 4.1 | 10. Repairing of stator holes and finishing the foundation | BI01010001010000000000000515BI0100001158 | 1 | No |
51 | 4.11 | 11. Shifting of complete motor | BI01010001010000000000000515BI0100001159 | 1 | No |
52 | 4.12 | 12. Dismantling of motor | BI01010001010000000000000515BI0100001160 | 1 | No |
53 | 4.13 | 13 . Assembling of motor | BI01010001010000000000000515BI0100001161 | 1 | No |
54 | 5 | JOB2:- .Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 1.Removal of following sizes of old and damage PVC /PILC/XLPE Armoured power cables from trenches/cable galleries and re-rolling of cables and shifting of the same to site Store: | BI01010001010000000000000515BI0100001162 | ||
55 | 5.01 | 1.( i) 630/400 mm2 | BI01010001010000000000000515BI0100001163 | 25 | Mtrs |
56 | 5.02 | 1.( ii) 3x120/3x150/3x240 mm2 | BI01010001010000000000000515BI0100001164 | 25 | Mtrs |
57 | 5.03 | 1.( iii) 3x95/3x70/3x50/3x35 mm2 | BI01010001010000000000000515BI0100001165 | 25 | Mtrs |
58 | 5.04 | 1.(iv) 1x300 mm2 | BI01010001010000000000000515BI0100001166 | 25 | Mtrs |
59 | 6 | JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 2.Removal of following sizes of old/damage Armoured control cable PVC insulation from trenches/cable galleries and rerolling of cables and shifting of the same to site Store: | BI01010001010000000000000515BI0100001167 | ||
60 | 6.01 | 2.( i) Up to 9x2.5 mm2 | BI01010001010000000000000515BI0100001168 | 25 | Mtrs |
61 | 6.02 | 2.( ii) Above 9x2.5 mm2 & upto 24x2.5 mm2 | BI01010001010000000000000515BI0100001169 | 25 | Mtrs |
62 | 7 | JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 3.Rerouting of existing cables/shifting the following sizes of New cables from Central/ site Store to work-site and laying, dressing of PVC/PILC/XLPE Armoured power cables: | BI01010001010000000000000515BI0100001170 | ||
63 | 7.01 | 3.( i) 630/400 mm2 | BI01010001010000000000000515BI0100001171 | 25 | Mtrs |
64 | 7.02 | 3.( ii) 3x120/3x150/3x185/3x240 mm2 | BI01010001010000000000000515BI0100001172 | 25 | Mtrs |
65 | 7.03 | 3.( iii) 3x95/3x70/3x50/3x35 mm2 | BI01010001010000000000000515BI0100001173 | 25 | Mtrs |
66 | 7.04 | 3.(iv) 1x300 mm2 | BI01010001010000000000000515BI0100001174 | 25 | Mtrs |
67 | 8 | JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 4.Rerouting of existing cables/shifting the following sizes of New PVC Armoured control cables from Central/ site Store to work-site and laying, dressing same: | BI01010001010000000000000515BI0100001175 | ||
68 | 8.01 | 4.( i) Up to 9x2.5 mm2 | BI01010001010000000000000515BI0100001176 | 25 | Mtrs |
69 | 8.02 | 4.( ii) Above 9x2.5 mm2 & upto 24x2.5 mm2 | BI01010001010000000000000515BI0100001177 | 25 | Mtrs |
70 | 9 | JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 5.Making End Termination of following size cable: | BI01010001010000000000000515BI0100001178 | ||
71 | 9.01 | 5.( i) 1 Core-630/400mm2 | BI01010001010000000000000515BI0100001179 | 1 | No |
72 | 9.02 | 5.(ii) 3 Core x120/3x150/3x185/3x240 mm2 | BI01010001010000000000000515BI0100001180 | 1 | No |
73 | 9.03 | 5.(iii) 3x35/3x50/3x70/3x95 mm2 | BI01010001010000000000000515BI0100001181 | 1 | No |
74 | 9.04 | 5.(iv) 1x300mm2 | BI01010001010000000000000515BI0100001182 | 1 | No |
75 | 10 | JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 6. Making straight through joint detecting the fault & preparation for joint of following size cable: | BI01010001010000000000000515BI0100001183 | ||
76 | 10.01 | 6.(i) 400/630mm2 | BI01010001010000000000000515BI0100001184 | 1 | No |
77 | 10.02 | 6.(ii) 3x120/3x150/3x185/3x240 mm2 | BI01010001010000000000000515BI0100001185 | 1 | No |
78 | 10.03 | 6.(iii) 3x35/3x50/3x70/3x95 mm2 | BI01010001010000000000000515BI0100001186 | 1 | No |
79 | 10.04 | 6.(iv) 1x300mm2 | BI01010001010000000000000515BI0100001187 | 1 | No |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail