Public Works Department-PWD has published Construction Of 1 No Oh Tank ( 1 Lakh Litre Capacity ) At Chethlat. Submission Date for this Tender is 03-03-2020. Over Head Tank Tenders in LPWD Division Office Amini Lakshadweep. Bidders can get complete Tender details and download the document.
Name of Work: Construction of 1 No. OH tank (1 Lakh litre capacity) at Chethlat | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Surface dressing of the ground including removing vegitation and in equalities not exceeding 15cm deep and disposal of rubbish lead up to 50 metres and lift up to 1.5 metres (Full Cost)\n | Item1 | 43 | Sqm |
2 | 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (Full Cost)\n | Item2 | 65 | Cum |
3 | 3 | Providing and laying cement concrete 1: 4:8 ( 1 cement: 4 M.Sand: 8 granite chips ) foundation and plinth.Stone aggregate 40mm nomonal size\n (Labour Element)\n | Item3 | 7 | Cum |
4 | 4 | Reinforced cement concrete 1:1.5:3 ( 1 cement: 1.5 M.Sand: 3 granite chips 20mm nominal size) excluding cost of centring and shuttering and reinforcement All work up toplinth level a) Foundation fooltings bases of column etc, and mass concrete. (Labour Element)\n | Item4 | 22 | Cum |
5 | 5 | Reinforced cement concrete work in beams, Suspended floors ,roofs,having slope up to 15 degree landings, shelves chajjas, lintels ,bands,plain window sills,staircase and spiral stair case up to floor five level excluding cost of centering and shuttering finishing and reinforcement.with 1:1.5:3 ( 1 cemet :1.5 coarse sand:3 graded stone aggregate 20 mm nominal size ). (Labour Element)\n\n\n | Item5 | 18 | Cum |
6 | 6 | Reinforced cement concrete work in (wall any thickness ) including attached pilasters,buttresses,plinth and string course, fillets, columns, pillars, piers, abutments, post and struts etc.. up to floor five level excluding cost of centering and shuttering finishing and reinforcement. 1:1.5:3 ( 1 cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. (Labour Element)\n\n\n | Item6 | 17 | Cum |
7 | 7 | Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. (Full Cost)\n\n\n | Item7 | 35 | Sqm |
8 | 9 | Centring and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string. (Full Cost)\n\n\n | Item8 | 136 | Sqm |
9 | 10 | Centring and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. (Full Cost)\n\n\n | Item9 | 90 | Sqm |
10 | 11 | Centring and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform (Full Cost)\n\n\n | Item10 | 194 | Sqm |
11 | 12 | Cold twisted steel reinforcement for R.C.C. work including bending, binding and placing in position complete (Labour Element)\n\n\n | Item11 | 4293 | Kg |
12 | 13 | 6mm cement plaster to ceiling 1:3(1cement :3 metal sand) (Labour Element)\n\n\n | Item12 | 78 | Sqm |
13 | 14 | 12mm cement plaster to ceiling 1:4 (1cement :4 metal sand) (Labour Element)\n\n\n | Item13 | 280 | Sqm |
14 | 15 | 12mm cement plaster 1:3 (1cement :3 metal sand) finished with a floating coat of neat cement in side fo water tank (Labour Element)\n\n\n | Item14 | 128 | Sqm |
15 | 16 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface.Water thinnable cement primer\n (Full Cost)\n\n\n | Item15 | 358 | Sqm |
16 | 17 | Finishing wall with texture exterior paint of required shade on new work (two or more coats applied @3.28ltr/10 sqm) over including priming coat of exterior primer applied @ 2.20 kg/10 sqm(Full Cost)\n \n\n | Item16 | 358 | Sqm |
17 | 18 | Providing and fixing HDPE Pipe of approved quality complete with special flang compression type fittings including trenching and re filling etc. 110 mm (Full Cost)\n \n\n | Item17 | 50 | Mtr |
18 | 19 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balconyrailing and staircase railing including applying a priming coat of approved steel primer G.I Pipe (Full Cost)\n\n\n\n | Item18 | 256 | Kg |
19 | 20 | Steel work welded in built up section / framed work including cutting,hoisting,fixinginpositionand applyinga primingcoat of approved steelprimer usin’g structural steel etc. as required. In grating, frames, guard bar, ladder, railings, brackets,gates and similar works (Full Cost)\n | Item19 | 142 | Kg |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy