}

Annual Maintenance Of Chip Conveyor In Axle Machine Shop.-Karnataka

Rail Wheel Factory-RWF has published Annual Maintenance Of Chip Conveyor In Axle Machine Shop.. Submission Date for this Tender is 20-03-2020. Conveyors and Accessories Tenders in Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

23717360
Annual Maintenance Of Chip Conveyor In Axle Machine Shop.
Open Tender
Indian
Karnataka
20-03-2020

Tender Details

Annual Maintenance Of Chip Conveyor In Axle Machine Shop.

Key Value

Document Fees
INR 3150 /-
EMD
INR 68800.0 /-
Tender Value
INR 34.41 Lakhs /-

BOQ Items

0 1 2 3 4 5 6 7 8
0 S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
1 Schedule C- Annual Maintenance of Chip Conveyor in Axle Machine Shop. Schedule C\rHalf Yearly PMS. 714964.00 Above/\rBelow/Par
2 1 Lump Sum 714964.00 AT Par 714964.00
3 Item Description:- 1. CNC - Stn 2 No. 1 (Underneath the machine.) Chip Conveyor in 'B' Machine Shop. 2. CNC\r- Stn 2 No. 2 Chip Conveyors in 'B' Machine Chip Conveyor. 3. CNC Lathe No.1 long chip Conveyor in 'B'\rMachine Shop. 4. CNC Lathe No.2 Chip Conveyor from 'B' to 'A' Machine Shop. 5. CNC No.1 Cross Conveyor\rL/Hside.6.CNCNo.1CrossConveyorR/Hside. Qty.04,UnitHalfYearly,RateRs.1,78,741/-Value\rRs.7,14,964/-. Work Schedule for each chip conveyors on half yearly basis (Schedule - C) a. Remove the\rConveyor steel belt from the Trough. b. Clean thoroughly the Steel belt. c. Dismantle and Recondition the steel\rbelt assembly duly replace the damaged/worn-out Plates, Hinges, split pins, connecting pins, side links and wing\rplates. If the chain is beyond repairable condition the same has to be replaced by new one. d. Remove the Drive\rshaft Assembly including Gearbox. e. Clean thoroughly the Drive shaft assembly, gearbox, Electric motor, Chain\rand mounting brackets. f. Dismantle and Recondition the Drive Shaft assembly including Gearbox duly replace\rthedamaged/worn-outpartslikeSprocket,Chain,DriveshaftKey,Pillowblockbearingsandfoundation\rfasteners. g. Remove the Tail end shaft assembly. h. Clean thoroughly the Tail end shaft assembly, Sprocket,\rPillow blocks, mounting brackets and fasteners. i. Dismantle and Recondition the Tail end shaft assembly duly\rreplace the damaged/worn-out Sprocket, Shaft Key, Pillow block bearings and foundation fasteners. j. Clean\rthoroughly the complete Trough Assembly. k. Recondition the Trough assembly duly replace the Guide ways,\rwear plates and deteriorated areas. l. Re-fit the reconditioned Tail End shaft Assembly and Drive shaft assembly\rwithGearboxandElectricmotor.m.AssembletheReconditioned/NewSteelbeltAssembly.n.Checkthe\ralignment of the belt at tail end and drive end. o. Check the Free movement of the Chain.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail