Construction Of 70 M Span Steel Truss Motor Bridge On Bageshwar-Dafaut Motor Road At Km 36 In District Bageshwar Construction Of Bridge, Bageshwar-Uttarakhand

Public Works Department-PWD has published Construction Of 70 M Span Steel Truss Motor Bridge On Bageshwar-Dafaut Motor Road At Km 36 In District Bageshwar Construction Of Bridge. Submission Date for this Tender is 17-03-2020. Bridge Work Tenders in Bageshwar Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

23646799
Construction Of 70 M Span Steel Truss Motor Bridge On Bageshwar-Dafaut Motor Road At Km 36 In District Bageshwar Construction Of Bridge
Open Tender
Indian
Uttarakhand
Bageshwar
17-03-2020

Tender Details

Construction Of 70 M Span Steel Truss Motor Bridge On Bageshwar-Dafaut Motor Road At Km 36 In District Bageshwar Construction Of Bridge

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Construction of 70 m span Steel Truss Motor Bridge on Bageshwar Dafaut Motor Road at Km-36 in District Bageshwar.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Dismantling of Structures\nDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as directed by engineer in-charge By Manual Means. BI01010001010000000000000515BI0100001112
2 1.01 Lime Concrete, cement concrete grade M-10 and below BI01010001010000000000000515BI0100001113 10 Cum
3 1.02 Cement Concrete Grade M-15 & M-20 BI01010001010000000000000515BI0100001114 5 Cum
4 1.03 Prestressed / Reinforced cement concrete grade M-20 & above BI01010001010000000000000515BI0100001115 5 Cum
5 1.04 Excavation for Structures\nEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as directed by engineer in-charge.by Mechanical Means / Manual Means. BI01010001010000000000000515BI0100001116
6 1.05 Ordinary soil Depth upto 3 m BI01010001010000000000000515BI0100001117 966.7 Cum
7 1.06 Ordinary rock (not requiring blasting) BI01010001010000000000000515BI0100001118 580 Cum
8 1.07 Hard rock ( blasting prohibited) BI01010001010000000000000515BI0100001119 386.7 Cum
9 1.08 Plain cement concrete (PCC) Grade M15 in open foundation complete as per drawing and technical specifications also including supply of all materials labours,T&P etc required for completion of work as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. \n BI01010001010000000000000515BI0100001120 20.5 Cum
10 1.09 Reinforced cement concrete (RCC) Grade M35 in open foundation complete as per drawing and technical specifications also including supply of all materials labours,T&P etc required for completion of work as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001121 94.5 Cum
11 1.1 Reinforced cement concrete (RCC) M 35 in sub-structure complete as per drawing and technical specifications Height upto 5m, also including supply of all materials labours,T&P etc required for completion of work as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001122 152.3 Cum
12 1.11 Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification PSC Grade M-40, also including supply of all materials labours,T&P etc required for completion of work as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001123 2.4 Cum
13 1.12 Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure for dack slab as per drawing and Technical Specification For solid slab super-structure Height upto 5m also including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. (RCC Grade M35 for deck slab) BI01010001010000000000000515BI0100001124 92.3 Cum
14 1.13 Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer in-charge. (As per PWD Uttarakhand specifications) BI01010001010000000000000515BI0100001125 361.9 Cum
15 1.14 Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications also including supply of all materials labours,T&P etc required for completion of work and as per direction of engineer in-charge. BI01010001010000000000000515BI0100001126 13.2 MT
16 1.15 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications also including supply of all materials labours,T&P etc required for completion of work and as per direction of engineer in-charge. BI01010001010000000000000515BI0100001127 23.2 MT
17 1.16 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications also including supply of all materials labours,T&P etc required for completion of work and as per direction of engineer in-charge. BI01010001010000000000000515BI0100001128 14.8 MT
18 1.17 Supply and fabrication of steel truss bridge as per detailed drawing attached including supply of all structural steel confirming IS 226 – 1969 (FE-350 Grade steel) required for proper completion of the bridge including ground erection of the bridge and one coat of approved quality anticorrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing, required equipment shall be arranged by the contractor at his own cost which shall be taken back by the contractor after satisfactory execution of the job, the rates shall include ground errection in the workshop and its dismantling after inspection, approval and removing defects, match marking of all parts, numbering and proper stacking in the premises of workshop before cartage to site of work. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting, labour, T&P, etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts. (As per MORD SOR sep 2017 Misc. Item 4-1) BI01010001010000000000000515BI0100001129 302.1 MT
19 1.18 Strip Seal Expansion Joint\nProviding and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation also including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge. (As per MORTH SOR) BI01010001010000000000000515BI0100001130 10.5 Rm.
20 1.19 Reinforced Cement Concrete Crash Barrier\nProvision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per Dimensions in the approved drawing and at locations all as specified, also including supply of all materials labours,T&P etc required for completion of work and as directed by the Engineer in Charge. BI01010001010000000000000515BI0100001131 140 Rm.
21 1.2 Drainage Spouts complete as per drawing and Technical specificationand also including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge. BI01010001010000000000000515BI0100001132 30 Nr.
22 1.21 Wearing coat\nProviding and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications including supply of all material, labour, T&P etc required for proper completion of work as directed by engineer in-charge and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001133 25 Cum
23 1.22 Reinforced cement concrete (M-30) approach slab excluding reinforcement and formwork complete as per drawing and Technical specification also including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge. (As per MORTH SOR) and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001134 17.4 Cum
24 1.23 Painting on Steel Surfaces\nProviding and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge. BI01010001010000000000000515BI0100001135 1208 Sqm
25 1.24 Erection of Steel Truss (Girder) Bridge as per drawing with required camber including cartage of fabricated parts from the place of stack near site including submission of launching plan by the contractor, (duly vetted by a recognised reputable institution/ consultant if required) and approved by the engineer-in-charge. Service bolts to used shall be of approved make. The rate including of cost of all labour, T&P, equipment’s, civil work and consumables, cost of arranging, fabricating, erecting and dismantling of erection scheme including the cost of its designing, revising, supervision by contractor's designeer at site during erection, also including cost of all safety measures and necessary insurances of bridge and labours for proper completion of the work as per MORTH specification no. 1905 with due regard of monsoon and as per directions of the engineer-incharge. (As per MORD SOR sep 2017 Misc. Item 4-2) BI01010001010000000000000515BI0100001136 302.1 Tonne
26 1.25 Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications also including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge. BI01010001010000000000000515BI0100001137 204 RM
27 1.26 Bore Hole for Soil Investigation - Carrying out confirmatory bores up to required depths complete in all respects as per MORTH Technical Specifications 2400 also including supply of all materials labours,T&P etc required for completion of work and as directed by Engineer-in- Charge. BI01010001010000000000000515BI0100001138
28 1.27 Depth between 0 m to 10 m BI01010001010000000000000515BI0100001139 20 Rm.
29 1.28 Depth between 10 m to 20 m BI01010001010000000000000515BI0100001140 20 Rm.
30 1.29 Supplying, fitting and fixing in position true to line and level POT- PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I, II or III as desired and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications also including supply of all materials labours,T&P etc required for completion of work and as directed by engineer in-charge. BI01010001010000000000000515BI0100001141
31 1.3 Free POT cum PTFE (Capacity- 250 MT) BI01010001010000000000000515BI0100001142 4 Nr.
32 1.31 Guided Pot cum PTFE (Capacity- 100 MT) BI01010001010000000000000515BI0100001143 1 Nr.
33 1.32 Pin Bearing (Capacity- 200 MT) BI01010001010000000000000515BI0100001144 1 Nr.
34 1.33 Direction and Place Identification signs upto 0.9 sqm size board.\n(Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing) also including supply of all materials labours,T&P etc required for completion of work as per direction of engineer in-charge. BI01010001010000000000000515BI0100001145 2 Nr.
35 1.34 Supply and fixing of 20mm dia P.F. make 10.90 grade HSFG High Strength Friction Grip bolt to IS 3757:1985 latest to grade 10.9S with high strength friction grip nut to IS 6623:2004 latest to grade 10S and high strength friction 2 No. washer including cost of all material, labour, fixing at site, all taxes, T&P etc required foe proper ompletion of the work.(20x100mm) as per direction of engineer in-charge. BI01010001010000000000000515BI0100001146 25700 Nr.
36 1.35 Approach Road BI01010001010000000000000515BI0100001147
37 1.36 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 as directed by engineer in-charge. By Mechanical Means. \nIn all area including thorny jungle BI01010001010000000000000515BI0100001148 0.18 Hectare
38 1.37 Excavation in soil in Hilly Area by mechanical means\nExcavation in soil in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m at safe place as per direction of engineer in-charge and as per Technical Specification Clause 1603.1\n BI01010001010000000000000515BI0100001149 1690.5 Cum
39 1.38 Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blasting (With out Dozer)\nExcavation in hilly area in ordinary rock not requiring blasting by mechanical means without using Dozer including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m at safe place as per direction of engineer in-charge and as per Clause 1603.2. BI01010001010000000000000515BI0100001150 2254 Cum
40 1.39 Excavation in Hilly Areas in Hard Rock requiring blasting\nExcavation in hilly areas in hard rock requiring blasting, by mechanical means without using Dozer , lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m at safe place as per direction of engineer in-charge and as per Clause 1603.2. BI01010001010000000000000515BI0100001151 1690.5 Cum
41 1.4 Construction of Embankment with Material Obtained from Borrow Pits\nConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 and as directed by engineer in-charge.. BI01010001010000000000000515BI0100001152 204 Cum
42 1.41 WBM Grading 2\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 and as directed by engineer in-charge By Mechanical Means. BI01010001010000000000000515BI0100001153 116.8 Cum
43 1.42 WBM Grading 3\nProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniformt hickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 and as directed by engineer in-charge By Mechanical Means. BI01010001010000000000000515BI0100001154 56.9 Cum
44 1.43 Prime coat (Medium porosity)\nProviding and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502 and as per direction of engineer in-charge. BI01010001010000000000000515BI0100001155 495 Sqm
45 1.44 Tack Coat\nProviding and applying tack coat with bitumen (VG-10) using bitumen distributor at the rate of 0.40 kg per sqm on the prepared granular surfaces treated with primer cleaned with hydraulic broom including all materials, labour, HOM of machinery, etc required for proper completion of work as per Technical Specification Clause 503 BI01010001010000000000000515BI0100001156 495 Sqm
46 1.45 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder\nProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification Clause 508 and as per direction of engineer in-charge. BI01010001010000000000000515BI0100001157 495 Sqm
47 1.46 Seal Coat\nProviding and laying seal coat sealing the voids in a bituminous surface laid to thespecified levels, grade and cross fall using Type B as per Technical Specification Clause 510 using Bitumen (VG-10) and as per direction of engineer in-charge. BI01010001010000000000000515BI0100001158 495 Sqm
48 1.47 Interlocking Concrete Block Pavement\nProviding and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. as per direction of engineer in-charge. BI01010001010000000000000515BI0100001159 240 Sqm
49 1.48 Type - A, "W" : Metal Beam Crash Barrier\nProviding and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ( if Concrete Required for Vertical post Fixing will be paid extra) and as directed by engineer in-charge. BI01010001010000000000000515BI0100001160 120 Rmt
50 1.49 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction. BI01010001010000000000000515BI0100001161 195 Cum
51 1.5 Providing plain cement concrete M-10 (Nominal mix 1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001162 45 Cum
52 1.51 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the ull width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 and as directed by engineer in charge. BI01010001010000000000000515BI0100001163 450 Rmt
53 1.52 R.R. stone masonry laid in 1:5 cement and sand mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 and must be continuous curing for at least 14 days must be done by laying Hessain cloth as directed by engineer in charge.\n BI01010001010000000000000515BI0100001164 482.4 Cum
54 1.53 Pointing with cement mortar (1:3) on brick/stone work as per drawing and technical specification Clauses 613.3 and 1204 and must be continuous curing for at least 14 days must be done by laying Hessain cloth as directed by engineer in charge. BI01010001010000000000000515BI0100001165 504 Sqm
55 1.54 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11and must be continuous curing for at least 14 days must be done by laying Hessain cloth. BI01010001010000000000000515BI0100001166 240 Rmt
56 1.55 Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) BI01010001010000000000000515BI0100001167 108 Cum
57 1.56 Providing and Fixing 'Logo' of UDRP-AF Project\nProviding and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 and as directed by engineer in charge. BI01010001010000000000000515BI0100001168 2 Nr.
58 1.57 Protection Work BI01010001010000000000000515BI0100001169
59 1.58 Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. and as directed by the engineer in charge. (The work includes filling boulders in the gabions) BI01010001010000000000000515BI0100001170 240 Nr.
60 1.59 Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) BI01010001010000000000000515BI0100001171 288 Cum
61 1.6 Environmental Monitoring Cost BI01010001010000000000000515BI0100001172
62 1.61 Pre-Construction BI01010001010000000000000515BI0100001173
63 1.62 Ambient Air Quality Monitoring BI01010001010000000000000515BI0100001174 2 Nr.
64 1.63 Surface Water Quality BI01010001010000000000000515BI0100001175 4 Nr.
65 1.64 During construction BI01010001010000000000000515BI0100001176
66 1.65 Ambient Air Quality Monitoring BI01010001010000000000000515BI0100001177 4 Nr.
67 1.66 Surface Water Quality BI01010001010000000000000515BI0100001178 6 Nr.
68 1.67 Noise Quality BI01010001010000000000000515BI0100001179 2 Nr.
69 1.68 Soil Quality BI01010001010000000000000515BI0100001180 4 Nr.
70 1.69 Environmental Management Plan Implementation Training site BI01010001010000000000000515BI0100001181 4 Nr.
71 1.7 Water sprinkling by water tanker to minimize the dust pollution during construction activities. It has been considered for at least 2 hours/day for 120 days BI01010001010000000000000515BI0100001182 350 Hours
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail