Renovation Of Ponds And Ooranies Under Sfc Grants For The Year 2019 – 2020 In Pudukkottai District., Pudukkottai-Tamil Nadu

Rural Development And Panchayats Department has published Renovation Of Ponds And Ooranies Under Sfc Grants For The Year 2019 – 2020 In Pudukkottai District.. Submission Date for this Tender is 05-06-2020. Lake Development Tenders in Pudukkottai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

23549093
Corrigendum : Renovation Of Ponds And Ooranies Under Sfc Grants For The Year 2019 – 2020 In Pudukkottai District.
National Competitive Bid
Indian
Tamil Nadu
Pudukkottai
05-06-2020

Tender Details

Renovation of Ponds and Ooranies under SFC Grants for the year 2019 – 2020 in Pudukkottai District.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Feb-2020 Tenders to be date extended on 06.03.2020 Date 06-03-2020
2 06-Mar-2020 Tenders to be date extended on 24.03.2020 Date 24-03-2020
3 24-Mar-2020 Tenders to be date extended on 03.04.2020 Date 03-04-2020
4 03-Apr-2020 Tenders to be date extended on 30.04.2020 Date 30-04-2020
5 30-Apr-2020 Tenders to be date extended on 29.05.2020 Date 29-05-2020
6 29-May-2020 Tenders to be date extended on 05.06.2020 Date 05-06-2020

Key Value

Document Fees
Refer document
EMD
INR 76000.0 /-
Tender Value
INR 76 Lakhs /-

BOQ Items

Name of Work : SFC - 2019-2020 - PONDS AND OORANI
Sl. No. Item Description Item Code / Make Quantity Units
1 1 1. Improvements to Vayalangudi Samban Koil Oorani in Embal panchayat BI01010001010000000000000515BI0100001112
2 1.01 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001113 324 sqm
3 1.02 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001114 1287.15 cum
4 1.03 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001115 1287.15 cum
5 1.04 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001116 46.86 cum
6 1.05 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001117 3.75 cum
7 1.06 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001118 25.2 cum
8 1.07 Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification BI01010001010000000000000515BI0100001119 5 RM
9 1.08 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001120 241.62 sqm
10 1.09 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001121 46.46 sqm
11 1.1 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001122 53.92 cum
12 1.11 2. Improvements to Itchikkotai Mummulichan Oorani in Madhagam Panchayat BI01010001010000000000000515BI0100001123
13 1.12 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001124 348 sqm
14 1.13 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001125 2556.19 cum
15 1.14 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001126 2556.19 cum
16 1.15 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001127 52.18 cum
17 1.16 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001128 3.75 cum
18 1.17 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001129 29.45 cum
19 1.18 Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification BI01010001010000000000000515BI0100001130 5 RM
20 1.19 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001131 297.62 sqm
21 1.2 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001132 46.46 sqm
22 1.21 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001133 70.42 cum
23 1.22 3. Improvements to Lembalakkudi Lanthani Oorani in Lembalakkudi Panchayat BI01010001010000000000000515BI0100001134
24 1.23 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001135 585 sqm
25 1.24 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001136 2109.26 cum
26 1.25 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001137 2109.26 cum
27 1.26 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001138 48.99 Cum
28 1.27 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001139 3.75 Cum
29 1.28 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001140 26.9 Cum
30 1.29 Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification BI01010001010000000000000515BI0100001141 5 RM
31 1.3 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001142 264.02 sqm
32 1.31 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001143 46.46 sqm
33 1.32 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001144 60.52 Sqm
34 1.33 4. Improvements to Devapatti Pillaiyarkoil Oorani in Kottaiyur Panchayat BI01010001010000000000000515BI0100001145
35 1.34 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001146 112.5 sqm
36 1.35 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001147 2108.48 cum
37 1.36 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001148 2108.48 cum
38 1.37 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001149 53.24 Cum
39 1.38 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001150 3.75 Cum
40 1.39 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001151 30.3 Cum
41 1.4 Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification BI01010001010000000000000515BI0100001152 5 RM
42 1.41 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001153 308.82 sqm
43 1.42 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001154 46.46 sqm
44 1.43 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001155 73.72 Sqm
45 1.44 5. Improvements to Pillaiyarkoil Oorani in Velvarai Panchayat BI01010001010000000000000515BI0100001156
46 1.45 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001157 312 sqm
47 1.46 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001158 628.44 cum
48 1.47 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001159 628.44 cum
49 1.48 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001160 31.68 Cum
50 1.49 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001161 2.26 Cum
51 1.5 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001162 18.07 Cum
52 1.51 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001163 172.94 sqm
53 1.52 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001164 39.31 sqm
54 1.53 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001165 34.78 Sqm
55 1.54 6. Improvements to Ponniyamman Koil Oorani @ Poovalur Panchayat BI01010001010000000000000515BI0100001166
56 1.55 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001167 1443 sqm
57 1.56 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001168 1228 cum
58 1.57 Sectioning during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001169 1228 cum
59 1.58 Construction of INLET BI01010001010000000000000515BI0100001170
60 1.59 Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation BI01010001010000000000000515BI0100001171 13.04 cum
61 1.6 Filling With Good River Sand including cost and Conveyance of All charges and etc completed BI01010001010000000000000515BI0100001172 2.19 cum
62 1.61 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001173 2.19 cum
63 1.62 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001174 11.95 cum
64 1.63 Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete BI01010001010000000000000515BI0100001175
65 1.64 Below Sill BI01010001010000000000000515BI0100001176 14.94 sqm
66 1.65 Above Sill BI01010001010000000000000515BI0100001177 19.37 sqm
67 1.66 Towards the supplying and fixing of 600 mm dia (inner) NP3 RCC Pipes as per standard specificatgions including cost and conveyance pipes etc., complete RCC 600 mm dia pipes 2.50m BI01010001010000000000000515BI0100001178 5 RM
68 1.67 Supplying and filling with good river sand including cost and conveyance of sand from approved sources to worksite and stacking the same to departmental metric gauge for taking premeasurement laying layers of not more than 150mm thick watering and tamping with all leads for soft water and including labour charges and all other incidental charges etc., complete as per standard specification for CD works BI01010001010000000000000515BI0100001179 6.75 sqm
69 1.68 Bhathing Ghat BI01010001010000000000000515BI0100001180
70 1.69 Earth work excavation in all classes of soil such as hard stiff clay, hard gravelly soil as per ss 20 B etc., complete BI01010001010000000000000515BI0100001181 15.5 cum
71 1.7 Filling With Good River Sand including cost and Conveyance of All charges and etc completed BI01010001010000000000000515BI0100001182 5.17 cum
72 1.71 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001183 7.75 cum
73 1.72 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001184 32.14 cum
74 1.73 Centering for sides and soffits including cost and conveyance and all labourcharges etc BI01010001010000000000000515BI0100001185 34.08 sqm
75 1.74 Retaining Wall BI01010001010000000000000515BI0100001186
76 1.75 Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth, shales, murram, and earth muds with 505 fair sized boulders as per SS 20B for narrow foundation BI01010001010000000000000515BI0100001187 18 cum
77 1.76 Filling With Good River Sand including cost and Conveyance of All charges and etc completed BI01010001010000000000000515BI0100001188 3 cum
78 1.77 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001189 4.5 cum
79 1.78 Supplying and Erecting centering for sides & soffiots including necessary supports and Strutting plant surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 ghauge stiffened, welded with steel angle of size 25 x25 x 3 BI01010001010000000000000515BI0100001190
80 1.79 Below Gl BI01010001010000000000000515BI0100001191 24.21 cum
81 1.8 Above Gl BI01010001010000000000000515BI0100001192 47.88 cum
82 1.81 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001193 26.01 sqm
83 1.82 7. Improvements to Ponnamangalam Vanakanthan Oorani in Ponnamangalam Panchayat BI01010001010000000000000515BI0100001194
84 1.83 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001195 189 sqm
85 1.84 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001196 1032.98 cum
86 1.85 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001197 1032.98 cum
87 1.86 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001198 34.15 Cum
88 1.87 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001199 2.34 Cum
89 1.88 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001200 17.21 Cum
90 1.89 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001201 200.28 sqm
91 1.9 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001202 40.89 sqm
92 1.91 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001203 41.38 Sqm
93 1.92 8. Improvements to Pallathividuthi mathavadikulam in Pallathividuthi Panchayat BI01010001010000000000000515BI0100001204
94 1.93 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001205 144 sqm
95 1.94 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001206 3153.48 cum
96 1.95 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001207 3153.48 cum
97 1.96 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001208 34.08 Cum
98 1.97 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001209 26.2 Cum
99 1.98 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001210 313 sqm
100 1.99 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001211 23.74 sqm
101 2 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001212 80.98 Sqm
102 2.01 9. Improvements to Seriyalur Inam Ayyanarkulam in Seriyalur Inam Panchayat BI01010001010000000000000515BI0100001213
103 2.02 Clearing light jungles and clearing away carefully and burning it including all labour charges etc BI01010001010000000000000515BI0100001214 189 sqm
104 2.03 Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. BI01010001010000000000000515BI0100001215 2473.39 cum
105 2.04 Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation BI01010001010000000000000515BI0100001216 2473.39 cum
106 2.05 Earth work excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depoisiting the surplus earth in places as shown by the departmental officers with the standard specification. BI01010001010000000000000515BI0100001217 43.66 Cum
107 2.06 Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications. BI01010001010000000000000515BI0100001218 1.58 Cum
108 2.07 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete BI01010001010000000000000515BI0100001219 25.63 sqm
109 2.08 Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with stantard specification BI01010001010000000000000515BI0100001220 10 RM
110 2.09 Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS sheet BG 10 gauge thick of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damageing the concrete laid complying with standard specification and as directed by the Engineer BI01010001010000000000000515BI0100001221 279.99 sqm
111 2.1 Cement Concrete 1 : 2 : 4 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001222 23.74 sqm
112 2.11 Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for mixing, laying and curing etc complete BI01010001010000000000000515BI0100001223 78.33 Sqm
113 2.12 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}\n BI01010001010000000000000515BI0100001224 1 GST Amount (in Rupees)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail