Rejuvenation And Conservation Of Nambul River In Imphal Of Manipur . , As Per Tender Document.-Manipur

Forest And Environment Department has published Rejuvenation And Conservation Of Nambul River In Imphal Of Manipur . . Submission Date for this Tender is 20-02-2020. Civil Work Tenders in As Per Tender Document. Manipur. Bidders can get complete Tender details and download the document.




Tender Notice

23548808
Corrigendum : Rejuvenation And Conservation Of Nambul River In Imphal Of Manipur .
Open Tender
Indian
Manipur
As Per Tender Document.
20-02-2020

Tender Details

Rejuvenation And Conservation Of Nambul River In Imphal Of Manipur .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 10-Feb-2020 Corrigendum for Rejuvenation and Conservation of Nambul River in Imphal of Manipur. Date 20-02-2020

Key Value

Document Fees
INR 10000 /-
EMD
INR 8900000.0 /-
Tender Value
INR 78.67 Crore /-

BOQ Items

Name of Work: Rejuvenation and Conservation of Nambul River in Imphal of Manipur 1) Interception and Diversion by tapping / collection of outfalls from open drain at both side of Nambul River bank from Iroisemba to Heirangoithong (9.14 Km), Imphal West 2) Construction of 2 (two) Sewage Treatment Plant (STP) of 16 MLD and 1 MLD capacity
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Investigation of subsurface, surface & subgrade, Architectural, Structural and process design of STP and Drawing, Construction, Testing and Commissioning of 200 mm dia to 700 mm dia Interceptor, Tapping of open drain carrying the domestic waste, silt catching basin with bar screen, manhole and lift stations, fittings including all appurtenant, Sewage treatment plant of 16 MLD and 1 MLD including all civil and Electrical & Mechanical works to divert the tapped domestic flow (Avg. flow with a peak factor of 2) from open drains on either side of river Nambul approximately 9 km stretch) from Iroisemba to Heirangoithong at Imphal, Manipur, including substation, internal and external lighting arrangements and other appurtenant works which includes 3 months trial run and 12 months operation and maintenance for performance guarantee comprised of Bill of Quantity given under Clause 1.2.3 Item 1 1 Job
2 2 Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m item2
3 3 Loose / soft soil Item 3 486.2 Cum
4 4 Filling available excavated earth (e/c rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 1.5 m Item 4 78.2 Cum
5 5 Providing and laying cement concrete in foundation Item 5
6 6 1:4:8 ( 1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) Item 6 82.6 Cum
7 7 Reinforced Cement Concrete work in foundation footings, bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement. Item 7
8 8 1:1.5:3 ( 1 Cement : 1.5 C.sand : 3 graded stone aggregate 20mm nominal size Item 8 175.879 Cum
9 9 Reinforcement for R.C.C. work including bending, binding and placing in position complete. Item 9
10 10 Thermo mechanical treated bars Item 10 28830 Kg
11 11 Providing cost in plane vertical RCC piles i/c reinforcement complete as per drawing and technical specification @ 500 mm dia piles ( M20 grade ) Item 11 615.375 Rm
12 12 Providing form works including centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in Foundation footings, bases of columns, flat surface vertical wall, etc. Item 12 1919.88 Sqm
13 13 2nd class (local first class) brick work in foundation and plinth in c.m 1 : 4 ( 1 Cement : 4 fine sand). Item 13 176.307 Cum
14 14 40 mm cement concrete flooring 1:2:4 ( 1 Cement : 2 C/sand : 4 stone aggt 20mm and down ) finished with a floating coat of neat cement. Item 14 152.729 Sqm
15 15 6 mm cement plaster to ceiling 1 : 3 ( 1 cement : 3 fine sand ) Item 15 1969.88 Sqm
16 16 12 mm cement plaster 1:4 ( 1 cem : 4 f/sand) Item 16 287.545 Sqm
17 17 15 mm cement plaster 1:4 ( 1 cem : 4 f/sand) Item 17 277.456 Sqm
18 18 Neat cement punning Item 18 835.64 Sqm
19 19 Providing wood work in frames of doors, windows, clerestory windows and other frames wrought, framed and fixed in position Item 19
20 20 Local best quality Uningthou Item 20 1.56 Cum
21 21 Providing and fixing 38mm thick panelled, glazed or pannelled and glazed shutter for doors, windows and clerestory windows including bright finished brass hinges (heavy type) with necessary screws. Item 21
22 22 Local best quality Uningthou Item 22 53.6 Sqm
23 23 Providing and fixing M.S. Tower Bolts (barrel type) with screws etc. complete. Item 23
24 24 250 x 10 mm Item 24 20 Each
25 25 150 x 10 mm Item 25 40 Each
26 26 Providing and fixing M.S. Handles with screws etc. complete Item 26
27 27 125 mm Item 27 60 Nos
28 28 Providing anf fixing M.S. Sliding bolts bright finished or / and black enamelled with nuts and screws etc. complete. Item 28
29 29 300 x 16 mm Item 29 12 Each
30 30 Applying ready mixed priming coat pink primer of approved quality on wood work. Item 30 121.6 Sqm
31 31 Painting two coats ( excluding priming coat ) with chocolate, red, grey or buff paint of approved quality on new steel or wood work. Item 31 121.6 Sqm
32 32 Colour washing such as green, blue or bufdf on new work (two or more coat) including base coat of white washing with lime to give a even shade. Item 32 1796.68 Sqm
33 33 Construction of Grid Chamber - 4 Nos Item 33
34 34 Earth work in excavation in foundation trenches or drains i/c dressing of sides & ramming of bottoms lift upto 1.5 m i/c getting out the excavated soil & disposal of surplus excavated soil as directed within a lead of 50 m. Item 34
35 35 (a) Loose/Soft Soil. Item 35 569.6 cum
36 36 Providing and Laying Cement Concrete work in foundation Item 36
37 37 1:4:8 (1 cement : 4 Coarse Sand : 8 Graded Stone aggregate 40 mm nominal size) Item 37 55.08 cum
38 38 Reinforcement cement concrete work infoundation footings,Bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement. Item 38
39 39 1:1.5:3 (1 cement : 1.5 Coarse Sand : 3 Graded Stone aggregate 20 mm nominal size) Item 39 65.669 cum
40 40 Reinforcement for R.C.C work including bending, binding and placing in position complete Item 40
41 41 Thermo mechanically treated bars Item 41 2500 Kg
42 42 2nd class (local first class) brick work in foundation and plingth in CM 1:4 (1cem :4 Fine sand) Item 42 158.317 cum
43 43 12mm thick cement plaster CM 1:4 (1cem :4 Fine sand) Item 43 542.67 Sq.m
44 44 Neat cement punning Item 44 612 Sq.m
45 45 40mm cement concrete flooring 1:2:4 (1 cem :2 coarse sand : 4 stone aggregate 20mm and down ) finished with a floating coat of neat cement. Item 45 287.908 Sq.m
46 46 Construction of Screening Chamber - 4 Nos Item 46
47 47 Earth work in excavation in foundation trenches or drains i/c dressing of sides & ramming of bottoms lift upto 1.5 m i/c getting out the excavated soil & disposal of surplus excavated soil as directed within a lead of 50 m. Item 47
48 48 (a) Loose/Soft Soil. Item 48 76.4 cum
49 49 Providing and Laying Cement Concrete work in foundation Item 49
50 50 1:4:8 (1 cement : 4 Coarse Sand : 8 Graded Stone aggregate 40 mm nominal size) Item 50 7.4 cum
51 51 Reinforcement cement concrete work infoundation footings,Bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement. Item 51
52 52 1:1.5:3 (1 cement : 1.5 Coarse Sand : 3 Graded Stone aggregate 20 mm nominal size) Item 52 8.83 cum
53 53 Reinforcement for R.C.C work including bending, binding and placing in position complete Item 53
54 54 Thermo mechanically treated bars Item 54 300 Kg
55 55 Steel work in single sections including cutting hoisting, fixing in position and applying a prime coat of red lead paint Item 55
56 56 In R.S. joist Item 56 7.88 Qtl
57 57 2nd class (local first class) brick work in foundation and plingth in CM 1:4 (1cem :4 Fine sand) Item 57 25.334 cum
58 58 12mm thick cement plaster CM 1:4 (1cem :4 Fine sand) Item 58 76.612 Sq.m
59 59 Neat cement punning Item 59 86.4 Sq.m
60 60 40mm cement concrete flooring 1:2:4 (1 cem :2 coarse sand : 4 stone aggregate 20mm and down ) finished with a floating coat of neat cement. Item 60 23.665 Sq.m
61 61 Painting (two or more coats) with anti corrosive bitumen paints of approved quality on new work to give an even shade Item 61 46.08 Sq.m
62 62 Construction of Manholes - 485 Nos Item 62
63 63 Earth work in excavation in foundation trenches or drains i/c dressing of sides & ramming of bottoms lift upto 1.5 m i/c getting out the excavated soil & disposal of surplus excavated soil as directed within a lead of 50 m. Item 63
64 64 (a) Loose/Soft Soil. Item 64 4568.7 cum
65 65 Filling available excavated earth (e/c rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 1.5 m Item 65 2425 Cum
66 66 Providing and Laying Cement Concrete work in foundation Item 66
67 67 1:4:8 (1 cement : 4 Coarse Sand : 8 Graded Stone aggregate 40 mm nominal size) Item 67 194 cum
68 68 Reinforcement cement concrete work infoundation footings,Bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement. Item 68
69 69 1:1.5:3 (1 cement : 1.5 Coarse Sand : 3 Graded Stone aggregate 20 mm nominal size) Item 69 4122.5 cum
70 70 Reinforcement for R.C.C work including bending, binding and placing in position complete Item 70
71 71 Thermo mechanically treated bars Item 71 506825 Kg
72 72 Providing form works including centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain cement concrete work in foundation footings basis of columns, flat surface, vertical valve. Item 72 20855 Sqm
73 73 40mm cement concrete flooring 1:2:4 (1 cem :2 coarse sand : 4 stone aggregate 20mm and down ) finished with a floating coat of neat cement. Item 73 1522.9 Sqm
74 74 C.I. cover (600mm x 600mm) Item 74 485 Each
75 75 P/F M.S. ladder 16mm dia Item 75 9700 Each
76 76 Laying & Fixing of DI Pipe Item 76
77 77 Lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-7 grade pipes as per IS:8329-2000 (amended upto date) with rubber ring joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer Item 77
78 78 Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m Item 78
79 79 Loose / soft soil Item 79 95037 Cum
80 80 Filling available excavated earth (e/c rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 1.5 m Item 80 72448.6 Cum
81 81 Extra for planking and strutting in open timbering if required to be left permanently in position (face area to be timbered permanently left to be measured Item 81 69117.8 Sqm
82 82 Providing & laying cement concrete in foundation Item 82
83 83 1:4:8 ( 1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) Item 83 3912.61 Cum
84 84 Polygonal rubble masonary/R.R masonry (uncoarsed/Brought to course)/Squared rubble masonry (uncoursed brought to course) with hard stone of approved quality in foundation and plingth in c.m. 1:3 (1cem :3 fine sand) including levelling up with cement concrete 1:6:12 ( 1 Cem : 6 c/sand : 12 stone aggt. 20mm nominal size ) at plinth level Item 84 7912.48 Cum
85 85 Laying in trenches DI Pipes Item 85 14545 Rm
86 86 Construction of Pipe Support Item 86
87 87 Earthwork in excavation in foundation trenches or drains i.c dressing of sides and ramming of bottoms lift upto 1.5 m i/c getting out the excavated soil and disposed of surplus excavated soil as directed within a lead of 50 m. Item 87
88 88 (a) Loose/Soft Soil. Item 88 4372.76 Cum
89 89 Filling available excavated earth (e/c rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 1.5 m Item 89 1457.26 Cum
90 90 Providing and laying cement concrete in foundation and plinth e/x the cost of centering and shuttering Item 90
91 91 1:4:8 ( 1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) Item 91 3131.1 Cum
92 92 Extra for laying stone work in or under foul position Item 92 886.9 Cum
93 93 Reinforced Cement Concrete work in foundation footings, bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement. Item 93
94 94 1:1.5:3 ( 1 Cement : 1.5 C.sand : 3 graded stone aggregate 20mm nominal size Item 94 606.066 Cum
95 95 RCC work in columns, pillers and posts upto floor two level i/c finishing and plastering the exposed surface with C.M. 1:3 of thickness not exceeding 6mm to give a smooth and even surface out excluding the cost of centering & shuttering, reinforcement 1:1.5:3 ( 1 Cement : 1.5 c/sand : 3 graded stone aggregate 20mm nominal size) Item 95 73.5 Cum
96 96 Reinforced cement concrete work in suspended floors, roof, landing, shelves and their supports balconies, lintels, beams, plinth beams, girders, bressumers and cantilevers, upto floor two level including finishing and plastering the exposed surface with cement morter 1:3 (1 cement : 3 fine sand ) of thickness not exceeding 6mm to give a smooth and even surface but excluding the cost of centering, shuttering and reinforcement 1 : 1.5 : 3 ( 1 Cement : 1.5 c/sand : 3 graded stone agg. 20mm nominal size) Item 96 249.9 Cum
97 97 Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4m and removal of the same in situ reinforced concrete and plain concrete work in - Item 97
98 98 Columns, pillars, posts and struts ( square rectangular or polygon in plan) Item 98 4429.6 Sqm
99 99 sides and soffits of beams, beam haunchings cantilevers, girders, bressumers and lintels not exceeding 1 m in depth. Item 99 609.56 Sqm
100 100 Reinforcement for R.C.C. work i/c bending and placing in position complete. TMT Bars Item 100 75355 Kg
101 101 Cost of Pipes Item 101
102 102 Providing Ductile Iron (DI) ISI marked K-7 grade pipes as per IS:8329-2000 (amended upto date), Item 102
103 103 700 mm Dia Item 103 2415 RM
104 104 600 mm Dia Item 104 2735 RM
105 105 500 mm Dia Item 105 1625 RM
106 106 400 mm Dia Item 106 4000 RM
107 107 200 mm Dia Item 107 3770 RM
108 108 Installation of Transformers Item 108
109 109 Supply delivery at site with necessary packing, receiving, unloading, shifting, storing, installation of 100 KVA Transformer Item 109 1 Each
110 110 Supply delivery at site with necessary packing, receiving, unloading, shifting, storing, installation of 250 KVA Transformer Item 110 3 Each
111 111 Supply of Electric Motor Pumps Item 111
112 112 Supply delivery at site with necessary packing, receiving, unloading, shifting, storing, fixing of Electric Motor Pump of 60 HP Item 112 12 Each
113 113 Supply delivery at site with necessary packing, receiving, unloading, shifting, storing, fixing of Electric Motor Pump of 30 HP Item 113 8 Each
114 114 Sewage Treatment Plants Item 114
115 115 Design, supply, installation, testing and commissioning of following capacities STP (MBBR process or any other advanced treatment technology suitable to meet KPIs) complete including carrying out all civil works and electro-mechanical works in the proposed STP location by making necessary arrangements to treat the sewage as per applicable disposal standards. Electro-mechanical works shall include design, supply, installation, testing and commissioning of all electro-mechanical components of STP including pumps, drive and drive controls - MCCs valves and supports, all measuring instruments along with their power supply, control and instrument / signal cabling, power cabling, cable containments, earthing etc., Carry out operation and maintenance of STP after the period of commissioning. Item 115
116 116 a) 16.00 MLD near Mongsangei Item 116 1 Unit
117 117 b) 1.00 MLD near Lamphelpat / Samsung Item 117 1 Unit
118 118 Operation & Maintenance with State Budget Item 118
119 119 Operation & maintenance of sewerage collection & conveyance system (RCC/ DI pipes) from open drain at both side of the Nambul River bank point to STP complete. (About 9.14 Km Total Sewer Network) Item 119
120 120 During 1st Year Item 120 109.68 Km. per Month
121 121 During 2nd Year Item 121 109.68 Km. per Month
122 122 During 3rd Year Item 122 109.68 Km. per Month
123 123 During 4th Year Item 123 109.68 Km. per Month
124 124 During 5th Year Item 124 109.68 Km. per Month
125 125 During 6th Year Item 125 109.68 Km. per Month
126 126 During 7th Year Item 126 109.68 Km. per Month
127 127 During 8th Year Item 127 109.68 Km. per Month
128 128 During 9th Year Item 128 109.68 Km. per Month
129 129 During 10th Year Item 129 109.68 Km. per Month
130 130 Operation and maintenance of Sewage treatment plant of capacity of 16.0 MLD including but not limited to all civil, mechanical, electrical but excluding Electricity Charges for operation of the STP (which shall be paid by the Employer) and all works related to plant operation as per scope of work and specifications and performance standards. Item 130
131 131 During 1st Year Item 131 192 ML
132 132 During 2nd Year Item 132 192 ML
133 133 During 3rd Year Item 133 192 ML
134 134 During 4th Year Item 134 192 ML
135 135 During 5th Year Item 135 192 ML
136 136 During 6th Year Item 136 192 ML
137 137 During 7th Year Item 137 192 ML
138 138 During 8th Year Item 138 192 ML
139 139 During 9th Year Item 139 192 ML
140 140 During 10th Year Item 140 192 ML
141 141 Operation and maintenance of Sewage treatment plant of capacity of 1 MLD including but not limited to all civil, mechanical, electrical but excluding Electricity Charges for operation of the STP (which shall be paid by the Employer) and all works related to plant operation as per scope of work and specifications and performance standards. Item 141
142 142 During 1st Year Item 142 12 ML
143 143 During 2nd Year Item 143 12 ML
144 144 During 3rd Year Item 144 12 ML
145 145 During 4th Year Item 145 12 ML
146 146 During 5th Year Item 146 12 ML
147 147 During 6th Year Item 147 12 ML
148 148 During 7th Year Item 148 12 ML
149 149 During 8th Year Item 149 12 ML
150 150 During 9th Year Item 150 12 ML
151 151 During 10th Year Item 151 12 ML
152 152 Operation & Maintenance Item 152
153 153 Annual Operation and Maintenance of the assets created under the project after completion of the Twelve months defect liability period including all consumable items, Repairs, staff Excluding Electricity charges to Run the STP, Lift Stations. The Contractor shall have to mention the Electricity Load required to run the STP & Lifting Stations. Item 153 10 Yrs
154 154 KW for STP Item 154 1 No
155 155 KW for Lift Stations Item 155 1 No
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail