Northern Railway-NR has published Repair Of Platform Surface Of Pf No. 1 At Bvh, Repair To Water Booths And Pf Shelter At Fdb & Bvh Stations And Repair To Facade Station Building At Bvh, Ast And Fdn. Submission Date for this Tender is 21-02-2020. Platform Construction Tenders in Delhi. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item Code | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding Unit |
1 | Schedule A-USSOR items | 15360588.79 | |||||||
2 | 1 | Please see Item Breakup for details. | 449105.00 | 14.27 | 513192.28 | Above/\rBelow/Par | |||
3 | Item Description:- All items appearing in chapters 1 of NR Unified Standard Schedule of Rate( works & material)\r2010 edn. Complete as per Unified Standard specification 2010 edn. Corrected up-to-date (Volume-i&ii ) | ||||||||
4 | 2 | Please see Item Breakup for details. | 30620.00 | 8.54 | 33234.95 | Above/\rBelow/Par | |||
5 | Item Description:- All items appearing in chapter 2 ie Carriage of material of NR Unified Standard Schedule of\rRate( works & material) 2010 edn. Complete as per Unified Standard specification 2010 edn. Corrected up-to-\rdate (Volume-i&ii ) | ||||||||
6 | 3 | Please see Item Breakup for details. | 520097.72 | 24.88 | 649498.03 | Above/\rBelow/Par | |||
7 | Item Description:- All items appearing in chapter 3 ie Cement concrete except item no. 033060 to 033063 NR\rUnified Standard Schedule of Rate( works & material) 2010 edn. Complete as per Unified Standard specification\r2010 edn. Corrected up-to-date (Volume-i&ii ) | ||||||||
8 | 4 | Please see Item Breakup for details. | 2326450.00 | 20.15 | 2795229.68 | Above/\rBelow/Par | |||
9 | Item Description:- %age above/below/at par on item 033060 to 033063 NR Unified Standard Schedule of Rate(\rworks & material) 2010 edn. Complete as per Unified Standard specification 2010 edn. Corrected up-to-date\r(Volume-i&ii ) | ||||||||
10 | 5 | Please see Item Breakup for details. | 459637.75 | 25.40 | 576385.74 | Above/\rBelow/Par | |||
11 | Item Description:- All items appearing in chapter 4 ie Reinforced Cement concrete except item no. 045010 to\r045022 NR Unified Standard Schedule of Rate( works & material) 2010 edn. Complete as per Unified Standard\rspecification 2010 edn. Corrected up-to-date (Volume-i&ii ) | ||||||||
12 | 6 | Please see Item Breakup for details. | 856440.00 | 26.56 | 1083910.46 | Above/\rBelow/Par | |||
13 | ItemDescription:- %age\rabove/below/atparonitem045010to045022ofch4ofNRUnifiedStandard\rSchedule of Rate( works & material) 2010 edn. Complete as per Unified Standard specification 2010 edn.\rCorrected up-to-date (Volume-i&ii ) | ||||||||
14 | Please see Item Breakup for details. | 353931.35 | 28.43 | 454554.03 | Above/\rBelow/Par |