Nagar Palika Parishad-NPP has published Construction Of Tube Well. Submission Date for this Tender is 31-01-2020. Tube Well Tenders in Baheri Bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: CONSTRUCTION OF TUBEWELL | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | SLUICE VALVE CHAMBER\n(MASONARY TYPE)\n(a)(1001) Excavation in foundaton in ordinary soil (loam,clay and sand) including lift upto 1.5m & Lead upto 50m refilling watering & ramming of excavated earth into trenches or into the space between the building & sides of foundaton trenches or into the plinth & disposal of surplus earth upto a distance of 50m from the center of foundation trenches. | 6.32 | cum | |
2 | 2 | (b) (1001 + 1006) for additional lead and lift) Same as above but for depth 1.50 to 3.0m) | 2.73 | cum | |
3 | 3 | (1011 + 1006) Concrete with 4cm guage brick ballast, local sand & cement in proportion of 8:4:1 in foundation, including supply of all materials, labour, T & P etc. required for proper completion of work. (1.50 to 3.0m depth) | 0.634 | cum | |
4 | 4 | (a) (1029) Ist class brick work in 1:6 cement and local sand & coarse sand mortar in foundation & plinth including supply of all materials, labour, T & P etc. required for proper completion of the work. | 2.1 | cum | |
5 | 5 | (b) (1029 + 1006) Same as above but for depth 1.50 to 3.0m | 0.75 | cum | |
6 | 6 | (1020) RCC with cement, coarse sand & 2cm approved stone ballast in proportion of 1:2:4 excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 mm thick binding wire in position & necessary centering sand shutering including curing and supply of all materials, labour, T & P etc. required for proper completion of work. | 0.34 | cum | |
7 | 7 | (a) (1188) 12mm thick plaster with cement & local sand mortar in 1:4 over brick work minimum thickness not to be less than 10 mm supply of all materials, labour, T & P etc. required for proper completion of the work. (depth upto 1.50m) | 7.84 | sqm | |
8 | 8 | (b) (1088+1006) Same as above item 5(a) but in depth 1.50 to 3.0m | 2.8 | sqm | |
9 | 9 | (1151) Mild steel or iron work in RCC or R.B. work wrought to required shape as necessary including bending for proper completion of work including supply of steel & wastage etc. | 0.3 | qtl. | |
10 | 10 | PUMP HOUSE CUM CHLORINATING ROOM\n(Size of pump house 3.6m x 3.0m x 3.6m) & Chlorinator Room 1.8x1.2x3.00\n(1001) Excavation in foundation in ordinary soil (loam, clay, and sand) including lift upto 1.5 m & lead upto 50 m refilling, watering and ramming of excavated earth into trenches or into the space between the building and sides of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of foundation trenches. | 20.6 | cum | |
11 | 11 | (1009) Concrete with 4cm guage brick ballast, local sand & cement in proportion of 12:6:1 in foundation, including supply of all materials, labour, T & P etc. required for proper completion of work. | 4.91 | cum | |
12 | 12 | (1011) Concrete with 4cm guage brick ballast, local sand & cement in proportion of 8:4:1 in foundation, including supply of all materials, labour, T & P etc. required for proper completion of work. | 0.61 | cum | |
13 | 13 | (1029) Ist class brick work in 1:6 cement and coarse sand mortar in foundation & plinth including supply of all materials, labour, T & P etc. required for proper completion of the work. | 18.15 | cum | |
14 | 14 | (1054) 20mm thick damp proof course with cement and approved coarse sand 1:2 including 5% water proffing materials, or as specified by manufactures, supply of all materials, labour and T & P etc, required for proper completion of work including and shuttering as necessary. | 5.96 | sqm | |
15 | 15 | (1029+1036) Ist class brick in 1:6 cement and coarse sand mortar in super structure including supply of all materials, labour, T & P etc. required for proper completion of the work. | 16.94 | cum | |
16 | 16 | (1150) M.S. angle iron chaukhats of 40x40x6 mm size supply and fixing including simple moulding straight work as in chaukhats also supply of all materials, labour, T & P etc. required for proper completion of the work. Including hold fast. | 0.45 | qtl. | |
17 | 17 | Supply and fixing hold fasts in door & window chaukhats 25cm x 5cm x 6c flat iron including their cutting and moulding & welding to required shape also including other materials such as nails & screws etc, required for proper completion of work. | 14 | Nos. | |
18 | 18 | (1020) RCC with cement, coarse sand & 20mm guage approved stone ballast in proportion of 1:2:4 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 mm thick binding wire in position & necessary centering sand shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work. (plinth beam, tie beam at lintle level, sushed etc.) | 3.98 | cum | |
19 | 19 | (1151) Mild steel or iron work in RCC work wrought to required shape as necessary including bending for proper completion of work including supply of steel & wastage etc. | 2.52 | qtl. | |
20 | 20 | Mild steel grill in windows wriught to required form including supply of steel, labour T&P etc. required for completion of the work. | 4.08 | sqm | |
21 | 21 | (1167) Supply and lay complete 4 cm thick insulation layer of sand and clay over reinforcement cement concrete or R.B. roof. | 13 | sqm | |
22 | 22 | (1149) Supply & fixing Z-Section F-7 windows including handles, nuts & bolts, welding etc, complete as per drawing. | 2 | qtl. | |
23 | 23 | (1014) Lime conc. With 2.5cm guage brick ballast, white lime and surkhi in proportion of 100:18:36 in roof terracing including supply of all materials, labour T&P etc. required for proper completion of the work. | 1.3 | cum | |
24 | 24 | (1190) 12 mm thick plaster with cement & local sand mortar in 1:6 over brick work minimum thickness not to be less than 10mm including supply of all materials, labour T&P etc. required for proper completion of the work. | 138 | sqm | |
25 | 25 | (1186+1191) Same as above item No. 15 but in proportion 1:3 with cement and Fine sand and coarse sand mortar over ceiling. | 16.02 | sqm | |
26 | 26 | (1188) Same as above item No. 15 but in proprtion 1:4 with cement and Fine sand and coarse sand mortar. | 12.31 | sqm | |
27 | 27 | (1178) Struck pointing with cement and coarse sand mortar in 1:2 on brick work including supply of all materials, labour T&P etc. required for proper completion of the work. | 4.93 | sqm | |
28 | 28 | (1202) 25mm thick 1:2:4 PCC floor with cement and coarse sand & 2cm guage approved stone ballast jaid in pannels finished with 3mm floating coat of neat cement and 7.5cm thick base concrete consisting of cement & local sand and Ist class brick ballast 4cm guage in proportion 1:6:12 and removing any overlapping of mortar in the joint of the pannels if any, given then uniform finish including supply of all materials, labour T&P etc. required for proper completion of the work.including supply of all materials, labour T&P etc. required for proper completion of the work. | 8.53 | sqm | |
29 | 29 | Same as above item No. 19 in floors but including supply & fixing of 5mm thick & 25 mm wide glass strips. | 15 | sqm | |
30 | 30 | (1080) Supply and fixing 4cm thick fully panneled sheesham wood shutters, including supply and fixing and adjustment of hinges, bolts, handles and springs and other fittings but excluding painting and supply of fittings. | 3.99 | sqm | |
31 | 31 | Supply and fixing 3mm thick plain glass in Z-section window including supply of nalls and putty etc. required for proper completion of the work. | 4.08 | sqm | |
32 | 32 | Supply and fixing oxidized iron fitting of approved make in door and window shutters. | 8.07 | sqm | |
33 | 33 | (1232+1233) painting or varnishing of new iron or wood work with one coats of approved paint & varnish including supply of all materials, labour T&P etc. required for proper completion of the work. | 20.22 | sqm | |
34 | 34 | (1253) White washing three coats including supply of all materials, labour T&P etc. required for proper completion of the work. | 70.62 | sqm | |
35 | 35 | Snowcem in two coats or approved shade including supply of all materials, labour T&P etc. required for proper completion of the work. | 88.5 | sqm | |
36 | 36 | Provide and fix RCC jalies of 30cm x 50cm size including supply of all materials, labour T&P etc. required for proper completion of the work. | 3 | no. | |
37 | 37 | Supply and fixing of grider of 200mm x 100mm size 15mm thick over the pump house including its painting with approved paint and also one coat of primer. | 3.7 | m | |
38 | 38 | (1046) Drip course in 1:6 cement and local sand mortar on projected work including plastering ctting drip notch as required supply of all materials, labour T&P etc. required for proper completion of the work. | 14.19 | m | |
39 | 39 | Supply and fixing of RCC manhole cover of 0.6 x 0.6 m size in opening of RCC slab. | 1 | Nos. | |
40 | 40 | Construction of flower pot in front of chlorinating room including supply of all materials, labour T&P etc. required for proper completion of the work. | 1 | Job | |
41 | 41 | Supply of all materials, labour T&P etc. required for the construction of 250mm dia semi circuler drain. | 15 | m | |
42 | 42 | 3 MONTHS TRIAL RUN INCLUDING ELECTRICITY (MOHAMMADPUR) | 1 | Job | |
43 | 43 | 3 MONTHS TRIAL RUN INCLUDING ELECTRICITY (NAYI BASTI) | 1 | Job | |
44 | 44 | 3 MONTHS TRIAL RUN INCLUDING ELECTRICITY (SHYAMACHARAN GAUTIYA) | 1 | Job | |
45 | 45 | 3 MONTHS TRIAL RUN INCLUDING ELECTRICITY (NOORI NAGAR) | 1 | Job | |
46 | 46 | 3 MONTHS TRIAL RUN INCLUDING ELECTRICITY (PUNJABI COLONY) | 1 | Job | |
47 | 47 | SERVO VOLTAGE STABILIZER\nSupply, installation and Commissioning of automatic servo voltage stabilizer-40KVA (Input Voltage 230V±450V) to Output Voltage 415V± 1% As per IS 9815-1994 | 1 | No. | |
48 | 48 | ELECTRIFICATION OF PUMP HOUSE\nInternal Electrification of pump house. | 1 | No. | |
49 | 49 | CHLORINATING PLANT\nSupply, installation and commissioning of Electronic type chlorinating plant of 6 LPH Capacity | 1 | No. | |
50 | 50 | TRANSMISSION LINE\nSupply and erection of HT transmission line with material comlete in all respect. | 0.5 | km | |
51 | 51 | Supply of 63 KVA transformer including all material required for installation & double pole | 1 | No. | |
52 | 52 | Security money for power connection \n14 KW=17.5 KVA | 17.5 | KVA | |
53 | 53 | System loading charges | 14 | KW | |
54 | 54 | Energy Meter | 1 | No. | |
55 | 55 | Processing Fee | 1 | Job | |
56 | 56 | PUMPING PLANT\nSwitch gear material complete having following items\nAutomatic Air brake Star Delta starter 25 HP\nMain Switch of 100A capacity\n100 mm dia size ammeter of 0-100amp, 100/5 CTR\n100 mm. dia size voltmeter of 0-500 V.\nSelector switch for voltmeter\nIndicating lamps.\nSingle phasing preventor.\nPower capacitor of suitable size\nPower wiring material from power meter to motor through switches and starter complete and double earthing material comlete set.\nSubmersible cable of 6 square mm\nearth plate 2'x2'\nearth pipe 3.0m long\nearth chamber cover etc.\nearth strip alluminium, 12mmx3mm\nCharcol\nSalt\nFlexible pipe and conduit pipe\nCaution Plate | 1 | Job | |
57 | 57 | Supply of submersible pumping plant of 1500 LPM, 50m head (As per IS:8034) | 1 | Job | |
58 | 58 | Main piping and valves of 150 mm. size with 24 m column assembly. (Sluice valve Confirming to IS:14846-2000 & Reflex Valve Confirming to IS:5312 part-1 having following items\n150 mm dia D/F Reflux Valve as per IS\n150 mm dia D/F Sluice Valve with hand wheel as per IS\n150 mm diz C.I.A/F. Tee as per IS\n150 mm diz C.I.D/F. Bend 90° as per IS\n150 mm dia M.S.D/F pipe 5.4 mm thick 1.5 meter long as per IS.\n150 mm dia M.S.D/F pipe 5.4 mm thick 1 meter long as per IS.\nNecessary nuts, bolts with washers and rubber packing etc.\nEnlarger of required size.\n150 mm size column pipe clamps\n150 mm dia M.S. Flanged column assembly 24 meter, 7.1 mm. thick in app. 3 meter length.\nJointing material rubber packing and nut bolts etc. complete. | 1 | Job | |
59 | 59 | Pressure and depth guages\nPressure guage(0-7) kg. range. Fibig make\nDepth guage(0-400) feet. range. Fibig make\nAirline 6 mm size with socket\nAirline fittings:\nBends, Elbow, Unioins, Stop cocks, Reducers, control cock\nHand air pump\nSunmica Top wooden board.\n | 1 | Job | |
60 | 60 | Special tools and spanner having following\nPipe wrenches\nD/E Spanner 22/6 mm\nAdjustable wrench 300mm\nScrew Driver\n12x250 mm\n8x250\nPlier 200 mm\nHammer 2 Lbs | 1 | Job | |
61 | 61 | Lifting tackle 2 tones/4.5mt Lift | 1 | Job | |
62 | 62 | Misc. Item such as protection ring, kit kat etc. | 1 | Job | |
63 | 63 | Erection of pumping plant. Power wiring and earthing | 1 | Job | |
64 | 64 | Testing & Trial | 1 | Job | |
65 | 65 | One Month watch & ward during the period of installation | 1 | Job | |
66 | 66 | Painting of Pumping Plant | 1 | Job | |
67 | 67 | CONSTRUCTION OF NEW TUBEWELL WITH 300MMX200 MM DIA SIZE T/W\nTransportation of Rig Machine and its T&P\nTransportation of Rig Machine from store to tube well site with clamp equipage. | 50 | km | |
68 | 68 | Carting of rig machine T&P from Bareilly store to site work (x2) | 100 | km | |
69 | 69 | Return trip of empty truck | 100 | km | |
70 | 70 | Handling charges of above materials | 4 | trips | |
71 | 71 | Return trip of rig machine and its T&P from site of work to Bareilly store. | 1 | Job | |
72 | 72 | Transportation of Tubewell Assembly\nCarting of tubewell assembly from store to site of work | 50 | km | |
73 | 73 | Return trip of empty truck | 50 | km | |
74 | 74 | Handling charges | 4 | Sets | |
75 | 75 | Transportation of Compressor\nToeing of compressor unit from Bareilly store to site of work. | 50 | km | |
76 | 76 | Carting of compressor T&P from Bareilly store to site of work. | 50 | km | |
77 | 77 | Return trip of empty truck | 50 | km | |
78 | 78 | Handling charges | 2 | Sets | |
79 | 80 | Return of compressor and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
80 | 81 | Transportation of O.P. Unit\nToeing of O.P. unit from divn. store to site | 50 | km | |
81 | 82 | Carting of O.P. Uniit T&P from Divn. Store to site | 50 | km | |
82 | 83 | Return trip of empty truck | 50 | km | |
83 | 84 | Handling charges | 2 | Sets | |
84 | 86 | Return of above O.P. Unit and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
85 | 87 | Supply of Tubewell Assembly\n300 mm. dia M.S. Housing Pipe | 45 | m | |
86 | 88 | 300x200 mm dia reducer | 1 | No. | |
87 | 89 | 200 mm dia M.S. Plain Pipe | 99 | m | |
88 | 90 | 200 mm dia M.S. Slotted Pipe | 36 | m | |
89 | 91 | 300 mm dia M.S. Tubwell Cap | 1 | No. | |
90 | 92 | 200 mm dia M.S. Bail plug | 1 | No. | |
91 | 93 | 300 mm dia M.S. Clamp | 1 | No. | |
92 | 94 | 300 mm dia M.S. Rings | 7 | Nos. | |
93 | 95 | 200 mm dia M.S. Rings | 25 | Nos. | |
94 | 96 | 200 mm dia Center Guides | 8 | Nos. | |
95 | 97 | M.S. Support (I-Section) 300 mm dia | 1 | No. | |
96 | 98 | PEA-GRAVEL\n1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for tubewell | 67 | m3 | |
97 | 99 | Drilling of bore by rig machine As Per IS:2800(Part I & II):\nErection of RC 600/27 rig machine Camp equipage. | 1 | Set | |
98 | 100 | Drilling of bore by 675 mm dia Bit GL to 50 mt. BGL | 50 | m | |
99 | 101 | Drilling of bore by 550 mm dia bit 50 m BGL to 90 m. BGL | 40 | m | |
100 | 102 | Drilling of bore by 550 mm dia bit 90 m BGL to 120 m. BGL | 30 | m | |
101 | 103 | Drilling of bore by 550 mm dia bit 120 m BGL to 150 m. BGL | 30 | m | |
102 | 104 | Drilling of bore by 550 mm dia bit 150 m BGL to 180 m. BGL | 30 | m | |
103 | 105 | Dismentling of rig machine a camp Equipage. | 1 | Set | |
104 | 106 | Lowering of tubewell assembly with M.S. rings, Bail Plug, Reducer Including welding:\nLowering of 300 mm dia M.S. Housing pipe from GL to 45 m. BGL | 40 | m | |
105 | 107 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 45 m. BGL to 90 m. BGL | 50 | m | |
106 | 108 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 90 m. BGL to 120 m. BGL | 30 | m | |
107 | 109 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 120 m. BGL to 150 m. BGL | 30 | m | |
108 | 110 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 150 m. BGL to 170 m. BGL | 20 | m | |
109 | 111 | Development of Tubewell by 250 PSI air compressor and cusec O.P. Unit to yield sand free discharge.\nErection of air compressor with its T&P and camp equipage etc. | 1 | Set. | |
110 | 112 | Development and testing of tubewell by air compressor. | 60 | Hrs. | |
111 | 113 | Dismentling of Air Compressor with its T&P, camp equipage. | 1 | Set. | |
112 | 114 | Erection of O.P. Unit with its T&P and camp equipage etc. | 1 | Set. | |
113 | 115 | Development and testing of tube well O.P. Unit to yield sand free discharge. | 100 | Hrs. | |
114 | 116 | Dismentling of O.P. Unit with its T&P, camp equipage | 1 | Set. | |
115 | 117 | Chemical and Bacteriological test (Analysis of water sample) | 2 | Sets. | |
116 | 118 | Vertically test of tube well. | 1 | No. | |
117 | 119 | Making Approach Road for transportation of rig machine | 1 | No. | |
118 | 120 | Bericating of site for safety during construction. | 1 | Set. | |
119 | 121 | Rental of Rig Machine, Compressor and O.P. Unit | 1 | No. | |
120 | 122 | Watch and Ward for Construction Period | 1 | Job | |
121 | 123 | SERVO VOLTAGE STABILIZER\nSupply, installation and Commissioning of automatic servo voltage stabilizer-40KVA (Input Voltage 230V±450V) to Output Voltage 415V± 1% As per IS 9815-1994 | 1 | No. | |
122 | 124 | ELECTRIFICATION OF PUMP HOUSE\nInternal Electrification of pump house. | 1 | No. | |
123 | 125 | CHLORINATING PLANT\nSupply, installation and commissioning of Electronic type chlorinating plant of 6 LPH Capacity | 1 | No. | |
124 | 126 | TRANSMISSION LINE\nSupply and erection of HT transmission line with material comlete in all respect. | 0.4 | km | |
125 | 127 | Supply of 63 KVA transformer including all material required for installation & double pole | 1 | No. | |
126 | 128 | Security money for power connection \n14 KW=17.5 KVA | 18 | KVA | |
127 | 129 | System loading charges | 14 | KW | |
128 | 130 | Energy Meter | 1 | No. | |
129 | 131 | Processing Fee | 1 | Job | |
130 | 132 | PUMPING PLANT\nSwitch gear material complete having following items\nAutomatic Air brake Star Delta starter 25 HP\nMain Switch of 100A capacity\n100 mm dia size ammeter of 0-100amp, 100/5 CTR\n100 mm. dia size voltmeter of 0-500 V.\nSelector switch for voltmeter\nIndicating lamps.\nSingle phasing preventor.\nPower capacitor of suitable size\nPower wiring material from power meter to motor through switches and starter complete and double earthing material comlete set.\nSubmersible cable of 6 square mm\nearth plate 2'x2'\nearth pipe 3.0m long\nearth chamber cover etc.\nearth strip alluminium, 12mmx3mm\nCharcol\nSalt\nFlexible pipe and conduit pipe\nCaution Plate | 1 | Set | |
131 | 133 | Supply of submersible pumping plant of 1500 LPM, 50m head (As per IS:8034) | 1 | Set | |
132 | 134 | Main piping and valves of 150 mm. size with 24 m column assembly. (Sluice valve Confirming to IS:14846-2000 & Reflex Valve Confirming to IS:5312 part-1 having following items\n150 mm dia D/F Reflux Valve as per IS\n150 mm dia D/F Sluice Valve with hand wheel as per IS\n150 mm diz C.I.A/F. Tee as per IS\n150 mm diz C.I.D/F. Bend 90° as per IS\n150 mm dia M.S.D/F pipe 5.4 mm thick 1.5 meter long as per IS.\n150 mm dia M.S.D/F pipe 5.4 mm thick 1 meter long as per IS.\nNecessary nuts, bolts with washers and rubber packing etc.\nEnlarger of required size.\n150 mm size column pipe clamps\n150 mm dia M.S. Flanged column assembly 24 meter, 7.1 mm. thick in app. 3 meter length.\nJointing material rubber packing and nut bolts etc. complete. | 1 | Set | |
133 | 135 | Pressure and depth guages\nPressure guage(0-7) kg. range. Fibig make\nDepth guage(0-400) feet. range. Fibig make\nAirline 6 mm size with socket\nAirline fittings:\nBends, Elbow, Unioins, Stop cocks, Reducers, control cock\nHand air pump\nSunmica Top wooden board.\n | 1 | Set | |
134 | 136 | Special tools and spanner having following\nPipe wrenches\nD/E Spanner 22/6 mm\nAdjustable wrench 300mm\nScrew Driver\n12x250 mm\n8x250\nPlier 200 mm\nHammer 2 Lbs | 1 | Set | |
135 | 137 | Lifting tackle 2 tones/4.5mt Lift | 1 | No. | |
136 | 138 | Misc. Item such as protection ring, kit kat etc. | 1 | Set | |
137 | 139 | Erection of pumping plant. Power wiring and earthing | 1 | Set | |
138 | 140 | Testing & Trial | 1 | Job | |
139 | 141 | One Month watch & ward during the period of installation | 1 | Job | |
140 | 142 | Painting of Pumping Plant | 1 | Job | |
141 | 143 | CONSTRUCTION OF NEW TUBEWELL WITH 300MMX200 MM DIA SIZE T/W\nTransportation of Rig Machine and its T&P\nTransportation of Rig Machine from store to tube well site with clamp equipage. | 50 | km | |
142 | 144 | Carting of rig machine T&P from Bareilly store to site work (x2) | 100 | km | |
143 | 145 | Return trip of empty truck | 100 | km | |
144 | 146 | Handling charges of above materials | 4 | trips | |
145 | 147 | Return trip of rig machine and its T&P from site of work to Bareilly store. | 1 | job | |
146 | 148 | Transportation of Tubewell Assembly\nCarting of tubewell assembly from store to site of work | 50 | km | |
147 | 149 | Return trip of empty truck | 50 | km | |
148 | 150 | Handling charges | 4 | Sets | |
149 | 151 | Transportation of Compressor\nToeing of compressor unit from Bareilly store to site of work. | 50 | km | |
150 | 152 | Carting of compressor T&P from Bareilly store to site of work. | 50 | km | |
151 | 153 | Return trip of empty truck | 50 | km | |
152 | 154 | Handling charges | 2 | Sets | |
153 | 155 | Return of compressor and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
154 | 156 | Transportation of O.P. Unit\nToeing of O.P. unit from divn. store to site | 50 | km | |
155 | 157 | Carting of O.P. Uniit T&P from Divn. Store to site | 50 | km | |
156 | 158 | Return trip of empty truck | 50 | km | |
157 | 159 | Handling charges | 2 | Sets | |
158 | 160 | Return of above O.P. Unit and connected T&P from site of wrk to Bareilly store. | 1 | job | |
159 | 161 | Supply of Tubewell Assembly\n300 mm. dia M.S. Housing Pipe | 45 | m | |
160 | 162 | 300x200 mm dia reducer | 1 | No. | |
161 | 163 | 200 mm dia M.S. Plain Pipe | 99 | m | |
162 | 164 | 200 mm dia M.S. Slotted Pipe | 36 | m | |
163 | 165 | 300 mm dia M.S. Tubwell Cap | 1 | No. | |
164 | 166 | 200 mm dia M.S. Bail plug | 1 | No. | |
165 | 167 | 300 mm dia M.S. Clamp | 1 | No. | |
166 | 168 | 300 mm dia M.S. Rings | 7 | Nos. | |
167 | 169 | 200 mm dia M.S. Rings | 25 | Nos. | |
168 | 170 | 200 mm dia Center Guides | 8 | Nos. | |
169 | 171 | M.S. Support (I-Section) 300 mm dia | 1 | No. | |
170 | 172 | PEA-GRAVEL (As per IS:4097)\n1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for tubewell | 67 | m3 | |
171 | 173 | Drilling of bore by rig machine As Per IS:2800(Part I & II):\nErection of RC 600/27 rig machine Camp equipage. | 1 | Set | |
172 | 174 | Drilling of bore by 675 mm dia Bit GL to 50 mt. BGL | 50 | m | |
173 | 175 | Drilling of bore by 550 mm dia bit 50 m BGL to 90 m. BGL | 40 | m | |
174 | 176 | Drilling of bore by 550 mm dia bit 90 m BGL to 120 m. BGL | 30 | m | |
175 | 177 | Drilling of bore by 550 mm dia bit 120 m BGL to 150 m. BGL | 30 | m | |
176 | 178 | Drilling of bore by 550 mm dia bit 150 m BGL to 180 m. BGL | 30 | m | |
177 | 179 | Dismentling of rig machine a camp Equipage. | 1 | Set | |
178 | 180 | Lowering of tubewell assembly with M.S. rings, Bail Plug, Reducer Including welding:\nLowering of 300 mm dia M.S. Housing pipe from GL to 45 m. BGL | 40 | m | |
179 | 181 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 45 m. BGL to 90 m. BGL | 50 | m | |
180 | 182 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 90 m. BGL to 120 m. BGL | 30 | m | |
181 | 183 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 120 m. BGL to 150 m. BGL | 30 | m | |
182 | 184 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 150 m. BGL to 170 m. BGL | 20 | m | |
183 | 185 | Development of Tubewell by 250 PSI air compressor and cusec O.P. Unit to yield sand free discharge.\nErection of air compressor with its T&P and camp equipage etc. | 1 | Set. | |
184 | 186 | Development and testing of tubewell by air compressor. | 60 | Hrs. | |
185 | 187 | Dismentling of Air Compressor with its T&P, camp equipage. | 1 | Set. | |
186 | 188 | Erection of O.P. Unit with its T&P and camp equipage etc. | 1 | Set. | |
187 | 189 | Development and testing of tube well O.P. Unit to yield sand free discharge. | 100 | Hrs. | |
188 | 190 | Dismentling of O.P. Unit with its T&P, camp equipage | 1 | Set. | |
189 | 191 | Chemical and Bacteriological test (Analysis of water sample) | 2 | Sets. | |
190 | 192 | Vertically test of tube well. | 1 | No. | |
191 | 193 | Making Approach Road for transportation of rig machine | 1 | No. | |
192 | 194 | Bericating of site for safety during construction. | 1 | Set. | |
193 | 195 | Rental of Rig Machine, Compressor and O.P. Unit | 1 | No. | |
194 | 196 | Watch and Ward for Construction Period | 1 | Job | |
195 | 197 | SERVO VOLTAGE STABILIZER\nSupply, installation and Commissioning of automatic servo voltage stabilizer-40KVA (Input Voltage 230V±450V) to Output Voltage 415V± 1% As per IS 9815-1994 | 1 | No. | |
196 | 198 | ELECTRIFICATION OF PUMP HOUSE\nInternal Electrification of pump house. | 1 | No. | |
197 | 199 | CHLORINATING PLANT\nSupply, installation and commissioning of Electronic type chlorinating plant of 6 LPH Capacity | 1 | No. | |
198 | 200 | TRANSMISSION LINE\nSupply and erection of HT transmission line with material comlete in all respect. | 0.4 | km | |
199 | 201 | Supply of 63 KVA transformer including all material required for installation & double pole | 1 | No. | |
200 | 202 | Security money for power connection \n17 KW=21 KVA | 21 | KVA | |
201 | 203 | System loading charges | 17 | KW | |
202 | 204 | Energy Meter | 1 | No. | |
203 | 205 | Processing Fee | 1 | Job | |
204 | 206 | PUMPING PLANT\nSwitch gear material complete having following items\nAutomatic Air brake Star Delta starter 25 HP\nMain Switch of 100A capacity\n100 mm dia size ammeter of 0-100amp, 100/5 CTR\n100 mm. dia size voltmeter of 0-500 V.\nSelector switch for voltmeter\nIndicating lamps.\nSingle phasing preventor.\nPower capacitor of suitable size\nPower wiring material from power meter to motor through switches and starter complete and double earthing material comlete set.\nSubmersible cable of 6 square mm\nearth plate 2'x2'\nearth pipe 3.0m long\nearth chamber cover etc.\nearth strip alluminium, 12mmx3mm\nCharcol\nSalt\nFlexible pipe and conduit pipe\nCaution Plate | 1 | Set | |
205 | 207 | Supply of submersible pumping plant of 1500 LPM, 50m head (As per IS:8034) | 1 | Set | |
206 | 208 | Main piping and valves of 150 mm. size with 24 m column assembly. (Sluice valve Confirming to IS:14846-2000 & Reflex Valve Confirming to IS:5312 part-1 having following items\n150 mm dia D/F Sluice Valve with hand wheel as per IS\n150 mm diz C.I.A/F. Tee as per IS\n150 mm diz C.I.D/F. Bend 90° as per IS\n150 mm dia M.S.D/F pipe 5.4 mm thick 1.5 meter long as per IS.\n150 mm dia M.S.D/F pipe 5.4 mm thick 1 meter long as per IS.\nNecessary nuts, bolts with washers and rubber packing etc.\nEnlarger of required size.\n150 mm size column pipe clamps\n150 mm dia M.S. Flanged column assembly 24 meter, 7.1 mm. thick in app. 3 meter length.\nJointing material rubber packing and nut bolts etc. complete. | 1 | Set | |
207 | 209 | Pressure and depth guages\nPressure guage(0-7) kg. range. Fibig make\nDepth guage(0-400) feet. range. Fibig make\nAirline 6 mm size with socket\nAirline fittings:\nBends, Elbow, Unioins, Stop cocks, Reducers, control cock\nHand air pump\nSunmica Top wooden board. | 1 | Set | |
208 | 210 | Special tools and spanner having following\nPipe wrenches\nD/E Spanner 22/6 mm\nAdjustable wrench 300mm\nScrew Driver\n12x250 mm\n8x250\nPlier 200 mm\nHammer 2 Lbs | 1 | Set | |
209 | 211 | Lifting tackle 2 tones/4.5mt Lift | 1 | No. | |
210 | 212 | Misc. Item such as protection ring, kit kat etc. | 1 | Set | |
211 | 213 | Erection of pumping plant. Power wiring and earthing | 1 | Set | |
212 | 214 | Testing & Trial | 1 | Job | |
213 | 215 | One Month watch & ward during the period of installation | 1 | Job | |
214 | 216 | Painting of Pumping Plant | 1 | Job | |
215 | 217 | CONSTRUCTION OF NEW TUBEWELL WITH 300MMX200 MM DIA SIZE T/W\nTransportation of Rig Machine and its T&P\nTransportation of Rig Machine from store to tube well site with clamp equipage. | 50 | km | |
216 | 218 | Carting of rig machine T&P from Bareilly store to site work (x2) | 100 | km | |
217 | 219 | Return trip of empty truck | 100 | km | |
218 | 220 | Handling charges of above materials | 4 | trips | |
219 | 221 | Return trip of rig machine and its T&P from site of work to Bareilly store. | 1 | Job | |
220 | 222 | Transportation of Tubewell Assembly\nCarting of tubewell assembly from store to site of work | 50 | km | |
221 | 223 | Return trip of empty truck | 50 | km | |
222 | 224 | Handling charges | 4 | Sets | |
223 | 225 | Transportation of Compressor\nToeing of compressor unit from Bareilly store to site of work. | 50 | km | |
224 | 226 | Carting of compressor T&P from Bareilly store to site of work. | 50 | km | |
225 | 227 | Return trip of empty truck | 50 | km | |
226 | 228 | Handling charges | 2 | Sets | |
227 | 229 | Return of compressor and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
228 | 230 | Transportation of O.P. Unit\nToeing of O.P. unit from divn. store to site | 50 | km | |
229 | 231 | Carting of O.P. Uniit T&P from Divn. Store to site | 50 | km | |
230 | 232 | Return trip of empty truck | 50 | km | |
231 | 233 | Handling charges | 2 | Sets | |
232 | 234 | Return of above O.P. Unit and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
233 | 235 | Supply of Tubewell Assembly\n300 mm. dia M.S. Housing Pipe | 45 | m | |
234 | 236 | 300x200 mm dia reducer | 1 | No. | |
235 | 237 | 200 mm dia M.S. Plain Pipe | 99 | m | |
236 | 238 | 200 mm dia M.S. Slotted Pipe | 36 | m | |
237 | 239 | 300 mm dia M.S. Tubwell Cap | 1 | No. | |
238 | 240 | 200 mm dia M.S. Bail plug | 1 | No. | |
239 | 241 | 300 mm dia M.S. Clamp | 1 | No. | |
240 | 242 | 300 mm dia M.S. Rings | 7 | Nos. | |
241 | 243 | 200 mm dia M.S. Rings | 25 | Nos. | |
242 | 244 | 200 mm dia Center Guides | 8 | Nos. | |
243 | 245 | M.S. Support (I-Section) 300 mm dia | 1 | No. | |
244 | 246 | PEA-GRAVEL (As per IS:4097)\n1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for tubewell | 80 | m3 | |
245 | 247 | Drilling of bore by rig machine As Per IS:2800(Part I & II):\nErection of RC 600/27 rig machine Camp equipage. | 1 | Set | |
246 | 248 | Drilling of bore by 675 mm dia Bit GL to 50 mt. BGL | 50 | m | |
247 | 249 | Drilling of bore by 550 mm dia bit 50 m BGL to 90 m. BGL | 40 | m | |
248 | 250 | Drilling of bore by 550 mm dia bit 90 m BGL to 120 m. BGL | 30 | m | |
249 | 251 | Drilling of bore by 550 mm dia bit 120 m BGL to 150 m. BGL | 30 | m | |
250 | 252 | Drilling of bore by 550 mm dia bit 150 m BGL to 180 m. BGL | 30 | m | |
251 | 253 | Drilling of bore by 550 mm dia bit 180 m BGL to 200 m. BGL | 20 | m | |
252 | 254 | Dismentling of rig machine a camp Equipage. | 1 | Set | |
253 | 255 | Lowering of tubewell assembly with M.S. rings, Bail Plug, Reducer Including welding:\nLowering of 300 mm dia M.S. Housing pipe from GL to 45 m. BGL | 45 | m | |
254 | 256 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 45 m. BGL to 90 m. BGL | 45 | m | |
255 | 257 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 90 m. BGL to 120 m. BGL | 30 | m | |
256 | 258 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 120 m. BGL to 150 m. BGL | 30 | m | |
257 | 259 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 150 m. BGL to 180 m. BGL | 30 | m | |
258 | 260 | Development of Tubewell by 350 PSI air compressor and cusec O.P. Unit to yield sand free discharge.\nErection of air compressor with its T&P and camp equipage etc. | 1 | Set. | |
259 | 261 | Development and testing of tubewell by air compressor. | 60 | Hrs. | |
260 | 262 | Dismentling of Air Compressor with its T&P, camp equipage. | 1 | Set. | |
261 | 263 | Erection of O.P. Unit with its T&P and camp equipage etc. | 1 | Set. | |
262 | 264 | Development and testing of tube well O.P. Unit to yield sand free discharge. | 100 | Hrs. | |
263 | 265 | Dismentling of O.P. Unit with its T&P, camp equipage | 1 | Set. | |
264 | 266 | Chemical and Bacteriological test (Analysis of water sample) | 2 | Sets. | |
265 | 267 | Vertically test of tube well. | 1 | No. | |
266 | 268 | Making Approach Road for transportation of rig machine | 1 | No. | |
267 | 269 | Bericating of site for safety during construction. | 1 | Set. | |
268 | 270 | Rental of Rig Machine, Compressor and O.P. Unit | 1 | No. | |
269 | 271 | Watch and Ward for Construction Period | 1 | Job | |
270 | 272 | SERVO VOLTAGE STABILIZER\nSupply, installation and Commissioning of automatic servo voltage stabilizer-40KVA (Input Voltage 230V±450V) to Output Voltage 415V± 1% As per IS 9815-1994 | 1 | No. | |
271 | 273 | ELECTRIFICATION OF PUMP HOUSE\nInternal Electrification of pump house. | 1 | No. | |
272 | 274 | CHLORINATING PLANT\nSupply, installation and commissioning of Electronic type chlorinating plant of 6 LPH Capacity | 1 | No. | |
273 | 275 | TRANSMISSION LINE\nSupply and erection of HT transmission line with material comlete in all respect. | 0.5 | km | |
274 | 276 | Supply of 63 KVA transformer including all material required for installation & double pole | 1 | No. | |
275 | 277 | Security money for power connection 21 KW=26 KVA | 21 | KVA | |
276 | 278 | System loading charges | 17 | KW | |
277 | 279 | Energy Meter | 1 | No. | |
278 | 280 | Processing Fee | 1 | Job | |
279 | 281 | PUMPING PLANT\nSwitch gear material complete having following items\nAutomatic Air brake Star Delta starter 25 HP\nMain Switch of 100A capacity\n100 mm dia size ammeter of 0-100amp, 100/5 CTR\n100 mm. dia size voltmeter of 0-500 V.\nSelector switch for voltmeter\nIndicating lamps.\nSingle phasing preventor.\nPower capacitor of suitable size\nPower wiring material from power meter to motor through switches and starter complete and double earthing material comlete set.\nSubmersible cable of 6 square mm\nearth plate 2'x2'\nearth pipe 3.0m long\nearth chamber cover etc.\nearth strip alluminium, 12mmx3mm\nCharcol\nSalt\nFlexible pipe and conduit pipe\nCaution Plate\n | 1 | Set | |
280 | 282 | Supply of submersible pumping plant of 1500 LPM, 50m head (As per IS:8034) | 1 | Set | |
281 | 283 | Main piping and valves of 150 mm. size with 24 m column assembly. (Sluice valve Confirming to IS:14846-2000 & Reflex Valve Confirming to IS:5312 part-1 having following items\n150 mm dia D/F Reflux Valve as per IS\n150 mm dia D/F Sluice Valve with hand wheel as per IS\n150 mm diz C.I.A/F. Tee as per IS\n150 mm diz C.I.D/F. Bend 90° as per IS\n150 mm dia M.S.D/F pipe 5.4 mm thick 1.5 meter long as per IS.\n150 mm dia M.S.D/F pipe 5.4 mm thick 1 meter long as per IS.\nNecessary nuts, bolts with washers and rubber packing etc.\nEnlarger of required size.\n150 mm size column pipe clamps\n150 mm dia M.S. Flanged column assembly 24 meter, 7.1 mm. thick in app. 3 meter length.\nJointing material rubber packing and nut bolts etc. complete. | 1 | Set | |
282 | 284 | Pressure and depth guages\nPressure guage(0-7) kg. range. Fibig make\nDepth guage(0-400) feet. range. Fibig make\nAirline 6 mm size with socket\nAirline fittings:\nBends, Elbow, Unioins, Stop cocks, Reducers, control cock\nHand air pump\nSunmica Top wooden board. | 1 | Set | |
283 | 285 | Special tools and spanner having following\nPipe wrenches\nD/E Spanner 22/6 mm\nAdjustable wrench 300mm\nScrew Driver\n12x250 mm\n8x250\nPlier 200 mm\nHammer 2 Lbs\n | 1 | Set | |
284 | 286 | Lifting tackle 2 tones/4.5mt Lift | 1 | No. | |
285 | 287 | Misc. Item such as protection ring, kit kat etc. | 1 | Set | |
286 | 288 | Erection of pumping plant. Power wiring and earthing | 1 | Set | |
287 | 289 | Testing & Trial | 1 | Job | |
288 | 290 | One Month watch & ward during the period of installation | 1 | Job | |
289 | 291 | Painting of Pumping Plant | 1 | Job | |
290 | 292 | CONSTRUCTION OF NEW TUBEWELL WITH 300MMX200 MM DIA SIZE T/W\nTransportation of Rig Machine and its T&P\nTransportation of Rig Machine from store to tube well site with clamp equipage. | 50 | km | |
291 | 293 | Carting of rig machine T&P from Bareilly store to site work (x2) | 100 | km | |
292 | 294 | Return trip of empty truck | 100 | km | |
293 | 295 | Handling charges of above materials | 4 | trips | |
294 | 296 | Return trip of rig machine and its T&P from site of work to Bareilly store. | 1 | Job | |
295 | 297 | Transportation of Tubewell Assembly\nCarting of tubewell assembly from store to site of work | 50 | km | |
296 | 298 | Return trip of empty truck | 50 | km | |
297 | 299 | Handling charges | 4 | Sets | |
298 | 300 | Transportation of Compressor\nToeing of compressor unit from Bareilly store to site of work. | 50 | km | |
299 | 301 | Carting of compressor T&P from Bareilly store to site of work. | 50 | km | |
300 | 302 | Return trip of empty truck | 50 | km | |
301 | 303 | Handling charges | 2 | Sets | |
302 | 304 | Return of compressor and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
303 | 305 | Transportation of O.P. Unit\nToeing of O.P. unit from divn. store to site | 50 | km | |
304 | 306 | Carting of O.P. Uniit T&P from Divn. Store to site | 50 | km | |
305 | 307 | Return trip of empty truck | 50 | km | |
306 | 308 | Handling charges | 2 | Sets | |
307 | 309 | Return of above O.P. Unit and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
308 | 310 | Supply of Tubewell Assembly\n300 mm. dia M.S. Housing Pipe | 45 | m | |
309 | 311 | 300x200 mm dia reducer | 1 | No. | |
310 | 312 | 200 mm dia M.S. Plain Pipe | 99 | m | |
311 | 313 | 200 mm dia M.S. Slotted Pipe | 36 | m | |
312 | 314 | 300 mm dia M.S. Tubwell Cap | 1 | No. | |
313 | 315 | 200 mm dia M.S. Bail plug | 1 | No. | |
314 | 316 | 300 mm dia M.S. Clamp | 1 | No. | |
315 | 317 | 300 mm dia M.S. Rings | 7 | Nos. | |
316 | 318 | 200 mm dia M.S. Rings | 25 | Nos. | |
317 | 319 | 200 mm dia Center Guides | 8 | Nos. | |
318 | 320 | M.S. Support (I-Section) 300 mm dia | 1 | No. | |
319 | 321 | PEA-GRAVEL (As per IS:4097)\n1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for tubewell | 80 | m3 | |
320 | 322 | Drilling of bore by rig machine As Per IS:2800(Part I & II):\nErection of RC 600/27 rig machine Camp equipage. | 1 | Set | |
321 | 323 | Drilling of bore by 675 mm dia Bit GL to 50 mt. BGL | 50 | m | |
322 | 324 | Drilling of bore by 550 mm dia bit 50 m BGL to 90 m. BGL | 40 | m | |
323 | 325 | Drilling of bore by 550 mm dia bit 90 m BGL to 120 m. BGL | 30 | m | |
324 | 326 | Drilling of bore by 550 mm dia bit 120 m BGL to 150 m. BGL | 30 | m | |
325 | 327 | Drilling of bore by 550 mm dia bit 150 m BGL to 180 m. BGL | 30 | m | |
326 | 328 | Drilling of bore by 550 mm dia bit 180 m BGL to 200 m. BGL | 20 | m | |
327 | 329 | Dismentling of rig machine a camp Equipage. | 1 | Set | |
328 | 330 | Lowering of tubewell assembly with M.S. rings, Bail Plug, Reducer Including welding:\nLowering of 300 mm dia M.S. Housing pipe from GL to 45 m. BGL | 45 | m | |
329 | 331 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 45 m. BGL to 90 m. BGL | 45 | m | |
330 | 332 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 90 m. BGL to 120 m. BGL | 30 | m | |
331 | 333 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 120 m. BGL to 150 m. BGL | 30 | m | |
332 | 334 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 150 m. BGL to 180 m. BGL | 30 | m | |
333 | 335 | Development of Tubewell by 350 PSI air compressor and cusec O.P. Unit to yield sand free discharge.\nErection of air compressor with its T&P and camp equipage etc. | 1 | Set. | |
334 | 336 | Development and testing of tubewell by air compressor. | 60 | Hrs. | |
335 | 337 | Dismentling of Air Compressor with its T&P, camp equipage. | 1 | Set. | |
336 | 338 | Erection of O.P. Unit with its T&P and camp equipage etc. | 1 | Set. | |
337 | 339 | Development and testing of tube well O.P. Unit to yield sand free discharge. | 100 | Hrs. | |
338 | 340 | Dismentling of O.P. Unit with its T&P, camp equipage | 1 | Set. | |
339 | 341 | Chemical and Bacteriological test (Analysis of water sample) | 2 | Sets. | |
340 | 342 | Vertically test of tube well. | 1 | No. | |
341 | 343 | Making Approach Road for transportation of rig machine | 1 | No. | |
342 | 344 | Bericating of site for safety during construction. | 1 | Set. | |
343 | 345 | Rental of Rig Machine, Compressor and O.P. Unit | 1 | No. | |
344 | 346 | Watch and Ward for Construction Period | 1 | Job | |
345 | 347 | SERVO VOLTAGE STABILIZER\nSupply, installation and Commissioning of automatic servo voltage stabilizer-40KVA (Input Voltage 230V±450V) to Output Voltage 415V± 1% As per IS 9815-1994 | 1 | No. | |
346 | 348 | ELECTRIFICATION OF PUMP HOUSE\nInternal Electrification of pump house. | 1 | No. | |
347 | 349 | CHLORINATING PLANT\nSupply, installation and commissioning of Electronic type chlorinating plant of 6 LPH Capacity | 1 | No. | |
348 | 350 | TRANSMISSION LINE\nSupply and erection of HT transmission line with material comlete in all respect. | 0.4 | km | |
349 | 351 | Supply of 63 KVA transformer including all material required for installation & double pole | 1 | No. | |
350 | 352 | Security money for power connection 21 KW=26 KVA | 26 | KVA | |
351 | 353 | System loading charges | 21 | KW | |
352 | 354 | Energy Meter | 1 | No. | |
353 | 355 | Processing Fee | 1 | Job | |
354 | 356 | PUMPING PLANT\nSwitch gear material complete having following items\nAutomatic Air brake Star Delta starter 25 HP\nMain Switch of 100A capacity\n100 mm dia size ammeter of 0-100amp, 100/5 CTR\n100 mm. dia size voltmeter of 0-500 V.\nSelector switch for voltmeter\nIndicating lamps.\nSingle phasing preventor.\nPower capacitor of suitable size\nPower wiring material from power meter to motor through switches and starter complete and double earthing material comlete set.\nSubmersible cable of 6 square mm\nearth plate 2'x2'\nearth pipe 3.0m long\nearth chamber cover etc.\nearth strip alluminium, 12mmx3mm\nCharcol\nSalt\nFlexible pipe and conduit pipe\nCaution Plate | 1 | Set | |
355 | 357 | Supply of submersible pumping plant of 1500 LPM, 50m head (As per IS:8034) | 1 | Set | |
356 | 358 | Main piping and valves of 150 mm. size with 24 m column assembly. (Sluice valve Confirming to IS:14846-2000 & Reflex Valve Confirming to IS:5312 part-1 having following items\n150 mm dia D/F Reflux Valve as per IS\n150 mm dia D/F Sluice Valve with hand wheel as per IS\n150 mm diz C.I.A/F. Tee as per IS\n150 mm diz C.I.D/F. Bend 90° as per IS\n150 mm dia M.S.D/F pipe 5.4 mm thick 1.5 meter long as per IS.\n150 mm dia M.S.D/F pipe 5.4 mm thick 1 meter long as per IS.\nNecessary nuts, bolts with washers and rubber packing etc.\nEnlarger of required size.\n150 mm size column pipe clamps\n150 mm dia M.S. Flanged column assembly 24 meter, 7.1 mm. thick in app. 3 meter length.\nJointing material rubber packing and nut bolts etc. complete.\n | 1 | Set | |
357 | 359 | Pressure and depth guages\nPressure guage(0-7) kg. range. Fibig make\nDepth guage(0-400) feet. range. Fibig make\nAirline 6 mm size with socket\nAirline fittings:\nBends, Elbow, Unioins, Stop cocks, Reducers, control cock\nHand air pump\nSunmica Top wooden board. | 1 | Set | |
358 | 360 | Special tools and spanner having following\nPipe wrenches\nD/E Spanner 22/6 mm\nAdjustable wrench 300mm\nScrew Driver\n12x250 mm\n8x250\nPlier 200 mm\nHammer 2 Lbs | 1 | Set | |
359 | 361 | Lifting tackle 2 tones/4.5mt Lift | 1 | No. | |
360 | 362 | Misc. Item such as protection ring, kit kat etc. | 1 | Set | |
361 | 363 | Erection of pumping plant. Power wiring and earthing | 1 | Set | |
362 | 364 | Testing & Trial | 1 | Job | |
363 | 365 | One Month watch & ward during the period of installation | 1 | Job | |
364 | 366 | Painting of Pumping Plant | 1 | Job | |
365 | 367 | CONSTRUCTION OF NEW TUBEWELL WITH 300MMX200 MM DIA SIZE T/W\nTransportation of Rig Machine and its T&P\nTransportation of Rig Machine from store to tube well site with clamp equipage. | 50 | km | |
366 | 368 | Carting of rig machine T&P from Bareilly store to site work (x2) | 100 | km | |
367 | 369 | Return trip of empty truck | 100 | km | |
368 | 370 | Handling charges of above materials | 4 | trips | |
369 | 371 | Return trip of rig machine and its T&P from site of work to Bareilly store. | 1 | Job | |
370 | 372 | Transportation of Tubewell Assembly\nCarting of tubewell assembly from store to site of work | 50 | km | |
371 | 373 | Return trip of empty truck | 50 | km | |
372 | 374 | Handling charges | 4 | Sets | |
373 | 375 | Transportation of Compressor\nToeing of compressor unit from Bareilly store to site of work. | 50 | km | |
374 | 376 | Carting of compressor T&P from Bareilly store to site of work. | 50 | km | |
375 | 377 | Return trip of empty truck | 50 | km | |
376 | 378 | Handling charges | 2 | Sets | |
377 | 379 | Return of compressor and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
378 | 380 | Transportation of O.P. Unit\nToeing of O.P. unit from divn. store to site | 50 | km | |
379 | 381 | Carting of O.P. Uniit T&P from Divn. Store to site | 50 | km | |
380 | 382 | Return trip of empty truck | 50 | km | |
381 | 383 | Handling charges | 2 | Sets | |
382 | 384 | Return of above O.P. Unit and connected T&P from site of wrk to Bareilly store. | 1 | Job | |
383 | 385 | Supply of Tubewell Assembly\n300 mm. dia M.S. Housing Pipe | 45 | m | |
384 | 386 | 300x200 mm dia reducer | 1 | No. | |
385 | 387 | 200 mm dia M.S. Plain Pipe | 99 | m | |
386 | 388 | 200 mm dia M.S. Slotted Pipe | 36 | m | |
387 | 389 | 300 mm dia M.S. Tubwell Cap | 1 | No. | |
388 | 390 | 200 mm dia M.S. Bail plug | 1 | No. | |
389 | 391 | 300 mm dia M.S. Clamp | 1 | No. | |
390 | 392 | 300 mm dia M.S. Rings | 7 | Nos. | |
391 | 393 | 200 mm dia M.S. Rings | 25 | Nos. | |
392 | 394 | 200 mm dia Center Guides | 8 | Nos. | |
393 | 395 | M.S. Support (I-Section) 300 mm dia | 1 | No. | |
394 | 396 | PEA-GRAVEL (As per IS:4097)\n1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for tubewell | 80 | m3 | |
395 | 397 | Drilling of bore by rig machine As Per IS:2800(Part I & II):\nErection of RC 600/27 rig machine Camp equipage. | 1 | Set | |
396 | 398 | Drilling of bore by 675 mm dia Bit GL to 45 mt. BGL | 45 | m | |
397 | 399 | Drilling of bore by 550 mm dia bit 45 m BGL to 90 m. BGL | 45 | m | |
398 | 400 | Drilling of bore by 550 mm dia bit 90 m BGL to 120 m. BGL | 30 | m | |
399 | 401 | Drilling of bore by 550 mm dia bit 120 m BGL to 150 m. BGL | 30 | m | |
400 | 402 | Drilling of bore by 550 mm dia bit 150 m BGL to 180 m. BGL | 30 | m | |
401 | 403 | Drilling of bore by 550 mm dia bit 180 m BGL to 200 m. BGL | 20 | m | |
402 | 404 | Dismentling of rig machine a camp Equipage. | 1 | Set | |
403 | 405 | Lowering of tubewell assembly with M.S. rings, Bail Plug, Reducer Including welding:\nLowering of 300 mm dia M.S. Housing pipe from GL to 45 m. BGL | 45 | m | |
404 | 406 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 45 m. BGL to 90 m. BGL | 45 | m | |
405 | 407 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 90 m. BGL to 120 m. BGL | 30 | m | |
406 | 408 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 120 m. BGL to 150 m. BGL | 30 | m | |
407 | 409 | Lowering of 200 mm dia M.S. Plain/Slotted pipe 150 m. BGL to 180 m. BGL | 30 | m | |
408 | 410 | Development of Tubewell by 350 PSI air compressor and cusec O.P. Unit to yield sand free discharge.\nErection of air compressor with its T&P and camp equipage etc. | 1 | Set. | |
409 | 411 | Development and testing of tubewell by air compressor. | 60 | Hrs. | |
410 | 412 | Dismentling of Air Compressor with its T&P, camp equipage. | 1 | Set. | |
411 | 413 | Erection of O.P. Unit with its T&P and camp equipage etc. | 1 | Set. | |
412 | 414 | Development and testing of tube well O.P. Unit to yield sand free discharge. | 100 | Hrs. | |
413 | 415 | Dismentling of O.P. Unit with its T&P, camp equipage | 1 | Set. | |
414 | 416 | Chemical and Bacteriological test (Analysis of water sample) | 2 | Sets. | |
415 | 417 | Vertically test of tube well. | 1 | No. | |
416 | 418 | Making Approach Road for transportation of rig machine | 1 | No. | |
417 | 419 | Bericating of site for safety during construction. | 1 | Set. | |
418 | 420 | Rental of Rig Machine, Compressor and O.P. Unit | 1 | No. | |
419 | 421 | Watch and Ward for Construction Period | 1 | Job | |
420 | 422 | PUMP HOUSE\nSupply of all Materials, labour, T&P and construct pump house cum chloronome as per type drawing. | 5 | No. | |
421 | 423.1 | RISING MAIN AND BYE PASS ARRANGEMENT\nSupply of following sizes of DI K-7 pipe confirming to IS 8329/2500 with modified sockets suitable for rubber gasket joints at store including all taxes \n150 mm DIA DI PIPE Class k-7\nIn Punjabi Colony | 300 | m | |
422 | 423.2 | 100 mm DIA DI PIPE Class k-7\nIn Shyama Charan Gotiya | 100 | m | |
423 | 423.3 | In Noori Nagar | 20 | m | |
424 | 423.4 | In Mohammadpur | 100 | m | |
425 | 423.5 | In Nayi Basti | 500 | m | |
426 | 424 | Supply of D.I. flanged specials confirming to IS:1538 suitable for above D.I. pipe at store including all taxes.\n10% of item no. 1 | 1 | Job | |
427 | 425.1 | Supply of following sizes of C.I., D/F, non-rising spindle type of sluice valves with cap class 10 (working pressure 10 Kg/cm2) confirming to IS: 14846-1500, at store including all taxes.\n150 mm dia | 1 | No. | |
428 | 425.2 | 100 mm dia | 4 | No. | |
429 | 426 | Excavation for pipe line in ordinary soil (loam, clay and sand) with lift upto 1.5 M and lead upto 50 M including refilling, watering and ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 50 M. from the trenches including supply of all materials, labour T&P etc. complete. (SOR Code 2001) | 813.15 | m3 | |
430 | 427.1 | Carting from store to site of work of following type and sizes of pipe, lowering them into the trenches, laying true to alignment & gradiant including cutting & threading of pipes for making up lenghts as required & testing of pipe line etc. With all labour and T&P complete for proper complition of work.\n150 mm DIA DI PIPE Class k-7 | 300 | m | |
431 | 427.2 | 100 mm DIA DI PIPE Class k-7 | 720 | m | |
432 | 428.1 | Carting sluice valves or reflex valves of following sizes, from store to site of works, lowering them into the trenches already prepared and fixing them in position of making flanged joints including supply of all materials such as nuts, bolts, rubber insertion, white lead and testing, all labour and T&P etc. complete for proper complition of work.\n150 mm dia | 1 | No. | |
433 | 428.2 | 100 mm dia | 4 | No. | |
434 | 429 | Supply of all materials, labour T&P etc. and construct chambers as per type design.Sluice valve chamber (masonery type) | 5 | No. | |
435 | 430.1 | Dismentaling of following type of road surface for laying pipe line including sorting out of serviceable materials and disposal of unserviceable materials upto a distance of 50M.\nIn C.C. Road | 300 | sqm | |
436 | 430.2 | In Bituminous road | 500 | sqm | |
437 | 431.1 | Reinstatement of following type of road surface for laying pipe line including sorting out of serviceable materials and disposal of unserviceable materials upto a distance of 50M.\nIn C.C. Road | 300 | sqm | |
438 | 431.2 | In Bituminous road | 500 | sqm | |
439 | 432 | RCC with cement coarse sand and 20 mm guage ballast in proportion of 1:2:4 in thrust block of rising main excluding supply of reinforcement necessary shuttering all labour and T&P etc.complete for proper complition of work. | 4.22 | m3 | |
440 | 433 | Mild steel or iron work in RCC wrought to required shape as necessary including bending for proper completion of work including supply of steel and it's wastage. | 3.3 | Qtl. | |
441 | 434 | Handling charges of pipe @ 1% of item No. 1&2 | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail