Uttar Pradesh Projects Corporation Limited has published Labour Charges For Construction Of Mini Stadium ( Indoor And Outdoor Game ) At Village- Lotana , Block- Purwa District- Unnao. Submission Date for this Tender is 03-02-2020. Foundation Work Tenders in Unnao Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: LABOUR CHARGES FOR CONSTRUCTION OF MINI STADIUM (INDOOR AND OUTDOOR GAME) AT VILLAGE- LOTANA, BLOCK- PURWA DISTRICT- UNNAO | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | BI01010001010000000000000515BI0100001113 | 339 | M³ |
2 | 2 | Labour charges for laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 Stone ballast 40 mm nominal size) including all labour T & P etc, but excluding cost of all material required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. (curring complete) | BI01010001010000000000000515BI0100001114 | 39 | M³ |
3 | 3 | Labour charges for steel reinforcement in R.C.C. Work including cutting, bending, binding and placing for required shape but excluding cost of all steel. | BI01010001010000000000000515BI0100001115 | 21280 | Kg |
4 | 4 | Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Raft Foundation excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001116 | 58 | M³ |
5 | 5 | Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Column excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001117 | 27 | M³ |
6 | 6 | Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Plinth band excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001118 | 47.5 | M³ |
7 | 7 | Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Top band excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001119 | 16 | M³ |
8 | 8 | Labour charges for first Class brick work in 1:6 cement and coarse sand of 2.25 F.M. mortar in Super structure and plinth including all labour, tools and plants etc. required for proper completion of the work. (1:6 cement & coarse sand) (curring complete) | BI01010001010000000000000515BI0100001120 | 32 | M³ |
9 | 9 | Labour charges for first Class brick work in 1:3 cement and coarse sand of 2.25 F.M. mortar in Super structure including all labour, tools and plants etc. required for proper completion of the work. (1:3 cement & coarse sand) (curring complete) | BI01010001010000000000000515BI0100001121 | 95 | M³ |
10 | 10 | Labour charges for 12mm thick plaster with proportion of 1:6 cement & approved coarse sand with scaffolding complete in all respect. | BI01010001010000000000000515BI0100001122 | 2415 | M² |
11 | 11 | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surfaceto prepare the surface even and smooth complete. | BI01010001010000000000000515BI0100001123 | 2520 | Sqm. |
12 | 12 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) | BI01010001010000000000000515BI0100001124 | 2415 | Sqm. |
13 | 13 | Making drip course/groove in plastered surface or moulding to RCC work complete in all respect. | BI01010001010000000000000515BI0100001125 | 3020 | RM |
14 | 14 | GST extra as applicable | BI01010001010000000000000515BI0100001126 |