Dismantling , Shifting And Extension Of Lt Over Head Line In Central Part Of The Mine At Quarry Of Gevra Project On As And When Required Basis For A Period Of One Year . , Gevra Project-Chhattisgarh

South Eastern Coalfields Limited-SECL has published Dismantling , Shifting And Extension Of Lt Over Head Line In Central Part Of The Mine At Quarry Of Gevra Project On As And When Required Basis For A Period Of One Year . . Submission Date for this Tender is 11-02-2020. Overhead Line Tenders in Gevra Project Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

23380011
Dismantling , Shifting And Extension Of Lt Over Head Line In Central Part Of The Mine At Quarry Of Gevra Project On As And When Required Basis For A Period Of One Year .
Open Tender
Indian
Chhattisgarh
Gevra Project
11-02-2020

Tender Details

Dismantling , Shifting And Extension Of Lt Over Head Line In Central Part Of The Mine At Quarry Of Gevra Project On As And When Required Basis For A Period Of One Year .

Key Value

Document Fees
Refer document
EMD
INR 17100.0 /-
Tender Value
INR 13.64 Lakhs /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Erection of metallic pole 10.00 meter and upto 13 meter without cement concrete foundation including excavation and refilling etc with boulder / stone available at site as required on the instruction of Engr. Inc 13 280 Nos.
2 2 Erection of stay complete (galvanized) in cement concrete 0.2 Cu. M per stay 1:3:6 (1 cement :3 coarse sand : 6 graded stone) foundation including excavation and refilling etc as required on the instruction of Engr I/C. 14 120 Nos.
3 3 Erection of angle /channel iron cross arm on wood /RCC /PCC / steel tubular/ rail pole etc as required (including MS nuts and bolts) 15 120 Nos.
4 4 Erection of double pole 3 wire cross arm/other accessories for over head lines as required (including nuts and bolts) 16 80 Sets
5 5 Erection of ACSR rabbit conductor including binding etc. as required (Single wire per km) 17 12 Km
6 6 Erection of GI wire no 8 SWG including binding etc as required. 18 6 Km
7 7 Dismantling of over head line : a) Dismantling and lowering of conductors, insulators,brackets etc b) Uprooting of poles and transporting it to the road side c) Transporation of materials other than pole to road side (brackets,insulators,clamps and conductors) d) Loading of materials at the road side and unloading the same as per the instruction of I/c 19 300 Nos.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail