}

Erection Of Intermediate Towers (P-Type) Each Between Loc No. 83-84 And Loc No.84-85 For Improvement Of Ground Clearance Of 132 Kandi-Sadasivapet Sc/Sc Line In Yeddumailaram Division (Electrical And Civil Portion)., SANGAREDDY-Telangana

Transmission Corporation of Telangana Limited has published Erection Of Intermediate Towers (P-Type) Each Between Loc No. 83-84 And Loc No.84-85 For Improvement Of Ground Clearance Of 132 Kandi-Sadasivapet Sc/Sc Line In Yeddumailaram Division (Electrical And Civil Portion).. Submission Date for this Tender is 24-02-2020. Transmission Tower Tenders in SANGAREDDY Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

23375864
Erection Of Intermediate Towers (P-Type) Each Between Loc No. 83-84 And Loc No.84-85 For Improvement Of Ground Clearance Of 132 Kandi-Sadasivapet Sc/Sc Line In Yeddumailaram Division (Electrical And Civil Portion).
Open Tender
Indian
Telangana
SANGAREDDY
24-02-2020

Tender Details

Erection Of Intermediate Towers (P-Type) Each Between Loc No. 83-84 And Loc No.84-85 For Improvement Of Ground Clearance Of 132 Kandi-Sadasivapet Sc/Sc Line In Yeddumailaram Division (Electrical And Civil Portion).

Key Value

Document Fees
Refer document
EMD
INR 14592.0 /-
Tender Value
INR 7.29 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Erection of Intermediate Towers (P Type) Not Applicable 1.00 No 111256.33 111256.33
GST @ 18% on total value of work items
2 Erection of Intermediate Towers (P Type) Not Applicable 1.00 No 250.60 250.60
Corpus Fund@0.1% on civil portion
3 Erection of Intermediate Towers (P Type) Not Applicable 20.00 Cum 7797.47 155949.40
PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc., complete
4 Erection of Intermediate Towers (P Type) Not Applicable 5.00 Cum 4900.56 24502.80
Laying of concrete (1:4:8) mix using 40mm HBG Machine crushed metal conforming to IS 383 for all types of foundations including cost & conveyance of all materials, dewatering arrangements of the pits before and during the process of laying concrete, labour charges, water lead, tools and tackles, all leads & lifts etc., complete for finished item of work as directed by the Engineer in charge. (IS-456)
5 Erection of Intermediate Towers (P Type) Not Applicable 6.00 Cum 2930.18 17581.08
Sand filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials,watering and ramming,tools & tackles,all labour charges,all leads & lifts etc., complete for finished item of work as per the directions of the Engineer-in-charge.
6 Erection of Intermediate Towers (P Type) Not Applicable 10.00 Cum 893.91 8939.10
Hard rock (requiring blasting) ( including chiesling, wedging & barring where ever required)The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge
7 Erection of Intermediate Towers (P Type) Not Applicable 10.00 Cum 285.98 2859.80
Excavation in HDR,soft rock,F&F requiring blasting where ever necessary.The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.
8 Erection of Intermediate Towers (P Type) Not Applicable 160.00 Cum 254.78 40764.80
CIVIL PORTION:Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth and consolidation in up to 0.15 m layer and constructing of platforms 150mm height around foundations utilizing the excavated earth etc. complete as directed by Er-In - Charge.
9 Erection of Intermediate Towers (P Type) Not Applicable 1.00 LS 96.22 96.22
Loading and Unloading charges for Vibration dampers for ACSR Panther,Mid span compression joints,Phase Plates,Number Plates, Danger Plate and Repair Sleeves.
10 Erection of Intermediate Towers (P Type) Not Applicable 1.00 LS 158.48 158.48
Loading and Unloading charges for Suspension Hardware for ACSR Panther (3) and Earthwire (2)
11 Erection of Intermediate Towers (P Type) Not Applicable 1.00 LS 176.66 176.66
Transportation,Loading and Unloading charges for 132kV,70KN SRC Insulators
12 Erection of Intermediate Towers (P Type) Not Applicable 6.39 MT 1068.44 6832.67
Transportation,Loading and Unloading charges for G.I tower parts,Nuts & Bolts
13 Erection of Intermediate Towers (P Type) Not Applicable 2.50 KM 7307.10 18267.75
Dismantliing of Earth wire under Shut down conditions
14 Erection of Intermediate Towers (P Type) Not Applicable 2.50 KM 36518.79 91296.98
Dismantling of 3 nos Panther conductors under Shutdown (0.75 of Stringing rate )
15 Erection of Intermediate Towers (P Type) Not Applicable 1.00 Per Conductor 2153.25 2153.25
Dismantling and restrining of 11kV conductor (All types of conductors) for crossing of 11kV line during stringing of EHT Lines
16 Erection of Intermediate Towers (P Type) Not Applicable 550.00 Each 16.93 9311.50
Half-round welding of bolts & nuts of towers in the section between ground level and bottom cross arm level. including all bolts connecting the bracings at the bottom cross arm level and painting the welded portion with one coat of zinc rich paint.
17 Erection of Intermediate Towers (P Type) Not Applicable 2.50 KM 9742.80 24357.00
Fixing hardware, stretching the wire, paving out earth wire, jointing, tensioning, stringing, clamping, jumpering etc., complete of 7/3.15mm high tensile galvanised steel Earth wire.
18 Erection of Intermediate Towers (P Type) Not Applicable 2.50 KM 48691.79 121729.48
Stringing of Power Conductor : Hoisting of insulators with hardware, stretching the conductors, rough sagging, jointing , tensioning , clamping , jumpering fixing preformed armour rods, vibration dampers etc., complete of 3 Nos.,ACSR Panther Conductor
19 Erection of Intermediate Towers (P Type) Not Applicable 2.00 Loc 4129.85 8259.70
Earthing of towers including cost of Excavation , back filling , including cost of nominal dia of 25 mm 2.5 mm thick and 3.06 mts long inside the pit with 50X6 mm GI flat 4.05 m long and back fill the pit with BH coke including cost of GI pipes & BH coke and measuring tower footing resistance.
20 Erection of Intermediate Towers (P Type) Not Applicable 5.62 MT 7137.32 40111.74
Erection of all types of tower including all types of extension upto 12 mtrs. in full towers complete with all accessories such as step bolts, number plates, danger boards, phase plate, bird guards, anti- climbing devices etc., wherever necessary, including punching the bolts after full tightening including transportation to site, loadng & unloading charges.
21 Erection of Intermediate Towers (P Type) Not Applicable 2.00 Loc 7188.09 14376.18
Setting of stubs with stub-setting template 132 KV P, R & S-Type Towers
22 Erection of Intermediate Towers (P Type) Not Applicable 1.50 KM 4027.23 6040.85
Check Survey, peg marking the tower positions on ground,conforming to the approved Profile and tower schedules using GPS, Total stations, Digital theodolites etc."the rate is also applicable for re-check survey if any done due to ROW problems"
23 Erection of Intermediate Towers (P Type) Not Applicable 1.50 KM 12558.80 18838.20
Conducting detailed survey by taking the levels along the route to a corridor of 15 mtrs. width on either side of alignment, at every 20 mtrs. interval and wherever there is a steep increase/decrease in ground profile duly indicating the chainage between angle points, river crossings, railway crossing and major highway crossings and plotting the profiles and preparation of vicinity maps to the standard scales. The survey includes clearing of bushes, branches of tree, crops and shrubs wherever encountered for detailed survey for viewing, for fixing anchor towers and also taking levels etc. required for conducting detailed surveys. This work can be done with Theodolite or with GPS equip .Tower schedules as per tower spotting requirements plotted on reproducible tracing of profile original with one extra copy shall be given . Towers Schedules should be submitted with GPS Co-ordinates. Identification of wind zones, collection of Hydraulic data of rivers / drains from competent authority.
24 Erection of Intermediate Towers (P Type) Not Applicable 1.50 KM 3658.05 5487.08
ELECTRICAL PORTION: Conducting reconnoitery and preliminary survey along bee line with three alternative routes and furnishing report for selecting the best proposal for approval, including cost & conveyance of all materials, hire charges of equipment, tools and plant, preparation of drawings and reports, labour charges, complete for finished item of work as per the directions of Engineer-in-charge at site.(With Theodolite / With GPS equipment ( As per Clause 4.9 of survey) /With total station equipment).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail