Public Works Department-PWD has published Tender For Investigation Work ( Additional ) For Construction Of Karuvattakkadave Bridge Across Poonoor River In Kozhikode District . Investigation Work. Submission Date for this Tender is 01-02-2020. Bridge Work Tenders in Thamarassery Kerala. Bidders can get complete Tender details and download the document.
Work Name:Investigation work (Additional) for Construction of Karuvattakkadave bridge across Poonoor river in Kozhikkode District. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Investigation for Bridge | BI01010001010000000000000515BI0100001113 | ||
2 | 1.01 | 56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring | BI01010001010000000000000515BI0100001114 | 1 | set |
3 | 1.02 | 56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring. | BI01010001010000000000000515BI0100001115 | 5 | Nos hole |
4 | 1.03 | 56.3.a.1 : Boring with rotary power drilling equipment's in\t\t\t\t\t\t\t\nall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil. | BI01010001010000000000000515BI0100001116 | 50 | metre |
5 | 1.04 | 56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river. | BI01010001010000000000000515BI0100001117 | 15 | metre |
6 | 1.05 | 56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | BI01010001010000000000000515BI0100001118 | 25 | each |
7 | 1.06 | 56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes. | BI01010001010000000000000515BI0100001119 | 1 | set |
8 | 1.07 | 56.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers. | BI01010001010000000000000515BI0100001120 | 1 | set |
9 | 1.08 | 56.14.a : Cross section details:- River.Cross section details:- River. | BI01010001010000000000000515BI0100001121 | 270 | sqm |
10 | 1.09 | 56.15.a : Hydraulic Velocity Calculation:- River.Hydraulic Velocity Calculation:- River. | BI01010001010000000000000515BI0100001122 | 1 | set |