}

Outsourcing Of Services For Operation Of Sewage Treatment Plant, Central Ac Plant For Acm1, Acm 2 At Fad Depot, Central Ac Plant Nbc Shed At Abod, Fire Fighting At Veh Coy And Swimming Pool Under Ge Narangi, GE NARANGI-Assam

Military Engineer Services-MES has published Outsourcing Of Services For Operation Of Sewage Treatment Plant, Central Ac Plant For Acm1, Acm 2 At Fad Depot, Central Ac Plant Nbc Shed At Abod, Fire Fighting At Veh Coy And Swimming Pool Under Ge Narangi. Submission Date for this Tender is 12-02-2020. Air Conditioner Tenders in GE NARANGI Assam. Bidders can get complete Tender details and download the document.




Tender Notice

23297242
Corrigendum : Outsourcing Of Services For Operation Of Sewage Treatment Plant, Central Ac Plant For Acm1, Acm 2 At Fad Depot, Central Ac Plant Nbc Shed At Abod, Fire Fighting At Veh Coy And Swimming Pool Under Ge Narangi
Open Tender
Indian
Assam
GE NARANGI
12-02-2020

Tender Details

Outsourcing Of Services For Operation Of Sewage Treatment Plant, Central Ac Plant For Acm1, Acm 2 At Fad Depot, Central Ac Plant Nbc Shed At Abod, Fire Fighting At Veh Coy And Swimming Pool Under Ge Narangi

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 08-Feb-2020 Date Amendment No 1 Date 12-02-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 94000.0 /-
Tender Value
INR 47 Lakhs /-

BOQ Items

Name of Work :OUTSOURCING OF SERVICES FOR OPERATION OF SEWAGE TREATMENT PLANT, CENTRAL AC PLANT FOR ACM1, ACM 2 AT FAD DEPOT, CENTRAL AC PLANT NBC SHED AT ABOD, FIRE FIGHTING AT VEH COY AND SWIMMING POOL UNDER GE NARANGI.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 SCHEDULE 'A' PART-I
2 1.1 Outsourcing of services for continuous running of Sewage Treatment Plant by logging of running records, minor day to day repairs, upkeep of installation 01 x FGM (Semi Skilled labour) each shift consisting of STP, pumping sets, DG Sets, Air compressor, chlorination plant, Sluice valve and reporting the occurences at the installation on all working days inlcuding sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :-\n1st Shift :- 0600 Hrs to 1400 Hrs\n2nd Shift :- 1400 Hrs to 2200 Hrs \nlocated at the following installation for a period of 337 Days 674 Per Shift of 8 Hrs
3 2 Outsourcing of services for continuous running of Sewage Treatment Plant by assisting in unkeep of installation 02 x Helper / Mazdoor each shift, cleaning of installation premises consisting of STP, pumping sets, DG sets, Air compessor, chlorination plant, Sluice valves on all working daysincluding sundays & holidays complete all as directed.The outsourcing shall be measured shift wise in sequence as follows :-\n1st Shift :- 0600 Hrs to 1400 Hrs\n2nd Shift :- 1400 Hrs to 2200 Hrs\nlocated at the following installation for a period of 337 Days 674 Per Shift of 8 Hrs
4 2.9 Outsourcing of services for continuous running of Central AC Plant for ACM 1 & ACM 2 at FAD including logging of running records, minor day to day repairs, upkeep of installation 01 x Refrigerator Mech (Semi Skilled labour) each shift and reporting of occurences at the installation consisting of 3X25.1 capacity chiller expansion type with all connected accessories such as compressors, AHU's, pumping sets, cooling towers, panel board and DG sets etc. on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- \n1st Shift :- 0600 Hrs to 1400 Hrs\n2nd Shift :- 1400 Hrs to 2200 Hrs \n3rd Shift : 2200 Hrs to 0600 Hrs\nlocated at the following installation for a period of 337 Days 1011 Per Shift of 8 Hrs
5 4 Outsourcing of services for continuous running of Central AC Plant for ACM1 & ACM 2 at FAD by assisting in upkeep of installation 01 x Helper / Mazdoor labour each shift, cleaning of installation consisting of 3X25.1 capacity chiller expansion type with all connected accessories such as compressors, AHU's, pumping sets, cooling towers, panel board and DG sets Etc by keeping clean installation premises on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows: -\nShift timing will to be directed by Engr-in-Charge as per site requirement\nlocated at the following installation for a period of 337 Days 337 Per Shift of 8 Hrs
6 5 Outsourcing of services for continuous running of Central AC Plant NBC Shed at Advance Base Ordanmce Depot including logging of running records, minor day to day repairs, upkeep of installation 01 x Refrigerator Mech (semi Skilled labour) each shift and reporting of occurences at the installation consisting of 3 x 52 TR capacity direct expansion type with all connected accessories such as Compressors, AHU’s, pumping sets, cooling towers, panel board and DG set etc on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- \n1st Shift :- 0600 Hrs to 1400 Hrs\n2nd Shift :- 1400 Hrs to 2200 Hrs \n3rd Shift : 2200 Hrs to 0600 Hrs\nlocated at the following installation for a period of 337 Days 1011 Per Shift of 8 Hrs
7 6 Outsourcing of services for continuous running of Central AC Plant NBC Shed at Advacne BAse Ordance Depot by assisting in upkeep of installation 01 x Helper / Mazdoor each shift and cleaning of installation consisting of 3 x 52 TR capacity direct expansion type with all connected accessories such as Compressors, AHU’s, pumping sets, cooling towers, panel board and DG set etc by cleaning installation premises on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- \nShift timings will be directed by Engr-in-Charge as per site requirement\nlocated at the following installation for a period of 337 Days \n 337 Per Shift of 8 Hrs
8 7 Outsourcing of services for continuous running of fire fighting installation 01 x FGM ( Semi Skilled labour ) each shift and Stand by DG Set at Veh Coy including logging of running records, minor day to day repairs, upkeep of the installation and reporting the occurences at the installation on all working days including Sundays and Holidays. The outsourcing shall be measured shift wise in sequence as follows::- \n1st Shift :- 0600 Hrs to 1400 Hrs \n2nd Shift :- 1400 Hrs to 2200 Hrs \n3rd Shift : 2200 Hrs to 0600 Hrs\nlocated at the following installation for a period of 337 Days 1011 Per Shift of 8 Hrs
9 8 Outsourcing of services for continuous running of Swimming Pool (size 50mx21m) and diving pool including logging of running records, minor day to day repairs, upkeep of installation 01 x FGM ( Semi Skilled labour) each shift consisting of pump sets, chemical dozing plants pressure filter, suction swiper and other connected machineries and reporting the occurences at the installation on all working days including Sundays and Holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows:-\n1st Shift :- 0600 Hrs to 1400 Hrs \n2nd Shift :- 1400 Hrs to 2200 Hrs\nlocated at the following installation for a period of 275 Days \n(02 FGM per day) 550 Per Shift of 8 Hrs
10 9 Note:- (i) Staff employed by the contractor shall carry out daily carefully cleaning, greasing of pumps, motors, panel boards, DG sets and internal portion of pump house building, outdoor panel boards and maintain pump house in presentable condition all time all as specified and directed.\n(ii) The contractor shall carry out routine check and maintain check sheet daily/weekly/monthly and upkeep the installation, rectify normal troubleshooting, replacement of gland packing of pumps, motors and sluice valve in pump houses and delivery valves of overhead tank and minor parts like nut, bolts, washers, coupling rubber, star packing etc.\n(iii) Contractor/ Rep of Contractor will maintain log sheet daily and submit to department duly completed along with attendance sheet and payment register.\n(iv) Contractor shall submit the requsite certificates and experience before commencement of work all as specified and directed.\n(v) The rate of petty stores i.e nut bolts, washer, coupling rubber, star packing, gland rope, grease are included in above quoted rate.\n(vi) No T&P will be issued by the department for doing the above work, it shall be arranged and provided by the contractor like PH testing kit, chlorine test kit, tubidity test kit, pipe wrench, screw driver, sluice valve opening/ closing kit, cutter plier, digging tools etc at his own cost basis.\n(vii) The contractor shall provide a proper uniform for the tradesmen which will be specified/ directed by Engr-in-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail