Northern Coalfields Limited-NCL has published Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Installation , Testing , Trial Run And Commissioning Of Sewage Treatment Plant 1 . 5 Mld On Turnkey Basis Including Operation And Maintenance Of Plant For Four Yea. Submission Date for this Tender is 29-01-2020. Sewage Treatment Plant Tenders in Khadia Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | SURVEY, SOIL TESTING & DESIGN ENGINEERING COST | |||
2 | 1.1 | Detailed survey of the area within battery limit and submission of work | 1 | LS (Complete work as per tender document) | |
3 | 1.2 | Sub-soil exploration, field & laboratory testing of samples and submission of report | 1 | LS (Complete work as per tender document) | |
4 | 1.3 | Design Engineering cost for GA and detailed engineering design and drawing of all civil and structural works in the system | 1 | LS (Complete work as per tender document) | |
5 | 2 | PRICE BREAKUP FOR CIVIL AND STRUCTURAL WORK | |||
6 | 2.1 | CIVIL WORK INCLUDING SITE DEVELOPMENT, ALL MATERIALS, LABOUR ETC. | |||
7 | 2.11 | All Civil and Structural work including Developmental work and infrastructure | 1 | LS (Complete as per scope of work) | |
8 | 3 | PRICE BREAKUP OF PLANT AND MACHINERY | |||
9 | 3.1 | SUPPLY | |||
10 | 3.11 | MECHANICAL SYSTEM | |||
11 | 3.111 | Mechanical system (Pumps, motors, pipes, fittings etc.) | 1 | LS (Complete as per scope of work) | |
12 | 3.112 | Mechanical system (Process equipment) | 1 | LS (Complete as per scope of work) | |
13 | 3.12 | ELECTRICAL SYSTEM | |||
14 | 3.121 | Total Electrical System | 1 | LS (Complete as per scope of work) | |
15 | 4 | ERECTION, INSTALLATION AND COMMISSIONING OF PLANT AND MACHINERY | |||
16 | 4.1 | Design Engineering cost for mechanical and electrical systems | 1 | LS (Complete as per scope of work) | |
17 | 4.2 | Erection, installation and commissioning of all plant and machineries of mechanical and electrical systems | 1 | LS (Complete as per scope of work) | |
18 | 5 | OPERATION & MAINTENANCE COST FOR DEFECT LIABILITY PERIOD | |||
19 | 5.1 | Cost of maintenance of all plant and machinery during defect liability period, all work as per requirement but excluding the cost of spares as indicated at item no. 5.2 below | 1 | LS (Complete as per scope of work) | |
20 | 5.2 | Cost of all spares for maintenance of all plant and machineries during defect liability period | 1 | LS (Complete as per scope of work) | |
21 | 5.3 | Cost of operation of all plant and machinery during defect liability period, all work as per requirement but excluding the cost of consumables as indicated at item no. 5.4 below | 1 | LS (Complete as per scope of work) | |
22 | 5.4 | Cost of all consumables for operation of all plant and machineries during defect liability period | 1 | LS (Complete as per scope of work) | |
23 | 6 | TRAINING OF OPERATION AND MAINTENANCE STAFF | |||
24 | 6.1 | Providing training to operation and maintenance staff of the employer | 1 | LS (Complete as per scope of work) | |
25 | 7 | Total impact of GST for the purpose of CTC | 1 | Nos |