Tender For Grading Of Runway Shoulders And Widening Of Monsoon Drains At Af Station Ambala Under Ge Air Force Ambala, GE AF AMBALA-Haryana

Military Engineer Services-MES has published Tender For Grading Of Runway Shoulders And Widening Of Monsoon Drains At Af Station Ambala Under Ge Air Force Ambala. Submission Date for this Tender is 18-02-2020. Drainage Tenders in GE AF AMBALA Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

22990436
Corrigendum : Tender For Grading Of Runway Shoulders And Widening Of Monsoon Drains At Af Station Ambala Under Ge Air Force Ambala
Open Tender
Indian
Haryana
GE AF AMBALA
18-02-2020

Tender Details

Tender For Grading Of Runway Shoulders And Widening Of Monsoon Drains At Af Station Ambala Under Ge Air Force Ambala

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 08-Jan-2020 Date Extended Date 18-01-2020
2 11-Jan-2020 Date Extended 1 Date 27-01-2020
3 20-Jan-2020 Date Extended 2 Date 08-02-2020
4 03-Feb-2020 Date extend Date 18-02-2020

Key Value

Document Fees
INR 1000 /-
EMD
INR 130000.0 /-
Tender Value
INR 70 Lakhs /-

BOQ Items

NAME OF WORK : GRADING OF RUNWAY SHOULDERS AND WIDENING OF MONSOON DRAINS AT AF STATION AMBALA UNDER GE AIR FORCE AMBALA
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Dismantling of brick work built in cement mortar including all quoins, pillars etc but excluding ashlar facings, dressed stone work and precast articles and rubbish off the premises to a distance not exceeding 500 mtr complete all as specified and as directed. Item1 362 CUM
2 2 Demolition of plain cement concrete,un-reinforced, in ground floor and paving not exceeding 15 cm thick below or above ground floor and rubbish off the premises to a distance not exceeding 500 mtr complete all as specified and directed. Item2 91 CUM
3 3 Surface excavation n.exc. 30 cm deep and averaging 15 centimetre deep and getting out in soft/ loose soil including removing to a distance n exc 500 m and making good the surface complete all as specified and as directed. Item3 89970 SQM
4 4 Excavation in trenches not exc 1.5m wide and not exc 1.5m in depth for foundation etc or for walls, shafts or for laying SWR pipe etc and getting out, in soft/loose soil complete all as directed and as directed. Item4 246 CUM
5 5 Excavation in trenches not exc 1.5m wide and exc 1.5m in depth but not exc 3.0 m in depth for foundation etc or for walls, shafts or for laying SWR pipe etc and getting out, in soft/loose soil complete all as directed and as directed. Item5 565 CUM
6 6 Material and labour for PCC 1:4:8, type D-2 using 40 mm graded mechanically crushed stone aggregates as in foundation,mass concrete & filling complete all as specified and as directed. Item6 180 CUM
7 7 Material and labour for PCC 1:2:4 type B1 using 20 mm graded mechanically crushed stone aggregates as in surface channels and drains complete all as specified and as directed. Item7 60 CUM
8 8 Material and labour for PCC 1:2:4 type B-1 using 20mm graded mechanically crushed stone aggregate as in copings, kneelers, apex stones, bed plates, kerbs not provided for, weathering, slightly rounded for chamfered angles and throating, including necessary form work complete all as specified and as directed. Item8 16 CUM
9 9 Extra for forming fair finished drain or channel 30cm inner girth in cement concrete using extra cement, including forms, moulds, mitred/ stopped ends etc complete all as specified and as directed. Item9 700 RM
10 10 Add or deduct for each 25mm girth or part thereof over or under 30cm inner girth in cement concrete using extra cement including forms/moulds, mitred/stopped end etc complete all as specified and as directed. (For adjustment only) Item10 1 RM
11 11 Material and labour for Brick work with sub class B bricks of old size, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:6 complete all as specified and as directed. Item11 346 CUM
12 12 Material and labour for Brick work straight or curved on plan exc 6 m mean radius, built in cement mortar 1:6 using old bricks retrieved from srl No 01 here-in-before after cleaning and washing the old bricks complete all as specified and as directed. Item12 231 CUM
13 13 Material and Labour for flush pointing to brick walls in cement mortar 1:3 including raking out joints complete all as specified and as directed.. Item13 234 PER 10 SQM
14 14 Forming embankment /earth spreading in runway shoulders including\nraising or lowering earth,spreading in layers n exc. 30 cm thick,watering, & well ramming to obtain maximum dry density at optimum moisture content and finishing to required size, shape etc not exc 1.5 mtr high from the base including rough excavation of earth from a distance exc 1.5 KM but not exc 5.0 KM outside MOD premises, from the sources as approved (duly approved by GE) including loading/unloading and transportation upto the site of work complete all as specified and as directed. \nNotes:- (i) Quoted rates deemed to be include for royality/octroi charges levied by central/state authorities for earth mining and the documentry evidence thereof shall be submitted.\n(ii) The quantum of earth work involved shall be worked out by levelling method of surveying. \n(iii) Compaction of earth filling shall be carried out under optimum moisture conditions with standard proctor density not less than 95 percent of the density obtained in the laboratory by proctor method and a systematic record of these tests shall be maintained.\n(iv) Each layer shall be compacted by rolling with 08 to 10 tonnes power road roller and sheep foot roller, if required.\n(v) Source /location of borrow pits and earth reqd shall be approved by GE in writing.\n(vi) Measurements shall be those of the borrow pits,trenches, etc. from which the material is obtained and If this is found difficult or impracticable, the measurements of the finished embankment, traverse of earth filling shall be taken after consolidation and 10% deducted to allow for increase in bulk after excavation. \n Item14 400 CUM
15 15 Forming embankment /earth spreading in runway shoulders including\nraising or lowering earth,spreading in layers n exc. 30 cm thick,watering, & well ramming to obtain maximum dry density at optimum moisture content and finishing to required size, shape etc not exc 1.5 mtr high from the base using earth obtained from srl No 3,4 & 5 here-in-before (duly approved by GE) including loading/unloading and transportation upto the site of work complete all as specified and as directed. \nNotes:- (i) 60 % quantity of approved earth has been considered to be reused in the work obtained from srl No 3 and to ascertained the exact quantity, a BOO shall be conveyed by the Accepting officer during execution of work. \n(ii) Compaction of earth filling shall be carried out under optimum moisture conditions with standard proctor density not less than 95 percent of the density obtained in the laboratory by proctor method and a systematic record of these tests shall be maintained.\n(iii) Each layer shall be compacted by rolling with 08 to 10 tonnes power road roller and sheep foot roller, if required.\n(iv) Measurements from which the material is obtained, found difficult or impracticable, the measurements of the finished embankment, traverse of earth filling shall be taken after consolidation and 10% deducted to allow for increase in bulk after excavation. \n\n Item15 8910 CUM
16 16 Deduct total amount of Credit from BOQ Rs 52400.00
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail