Pune Metropolitan Regional Development Authority-PMRDA has published Conversion Of Existing 220 Kv Oh Lines To Ug Cable Infringing The Metro Rail Alignment Of Pmr 3 Project Which Includes Engg , Supply , Erection , Testing , Commissioning Of The Works And , Dismantling Of Unutilised Towers And Handing Over Of The Work. Submission Date for this Tender is 22-04-2020. Transmission Tower Tenders in Hinjwadi Phase-I, Pune Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 14-Jan-2020 | Date Corrigendum | Date | 27-01-2020 |
2 | 17-Jan-2020 | Date Corrigendum 2 | Date | 04-02-2020 |
3 | 24-Jan-2020 | Date Corrigendum 4 | Date | 20-02-2020 |
4 | 10-Feb-2020 | Date Corrigendum 4. | Date | 04-03-2020 |
5 | 25-Feb-2020 | Date Corrigendum 5 | Date | 23-03-2020 |
6 | 09-Mar-2020 | Date Corrigendum 6 | Date | 08-04-2020 |
7 | 23-Mar-2020 | Date Extension | Date | 22-04-2020 |
Name of Work: CONVERSION OF EXISTING 220 KV OVERHEAD LINES TO UNDERGROUND CABLE INFRINGING THE METRO RAIL ALIGNMENT OF PUNE METRO LINE 3 PROJECT WHICH INCLUDES ENGINEERING, SUPPLY, ERECTION, TESTING, COMMISSIONING OF THE WORKS AND, DISMANTLING OF UNUTILISED TOWERS AND HANDING OVER OF THE WORKS. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | A1) Supply 220 kV grade,XLPE, Single core,1000 sq mm, Copper cable | item1 | 33.8 | KM |
2 | 2 | Outdoor type cable end termination suitable for 220 KV Single core, 1000 Sqmm Cable along with supply of supporting Terminal structure for CTT tower | item2 | 24 | Nos |
3 | 3 | Indoor type cable end termination suitable for 220 KV, single Core,1000 Sq.mm Cable with Terminal Structure in GIS S/Stn | item3 | 1 | Nos |
4 | 4 | Normal Straight through joints suitable for 220 KV, single Core,1000 sq mm cable | item4 | 24 | Nos |
5 | 5 | Insulated Joints suitable for 220 kV Single Core 1000 sq mm Cable | item5 | 66 | Nos |
6 | 6 | Single Phase Link Box along with supply of Sheath Bonding cable for earthing along with connection to joints & incuding supply of copper rods for earthing work 2 nos of 1.5 mtr as per site requirement | item6 | 24 | Nos |
7 | 7 | Three Phase Link Box along with supply of Sheath Bonding cable for earthing along with connection to joints & incuding supply of copper rods for earthing work 2 nos of 1.5 mtr as per site requirement | item7 | 30 | Nos |
8 | 8 | Supply of HDPE Pipes for road, nala, rail xing etc. (180 dia ) : | item8 | 4800 | Mtr |
9 | 9 | Copper road 12 mm dia rod * 1.5 mtr length for earthing (2 Nos per ckt or per joint bay) | item9 | 108 | Nos |
10 | 10 | Fiber Optic cable 48 Fiber Unarmored cable along with HDPE Duct (including pipe joints), with MUX/Necessary constructional equipment and with end termination to be taken up by the Bidder as per the site requirement | item10 | 5.5 | KM |
11 | 11 | 220 KV Lightning Arrester along with supporting structure | item11 | 24 | Nos |
12 | 12 | Supply of 220 kV CTT tower material : 3 Nos Galvanised super structure along with tower accessories, extensions etc. | item13 | 85.4 | MT |
13 | 13 | Supply of galvanised Nut Bolts for 220 kV CTT tower material : 2 Nos | item14 | 5.3 | MT |
14 | 14 | Supply of DTN for 0.4 ACSR conductor | item15 | 12 | Set |
15 | 15 | b) Installation hardware set for 48 fibre OPGW fibre optic cabling including all cable fittings and accessories except joint box | item16 | 2 | Set per KM |
16 | 16 | OPGW Joint box(48 fibre) | 2 | Nos | |
17 | 17 | Supply of 0.4 ACSR vibration dampers | 12 | Nos | |
18 | 18 | Supply of 120 KN Disc Insulators | 360 | Nos | |
19 | 19.1 | Supply of tower accessories a. Danger board | 2 | Nos | |
20 | 19.2 | b. Number plate | 2 | Nos | |
21 | 19.3 | c. Phase plates of RYB | 2 | Set | |
22 | 19.4 | b. Ckt plates of C1 & C2 | 4 | Set | |
23 | 19.5 | d. Anticlimbing devices | 2 | Nos | |
24 | 20 | A2) Supply spares\n220 kV grade,XLPE, Single core,1000 sq mm, Copper cable | 1 | KM | |
25 | 21 | Outdoor type cable end termination suitable for 220 KV Single core, 1000 Sqmm Cable along with supply of supporting Terminal structure for CTT tower | 4 | Nos | |
26 | 22 | Normal Straight through joints suitable for 220 KV, single Core,1000 sq mm cable | 6 | Nos | |
27 | 23 | Insulated Joints suitable for 220 kV Single Core 1000 sq mm Cable | 6 | Nos | |
28 | 24 | 220 KV Lightning Arrester along with supporting structure | 6 | Nos | |
29 | 25 | A3) Erection Laying of 220 kV single core, 1000 sq. mm copper cable in flat formation, tagging, fixing, pipes for drain & gate xing as per drg & specification in trench pipes, ducts by pulling, drg etc., including cables, using std cable installation equipment & as directives of Engr. In charge etc. | 11 | KM per CKT | |
30 | 26 | Handling & making of normal straight through joints for 220 kV S/C power cable with all consumables at site & connection of copper bonding cables to single phase link box as well as to earthingwell as point, i.e. connection to copper rod, including erection of single phase link box | 24 | Nos | |
31 | 27 | Handling & making of insulated through joints along with three phase link boxes for 220 kV single core power cable with all consumables& connection of copper bonding cables to single phase link box as well as to earthingwell as point, i.e. connection to copper rod, including erection of three phase link box | 66 | Nos | |
32 | 28 | Handling & making of cable end in door terminations along with single phase link boxes for 220 kV single core copper cable at 220 kV SS including erection of LA, single phase link box with safety lock arrangements & connection of bonding cables, earthing etc. as per directives of Engr In charge | 1 | Sets per CKT | |
33 | 29 | Handling & making of cable out door terminations along with single phase link boxes for 220 kV single core copper cable at CTT, including erection of L.A & supporting insulators on CTT tower along with supporting structure, clamps, connection of cables to conductors etc. | 24 | Sets per CKT | |
34 | 30 | Charges for conducting precommissioning test from CPRI & successul commissioning of circuit | 2 | L.S | |
35 | 31 | Laying of Fiber Optic cable 48 fiber unarmored cable along with HDPE duct with MUX/Necessary constructional equpment & with end termination to be taken up by the bidder as per site requirement | 5.5 | KM | |
36 | 32 | 220 KV Lightning Arrester erection | 24 | Nos | |
37 | 33 | Erection of CTT towers for cable termination including proper fixing of 220 kV cables, OPGW cables with cable fixing clamps , tower accessories | 84.5 | MT | |
38 | 34 | Destringing of 0.4 ACSR conductor 220 kV D/C on D/C tower | 0.7 | KM | |
39 | 35 | Restringing of 0.4 ACSR conductor 220 kV D/C on M/C tower (CTT tower) | 0.7 | KM | |
40 | 36 | Destringing of OPGW E/W on 220 kV D/C & M/C tower | 0.7 | KM | |
41 | 37 | Destringing of OPGW E/W on 220 kV CTT tower | 0.7 | KM | |
42 | 38 | Restringing of OPGW E/W on CTT tower | 0.7 | KM | |
43 | 39 | Dismantling of 0.4 ACSR conductor D/C on D/C conductor along with OPGW E/W | 5.5 | KM | |
44 | 40 | Dismantling of 220 kV , D/C & M/C tower | 587 | KM | |
45 | 41 | Tack welding: For CTT towers(M/C) | 2 | Nos | |
46 | 42 | A4) Civil 220 kV Laying of cable along the route: 5.5 Km\n\na) Excavation in all types of soil includingroad cutting, dewatering, making compactedsand sub base of 100 mm thick & backfillingusing excavated soil, RCC slabs, warning taperoute markers, etc. including road crossing asper directives of Engineer in – charge.\n | 12967.6 | Cum | |
47 | 43 | For road crossing work. Fixing of HDPE pipes with concreting for road crossing.\nQuantity of 1:1.5:3 concrete:\n | 526.4 | Cum | |
48 | 44.1 | Concreting & Reinforcement with epoxy/Metacam painting for RCC slabs.\nFor regular trench & Joint Bay a) Concreting with 1:1.5:3:\nTotal concrete volume of slabs excluding joint bay\n | 343.6 | Cum | |
49 | 44.2 | b) Reinforcement: | 27.1 | MT | |
50 | 45 | Preparing Joint Bays having dimensions6mtr x 2 mtr x 2mtr with brick walls & PCC atbottom along with construction of link box as per directivesof engineer in charge. | 30 | Nos | |
51 | 46 | Detail survey of route including section finalisation, joint bay finalisation, tower spotting, preparing of profiles, route drawing in auto cad with GPS coordinates, railway xing / river xing drawings, etc. showing cross section views at major points as per directives of Engr. In charge & as per requirement of various government authorities etc. | 5.5 | KM | |
52 | 47 | Check survey: Submission of all respective drawings with proper GPS coordinates for all major points, such as section starts, section end, road start, road end, railway xing, river xing, tower spotting, Joint Bay positions etc. as per directives of Engr. In charge & as per requirements of various government authorities etc. | 5.5 | KM | |
53 | 48.1 | Excavation of pits for tower footing in earth soil of all types including removing of excavated material beyond tower limits up to 50 mtrs, lead & all lifts, shoring, shuttering, dewatering, preparation of bed for foundation & back filling after casting and curing of foundations, with ramming etc. complete in all respect as per drawing and direction of Engr. In charge. a. Normal/Yellow/Sandy/Loose soil with lime & clay boulders/soft murum | 1 | Cum | |
54 | 48.2 | b. Black cotton soil / Submerged soil | 2130.8 | Cum | |
55 | 48.3 | c. Soft rock / Hard murum | 1 | Cum | |
56 | 48.4 | d. Dry fissured rock | 112.2 | Cum | |
57 | 48.5 | e. Hard rock by chiselling | 1 | Cum | |
58 | 49.1 | Concreting of foundation: Providing & casting in situ cement concrete of trap metal of size 20 to 40 mm as applicable including cost of cement, sand, metal, water, grame work, finishing, compacting, coping and curing for 21 days complete as per drawing and direction of Engr. In charge in the following grades. a. M30 with graded metal for foundation | 1 | Cum | |
59 | 49.2 | b. M20 (1:1.5:3) with graded metal for foundation | 995.1 | Cum | |
60 | 49.3 | c. M15 (1:2:4) with graded metal for foundation / coping | 1 | Cum | |
61 | 49.4 | d. M10 (1:3:6) with graded metal for foundation / coping / bedding | 32.1 | Cum | |
62 | 49.5 | e. M 7.5 (1:4:8) with graded metal for foundation / bedding | 1 | Cum | |
63 | 50 | Providing & fixing in position steel reinforcement in concrete foundation including supply of TMT bars with epoxy coating / Meta cam of various diameters for RCC work like raft, footing of column etc. as per drawing and direction which will be furnished by the owner including cutting, bending, hooking the bars, binding with binding wire or tack welding etc. complete as directed (steel to be provided by Contractor) | 88.7 | MT | |
64 | 51.1 | Stub setting in all types of soils with the help of templete /PROB including transportation if required to the desired location, fixing the stubs in position as per the alignment, fixing & levelling the templete& the stub as directed. a. 220 kV Special tower (CTT) | 2 | per location | |
65 | 52 | Pipe type earthing as per approved drawing of MSECL & as per directives of Engineer In charge | 2 | Nos | |
66 | 53 | Removal of stub | 38 | per tower |